visibility Similar

STS-131 Flight Control Team in WFCR - Planning - Flight Director: Ginger Kerrick

STS-130 - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, Fla. -- The STS-118 crew walks out of the Operations and Checkout Building, heading for Launch Pad 39A and a simulated launch countdown. On the left, Pilot Charlie Hobaugh leads one column, with Mission Specialist Rick Mastracchio behind him. On the right, Commander Scott Kelly leads, with Mission Specialists Tracy Caldwell and Dave Williams behind. Not pictured are Mission Specialists Alvin Drew and teacher-turned-astronaut Barbara R. Morgan. The countdown concludes the terminal countdown demonstration test, or TCDT. The STS-118 crew has been at Kennedy for the TCDT activities that also include M-113 training, payload familiarization and emergency egress training at the pad. The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7. Photo credit: NASA/George Shelton KSC-07pd1975

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-129 crew members put on their launch-and-entry suits before heading to the Astrovan for the 15-minute ride to Launch Pad 39A. Mission Specialist Leland Melvin, seen here, is ready for launch. Liftoff is set for 2:28 p.m. EST Nov. 16. On STS-129, the crew will deliver two Express Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory. STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6306

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-134 Mission Specialist Michael Finke checks out some of the tools and equipment he'll be using in space. The six-member crew is at Kennedy participating in the Crew Equipment Interface Test (CEIT), which gives them an opportunity for hands-on training and familiarization of the payload they'll be delivering to the International Space Station. Space shuttle Endeavour is targeted to launch on the STS-134 mission Feb. 27, 2011. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Cory Huston KSC-2010-5534

KENNEDY SPACE CENTER, FLA. -- At a post-landing news conference, Assistant Administrator for NASA Public Affairs David Mould (left) introduces NASA Associate Administrator for Space Operations William Gerstenmaier and Shuttle Launch Director Mike Leinbach. They concurred they were happy with the performance of space shuttle Atlantis on the STS-122 mission and looking forward to the next mission, STS-123 in March. After a round trip of nearly 5.3 million miles, space shuttle Atlantis and crew returned to Earth with a landing at 9:07 a.m. EST. The shuttle landed on orbit 202 to complete the 13-day STS-122 mission. Main gear touchdown was 9:07:10 a.m. Nose gear touchdown was 9:07:20 a.m. Wheel stop was at 9:08:08 a.m. Mission elapsed time was 12 days, 18 hours, 21 minutes and 44 seconds. During the mission, Atlantis' crew installed the new Columbus laboratory, leaving a larger space station and one with increased science capabilities. The Columbus Research Module adds nearly 1,000 cubic feet of habitable volume and affords room for 10 experiment racks, each an independent science lab. Photo credit: NASA/Jim Grossmann KSC-08pd0409

STS-32 COLUMBIA - ORBITER VEHICLE (OV)-102 - OFFICIAL CREW PORTRAIT

170723-N-LC424-449 PACIFIC OCEAN (July 23, 2017) Engineman

s133E013056 - STS-133 - EVA 2 - Public domain NASA photogrpaph

code Related

SPACE SHUTTLE STS-131 MISSION AT GSFC

description

Summary

The original finding aid described this as:

Description: SPACE SHUTTLE MISSION STS 131 LANDING AT NETWORK INTEGRATION CENTER, NASCOM,FLIGHT DYNAMICS FACILITY, AT GODDARD SPACE FLIGHT CENTER .

Date: 40287

Job Number: 2010-01803-0

Preservation Copy: .tif

2010

Nothing Found.

label_outline

Tags

space shuttle space shuttle sts mission gsfc sts 131 discovery nasa high resolution ultra high resolution space shuttle sts 131 mission space shuttle mission sts goddard space flight center network integration center flight dynamics facility job number preservation copy space program
date_range

Date

2006 - 2011
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Space Shuttle Sts 131 Mission, Flight Dynamics Facility, Network Integration Center

Topics

space shuttle space shuttle sts mission gsfc sts 131 discovery nasa high resolution ultra high resolution space shuttle sts 131 mission space shuttle mission sts goddard space flight center network integration center flight dynamics facility job number preservation copy space program