visibility Similar

#Apollo50th. NASA public domain image colelction.

STS092-347-018 - STS-092 - Lopez-Alegria hydrates a food packet

Doi draws a picture with soybean crayons

Official Portrait of Astronaut Mike Foreman

Airlock Battery Charge module. NASA public domain image colelction.

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Mallory Jennings, left, and Heather Paul, aerospace engineers with Johnson Space Center's Spacesuit Life Support, perform a spacesuit demonstration during the STS-134 Tweetup event. About 150 people from 43 states, Washington, D.C., and half a dozen countries are participating in the event. A Tweetup gives followers of @NASA on the social messaging medium Twitter the opportunity to tour the center, view a shuttle launch and speak with NASA managers, astronauts, shuttle technicians and engineers. During the STS-134 mission, space shuttle Endeavour will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. Endeavour was scheduled to launch at 3:47 p.m. on April 29, but that attempt was scrubbed for at least 72 hours while engineers assess an issue associated with the shuttle's Auxiliary Power Unit 1. STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-3153

GEMINI-TITAN GT-IX - EARTH-SKY - AUGMENTED TARGET DOCKING ADAPTER ATDA - MSC

Earth observation image of Newfoundland, Canada taken during STS-100

KENNEDY SPACE CENTER, FLA. - At SPACEHAB in Cape Canaveral, Fla., STS-116 Mission Specialists Sunita Williams (left) and Joan Higginbotham get a close look at the rack front stowage trays that are used inside the SPACEHAB module. Mission crews make frequent trips to the Space Coast to become familiar with the equipment and payloads they will be using. STS-116 will be mission number 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. Launch is scheduled for no earlier than Dec. 7. Photo credit: NASA/George Shelton KSC-06pd2250

code Related

STS-104 Emergency Egress Training (Launch) at Bldg.9, CCT

description

Summary

JSC2001-E-06419 (27 February 2001) --- Astronaut Janet L. Kavandi, mission specialist, during mission training at the Johnson Space Center’s Systems Integration Facility. The STS-104 mission to the International Space Station (ISS) represents the Space Shuttle Atlantis’ first flight using a new engine and is targeted for a liftoff no earlier than June 14, 2001.

label_outline

Tags

robert markowitz johnson space center sts emergency egress emergency egress launch cct astronauts nasa
date_range

Date

27/02/2001
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Cct, Robert Markowitz, Emergency Egress

KENNEDY SPACE CENTER, FLA. - For the second time in two days, STS-121 Mission Specialist Stephanie Wilson is suiting up for a launch attempt on Space Shuttle Discovery. The first launch attempt July 1 was scrubbed due to weather concerns and postponed 24 hours. The launch is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. During the 12-day mission, the STS-121 crew will test new equipment and procedures to improve shuttle safety, as well as deliver supplies and make repairs to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1364

KENNEDY SPACE CENTER, FLA. -- STS-120 Mission Specialist Stephanie Wilson is helped with her boot during suitup for a simulated launch countdown, part of the prelaunch terminal countdown demonstration test, or TCDT. Her name patch reflects the nicknames the crew gave each other for the event. The TCDT provides astronauts and ground crews an opportunity to participate in various launch preparation activities, including equipment familiarization, emergency training and the simulated countdown. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station. Launch of Discovery on mission STS-120 is targeted for Oct. 23 at 11:38 a.m. EDT on a 14-day mission. Photo credit: NASA/Kim Shiflett KSC-07pd2768

[Tropical Storm Fay] Crawfordville, FL, September 2, 2008 -- In Wakulla County along the St .Marks River, FEMA Community Relations(CR) Specialist Karen Graham and State Emergency Response Team(SERT) member John Probert tell this resident about FEMA services and registration process. FEMA is here in response to flooding from Tropical Storm Fay. George Armstrong/FEMA

STS-131 suited payload egress training (FFT PLD EG 91019) with the STS-131 crew.

STS051-24-014 - STS-051 - Launch and entry suits

S115E07956 - STS-115 - Ferguson assists Stefanyshyn-Piper with her LES during STS-115 Space Shuttle Atlantis

A special operations troop conducts close air support

STS109-320-009 - STS-109 - EVA 5 - egress from airlock (underexposed)

KENNEDY SPACE CENTER, Fla. -- At the 167-foot level of the Fixed Service Structure on Launch Pad 39A, the STS-99 crew pose for a photograph during Terminal Countdown Demonstration Test (TCDT) activities. Standing left to right are Mission Specialist Janet Lynn Kavandi (Ph.D.), Commander Kevin Kregel, Mission Specialists Janice Voss (Ph.D.), Gerhard Thiele and Mamoru Mohri, and Pilot Dominic Gorie. Thiele is with the European Space Agency and Mohri is with the National Space Development Agency (NASDA) of Japan. Behind them (left) are visible the top of a solid rocket booster (white) and external tank (orange). The TCDT provides the crew with simulated countdown exercises, emergency egress training, and opportunities to inspect the mission payloads in the orbiter's payload bay. STS-99 is the Shuttle Radar Topography Mission, which will chart a new course, using two antennae and a 200-foot-long section of space station-derived mast protruding from the payload bay to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Besides contributing to the production of better maps, these measurements could lead to improved water drainage modeling, more realistic flight simulators, better locations for cell phone towers, and enhanced navigation safety. Launch of Endeavour on the 11-day mission is scheduled for Jan. 31 at 12:47 p.m. EST KSC00pp0044

KENNEDY SPACE CENTER, FLA. -- STS-107 Mission Specialist Laurel Clark arrives at KSC to take part in Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. Other crew members are Commander Rick Husband, Pilot William "Willie" McCool, Payload Commander Michael Anderson, Mission Specialists Kalpana Chawla and David Brown, and Payload Specialist Ilan Ramon, the first Israeli astronaut. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is scheduled for Jan. 16, 2003. KSC-02pd1922

KENNEDY SPACE CENTER, FLA. -- STS-101 Mission Specialist Susan J. Helms adjusts her helmet after climbing into her seat inside Space Shuttle Atlantis for a simulated launch countdown. The countdown is part of Terminal Countdown Demonstration Test (TCDT) activities that also include emergency egress training and familiarization with the payload. Other crew members taking part are Commander James D. Halsell Jr., Pilot Scott J. "Doc" Horowitz and Mission Specialists Mary Ellen Weber, James Voss, Jeffrey N. Williams, and Yury Usachev of Russia. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A KSC00pp0473

STS-335crew and training team during Payload Egress Training

Topics

robert markowitz johnson space center sts emergency egress emergency egress launch cct astronauts nasa