visibility Similar

NASA ENGINE FAILURE YJ-101 - Glenn Research Center History

STS101-387-019 - STS-101 - Documentation of hatch hardware in the ODS

S88E5067 - STS-088 - MIGHTYSAT 1 - views in the payload bay

STS-132 ATLANTIS - CHIN STRAP INSTALLATION 2010-1246

SOLAR DYNAMIC FLIGHT DEMONSTRATION PROGRAM TUNGSTEN FOIL APERATURE SHIELD TEST ARTICLE BUILT BY ALLIED SIGNAL AND AEROSPACE DESIGN AND DEVELOPMENT FOR THERMAL SHOCK TESTING IN TANK 6

S122E007981 - STS-122 - Columbus Vestibule Outfitting during Expedition 16/STS-122 Joint Operations

KENNEDY SPACE CENTER, FLA. - In the Space Shuttle Main Engine (SSME) Processing Facility, Boeing-Rocketdyne technicians prepare to move SSME 2058, the first SSME fully assembled at KSC. Move conductor Bob Brackett (on ladder) supervises the placement of a sling around the engine with the assistance of crane operator Joe Ferrante (center) and a technician. The engine will be lifted from its vertical work stand into a horizontal position in preparation for shipment to NASA’s Stennis Space Center in Mississippi to undergo a hot fire acceptance test. It is the first of five engines to be fully assembled on site to reach the desired number of 15 engines ready for launch at any given time in the Space Shuttle program. A Space Shuttle has three reusable main engines. Each is 14 feet long, weighs about 7,800 pounds, is seven-and-a-half feet in diameter at the end of its nozzle, and generates almost 400,000 pounds of thrust. Historically, SSMEs were assembled in Canoga Park, Calif., with post-flight inspections performed at KSC. Both functions were consolidated in February 2002. The Rocketdyne Propulsion and Power division of The Boeing Co. manufactures the engines for NASA. KSC-04pd1641

PMA2 and U.S. Lab as seen during STS-114 rendezvous for docking

CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, cranes attached to the Ares I-X center forward segment lift it off the transporter to raise it to vertical. Once vertical, the segment will be moved to a stand. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Launch of the Ares I-X flight test is targeted for July 2009. Photo credit: NASA/Troy Cryder KSC-2009-2494

code Related

Saturn I S-I stage with eight H-1 engines - Saturn Apollo Program

description

Summary

The Saturn I S-I stage with eight H-1 engines, located in Marshall Space Flight Center building 4705, showing the positioning of eight H-1 engines. The Saturn I S-I stage had eight H-1 engines clustered, using liquid oxygen/kerosene-1 (LOX/RP-1) propellants capable of producing a total of 1,500,000 pounds of thrust.

Nothing Found.

label_outline

Tags

saturn i s i stage h 1 engines msfc marshall space flight center saturn apollo program high resolution eight h 1 engines saturn apollo program nasa
date_range

Date

01/01/1961
place

Location

Marshall Spaceflight Center, Huntsville, Madison County, Alabama, United States, 35808 ,  34.63076, -86.66505
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore S I Stage, Eight H 1 Engines, Saturn I

Marshall Space Flight Center, Saturn Propulsion & Structural Test Facility, East Test Area, Huntsville, Madison County, AL

Saturn V - Saturn Apollo Program

AST-05-314 - Apollo Soyuz Test Project - Apollo Soyuz Test Project, MA-148 Equipment, Tunnel Door Aiar

Marshall Space Flight Center, Saturn V Dynamic Test Facility, East Test Area, Huntsville, Madison County, AL

Ultraviolet Panorama - Skylab Experiment S183

KENNEDY SPACE CENTER, FLA. -- Boeing technicians move a piece of hardware into position on Node 1 of the International Space Station (ISS) in KSC's Space Station Processing Facility in preparation for mating with Pressurized Mating Adapter (PMA)-2. The node is the first element of the ISS to be manufactured in the United States and is currently scheduled to lift off aboard the Space Shuttle Endeavour on STS-88 later this year, along with PMAs 1 and 2. The 18-foot-in-diameter, 22-foot-long aluminum module was manufactured by the Boeing Co. at Marshall Space Flight Center. Once in space, Node 1 will function as a connecting passageway to the living and working areas of the ISS. It has six hatches that will serve as docking ports to the U.S. laboratory module, U.S. habitation module, an airlock and other space station elements KSC-98pc539

HEROES PAYLOAD AWAITS LAUNCH AS HELIUM BALLOON INFLATES IN BACKGROUND, FORT SUMNER, NEW MEXICO, SEPTEMBER 21, 2013 1301100

Workers guide the No. 3 propeller from the battleship MISSOURI (BB-63) as it is lowered by a crane during a modernization program

Wernher von Braun, America Space Program

A worker prepares the No. 4 propeller for removal from the battleship MISSOURI (BB-63) in dry dock No. 1 as part of a modernization program

Saturn V launch vehicle for the Apollo 4

Saturn Apollo Program - Apollo Spacecraft configuration

Topics

saturn i s i stage h 1 engines msfc marshall space flight center saturn apollo program high resolution eight h 1 engines saturn apollo program nasa