visibility Similar

code Related

S128E008374 - STS-128 - MPLM Hatch in Node 2 Harmony

description

Summary

The original finding aid described this as:

Description: View of the closed hatch leading to the multipurpose logistics module (MPLM) from Node 2 Harmony during STS-128. Chris Fuglesang works at the hatch.

Subject Terms: STS-128, Hatches, Multipurpose Logistics Modules, Astronauts

Date Taken: 9/7/2009

Categories: Station Configuration

Interior_Exterior: Interior

Ground_Orbit: On-orbit

Element: Node 2

Original: Digital Still

Preservation File Format: TIFF

STS-128

Nothing Found.

label_outline

Tags

mplm hatch mplm hatch node harmony nasa sts 128 discovery high resolution ultra high resolution sts 128 tiff sts 128 multipurpose logistics modules logistics module chris fuglesang works preservation file format station configuration astronauts space program
date_range

Date

2009
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Mplm Hatch, Multipurpose Logistics Modules, Logistics Module

Harmony Manufacturing Company, Mill Number 3, 100 North Mohawk Street, Cohoes, Albany County, NY

S131E013611 - STS-131 - PLB and MPLM

S128E010632 - STS-128 - PLB and MPLM

S123E006591 - STS-123 - Reisman in the FGB hatch area during Joint Operations

S128E007304 - STS-128 - Robert Thirsk in Service Module (SM)

S128E008495 - STS-128 - PLB during MPLM Berthing OPS

S85E5047 - STS-085 - SWUIS - Robinson works with telescope mounted in the side hatch window

S115E06100 - STS-115 - Jett and Reiter close the hatch in the Air Lock during Expedition 13 / STS-115 Joint Operations

S114E5510 - STS-114 - Hatch opening

KENNEDY SPACE CENTER, FLA. -- The STS-122 crew poses for a group portrait near Launch Pad 39B during a training session on the operation of the M-113 armored personnel carrier. An M-113 will be available to transport the crew to safety in the event of an emergency on the pad before their launch. From left are Mission Specialists Rex Walheim, Leopold Eyharts and Hans Schlegel of the European Space Agency, Stanley Love; Commander Steve Frick; Pilot Alan Poindexter; and Mission Specialist Leland Melvin. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3334

S128E008458 - STS-128 - MPLM Berthing OPS from RWS

STS091-379-002 - STS-091 - STS-91 crew is greeted at the hatch by Mir 25 crewmembers

Topics

mplm hatch mplm hatch node harmony nasa sts 128 discovery high resolution ultra high resolution sts 128 tiff sts 128 multipurpose logistics modules logistics module chris fuglesang works preservation file format station configuration astronauts space program