visibility Similar

code Related

SEP HEAT PIPE TEST SETUP IN CLEAN ROOM AREA OF THE 8X6 FOOT WIND TUNNEL SHOP

description

Summary

The original finding aid described this as:

Capture Date: 5/29/1979

Keywords: Larsen Scan

Location Building No: 54

Photographs Relating to Agency Activities, Facilities and Personnel

Nothing Found.

label_outline

Tags

sep heat pipe test setup sep heat pipe test setup clean room clean room area foot shop nasa wind tunnel national aeronautics and space administration high resolution ultra high resolution foot wind tunnel shop nasa photographs 1970 s space program us national archives
date_range

Date

1979
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Foot Wind Tunnel Shop, Setup, Sep

The air conditioning machinery room aboard the guided missile frigate NICHOLAS (FFG-47)

FL Olmsted, Jr. sitting in the parlor at Fairsted

Two crewmen work in the catapult control room aboard the nuclear-powered aircraft carrier USS THEODORE ROOSEVELT (CVN 71)

NAVY VANE HOLE PLUGGING TEST SETUP

[Table setup plans, Aero Club of the United Kingdom]

Auxiliary machinery room No.1 aboard the guided missile frigate RODNEY M. DAVIS (FFG 60) at 40 percent completion

QCSEE QUIET CLEAN STOL EXPERIMENTAL ENGINE INLET MODEL IN THE 9X15 FOOT LOW SPEED WIND TUNNEL LSWT

Flooding ^ Hurricane/Tropical Storm ^ Severe Storm - Mandeville, La. , Sep. 10, 2012 -- Daniel LLargues, a FEMA PIO talks to Steve Martin, a homeowner in the old section of Mandeville, La. Martin's home suffered water damage when Hurricane Isaac pushed water into his yard. The Martin's lost electrical power but their home was saved because it was elevated. FEMA is working with local, state and other federal agencies to provide assistance to homeowners who want to raise their homes to the current recommended height of at least 12 feet above the ground. Photo by Patsy Lynch/FEMA

ENGINE RESEARCH BUILDING ERB 8X11 TEST CELL SE-6 AND TEST CELL SE-4 CONTROL ROOM

QCGAT QUIET CLEAN GENERAL AVIATION TURBOFAN ENGINE NACELLE

Boulder, Colo., Sep. 16, 2013 -- Morning briefing for Urban Search and Research (USAR) teams at Boulder Airport. USAR teams are deployed to assist in the Colorado Flood response. Photo by Michael Rieger/FEMA

2 HIGH TEMPERATURE PRESSURE FURNACES IN THE MATERIALS AND STRESSES M&S BUILDING ROOM 31

Topics

sep heat pipe test setup sep heat pipe test setup clean room clean room area foot shop nasa wind tunnel national aeronautics and space administration high resolution ultra high resolution foot wind tunnel shop nasa photographs 1970 s space program us national archives