visibility Similar

code Related

Saturn Apollo Program comparative sizes of the rocket engines

description

Summary

This drawing clearly shows the comparative sizes of the rocket engines used to launch the Saturn vehicles. The RL-10 and the H-1 engines were used to launch the Saturn I rockets. The J-2 engine was used on the second stage of Saturn IB and the second and third stages of Saturn V. The F-1 engine was used on the first stage of the Saturn V.

label_outline

Tags

saturn engines rl 10 h 1 j 2 f 1 msfc marshall space flight center saturn apollo program rocket engines saturn apollo program saturn vehicles saturn ib h 1 engines j 2 engine f 1 engine sizes second stage third stages first stage rockets nasa
date_range

Date

01/01/1963
place

Location

Marshall Spaceflight Center, Huntsville, Madison County, Alabama, United States, 35808 ,  34.63076, -86.66505
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Third Stages, J 2 Engine, F 1

Static Test Firing of Saturn V S-1C Stage

U.S. Marine Corps Lt. Col. John C. Golden, commanding

Conversion. Copper and brass processing. Stocks of partially completed lengths of seamless copper tube in many sizes. These have still to go through several more draws through dies on drawbenches. Each draw reduces them in diameter and wall thickness, and lengthens them out. Then, before the tubes leaves the mill, the ends will be sawed off straight and clean. Chase Copper and Brass Company, Euclid, Ohio

Saturn V - Saturn Apollo Program

Marine Light Attack Helicopter Squadron 267 AH-1Z Viper

CAPE CANAVERAL, Fla. – As part of NASA's Ground Systems Development and Operations Program at the Kennedy Space Center in Florida, a large space shuttle-era work platform is being lowered and removed from high bay 3 of the Vehicle Assembly Building, or VAB. The work is part of a center-wide modernization and refurbishment initiative to accommodate NASA’s Space Launch System and a variety of other spacecraft instead of the whole building supporting one design. The Ground Systems Development and Operations Program is developing the necessary ground systems, infrastructure and operational approaches required to safely process, assemble, transport and launch the next generation of rockets and spacecraft in support of NASA’s exploration objectives. Future work also will replace the antiquated communications, power and vehicle access resources with modern efficient systems. Some of the utilities and systems slated for replacement have been used since the VAB opened in 1965. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann KSC-2012-5965

KENNEDY SPACE CENTER, FLA. - After being raised to a vertical position, the first stage of an Atlas V rocket is being moved into the Vertical Integration Facility to begin preparations for launch on Launch Complex 41 at Cape Canaveral Air Force Station. The Lockheed Martin Atlas V is the launch vehicle for the New Horizons spacecraft, which is designed to make the first reconnaissance of Pluto and Charon - a "double planet" and the last planet in our solar system to be visited by spacecraft. The mission will then visit one or more objects in the Kuiper Belt region beyond Neptune. New Horizons is scheduled to launch in January 2006, swing past Jupiter for a gravity boost and scientific studies in February or March 2007, and reach Pluto and its moon, Charon, in July 2015. KSC-05pd2268

Marines and Sailors with II Marine Expeditionary Force

U.S. Air Force Staff Sgt. Stacy Strange, U.S. Africa

U.S. Marine Corps Sgt. Maj. Harry J. Green, outgoing

Marshall Space Flight Center, Saturn Propulsion & Structural Test Facility, East Test Area, Huntsville, Madison County, AL

At Launch Pad 36A on the Cape Canaveral Air Station, the first stage of a Lockheed Martin Atlas II rocket is lifted into an upright position. The rocket will be used to launch the Geostationary Operational Environmental Satellite-L (GOES-L). GOES-L is the latest in the current series of advanced geostationary weather satellites in service. Once in orbit, it will become GOES-11 and function as an on-orbit spare to be activated when one of the operational satellites needs to be replaced. Launch is scheduled for Saturday, May 15 at the opening of a launch window which extends from 2:23 to 4:41 a.m. EDT KSC-99pp0423

Topics

saturn engines rl 10 h 1 j 2 f 1 msfc marshall space flight center saturn apollo program rocket engines saturn apollo program saturn vehicles saturn ib h 1 engines j 2 engine f 1 engine sizes second stage third stages first stage rockets nasa