visibility Similar

code Related

Production. Steam power plant equipment. An automatic electric arc-welder runs a long seam on a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. An electric arc-welder runs a seam on a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Electric arc-welders run a long seam on a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. An electric arc-welder runs a seam on a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Electric arc-welders run a long seam on a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Electric arc-welders run a long seam on a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Electric arc-welders run a long seam on a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Chipping slag from a long arc-welded seam of a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. Chipping slag from a long arc-welded seam of a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Production. Steam power plant equipment. An automatic electric arc-welder runs a long seam on a new high-pressure boiler. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

description

Summary

Actual size of negative is C (approximately 4 x 5 inches).

Title and other information from caption card.

Transfer; United States. Office of War Information. Overseas Picture Division. Washington Division; 1944.

More information about the FSA/OWI Collection is available at http://hdl.loc.gov/loc.pnp/pp.fsaowi

Film copy on SIS roll 32, frame 626.

label_outline

Tags

tennessee hamilton county chattanooga safety film negatives alfred t palmer united states office of war information photo steam power plant equipment steam boilers power house equipment tennessee valley authority boiler chattanooga shops office of war information farm security administration united states history library of congress
date_range

Date

01/01/1942
place

Location

chattanooga
create

Source

Library of Congress
link

Link

https://www.loc.gov/
copyright

Copyright info

Public Domain

label_outline Explore Steam Power Plant Equipment, Chattanooga Shops, Power House Equipment

Production. Parachute making. There is far more to hemming this parachute than running the sewing machine. The operator must match pencil marks on the braid with pencil marks on the seams to turn out infallible parachutes for men in the Air Force. Pioneer Parachute Company, Manchester, Connecticut

Goony bird detail, Sir Goony Golf, Chattanooga, Tennessee

A black and white photo of a black and white eclipse, possibly related to: Rail fence on road to Chattanooga, Tennesse

Si Klegg: the deacon's adventures at Chattanooga in caring for the boys

Production. BT-13A ("Valiant") basic trainers. Wings for "Valiant" basic trainers at Vultee's Downey, California plant. At the Downey plant is made the BT-13A ("Valiant") basic trainer--a fast, sturdy ship powered by a Pratt and Whitney Wasp engine

Lt. Greg Early, a platoon leader assigned to C Company,

Power and conservation. Chickamauga Dam, Tennessee Valley Authority (TVA). Insulators and bus wires in the switchyard of the TVA's Chickamauga Dam, located near Chattanooga, 471 miles above the mouth of the Tennessee River. The dam has an authorized power installation of 81,000 kilowatts, which can be increased to a possible ultimate of 108,000 kilowatts. The reservoir at the dam adds 377,000 acre feet of water to controlled storage on the Tennessee River system. The power that passes through this switchyard serves many useful domestic, agricultural and industrial uses

Chickamauga Dam, Tennessee (Tennessee Valley Authority (TVA)). Generators

Tire recapping. A recap job on a passenger car tire. The tire with a tread strip of reclaimed camelback rubber is put into a curing mold. The old tread surface had previously been ground down evenly and coated with rubber adhesive. The plan to recap passenger tires with reclaimed rubber camelback, approved by rubber director William M. Jeffers, was put into effect in February 1943 to reduce the demand for replacement tires and still keep civilian cars in service

Power and conservation. Chickamauga Dam, Tennessee Valley Authority (TVA). Switchyard of the TVA's Chickamauga Dam, located near Chattanooga, 471 miles above the mouth of the Tennessee River. The dam has an authorized power installation of 81,000 kilowatts, which can be increased to a possible ultimate of 108,000 kilowatts. The reservoir at the dam adds 377,000 acre feet of water to controlled storage on the Tennessee River system. The power that passes through this switchyard serves many useful domestic, agricultural and industrial uses

Si Klegg: the deacon's adventures at Chattanooga in caring for the boys

Contractors from C.J. Mahan working for the U.S. Army

Topics

tennessee hamilton county chattanooga safety film negatives alfred t palmer united states office of war information photo steam power plant equipment steam boilers power house equipment tennessee valley authority boiler chattanooga shops office of war information farm security administration united states history library of congress