visibility Similar

code Related

Stability Tunnel - GPN-2000-001246

description

Summary

Engineers operate the controls of the Stability Tunnel. Plans for a new tunnel to study stability problems began in the late thirties. The Stability Tunnel was authorized in 1939 and began operations in June 1941. The installation was finished in December that year with the completion of a new 10,000 Horsepower Diesel-electric generating plant. It was a single return, closed jet tunnel with a 6-foot square test section. The tunnel was disassembled and shipped to Virginia Polytechnic Institute and State University in 1958. The tunnel had two separate test sections: one for curved flow, the other for rolling flow. "The facility... simulates the motion of the aircraft in curved or rolling flight. This is done by actually curving or rolling the airstream as it passes over the model and at the same time providing the proper velocity distribution."

label_outline

Tags

exteriors of wind tunnels great images in nasa national advisory committee for aeronautics naca wind tunnels of nasa high resolution
date_range

Date

10/03/1943
create

Source

Wikimedia Commons
link

Link

http://commons.wikimedia.org/
copyright

Copyright info

public domain

label_outline Explore National Advisory Committee For Aeronautics Naca, Great Images In Nasa

Topics

exteriors of wind tunnels great images in nasa national advisory committee for aeronautics naca wind tunnels of nasa high resolution