visibility Similar

Saturn V Arrives at Launch Pad Complex 39

Orbiting Carbon Observatory-2 (OCO-2) Launch

CAPE CANAVERAL, Fla. -- Before the sun sets on Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Discovery is concealed by the pad's rotating service structure. The structure provides weather protection and access to the shuttle. RSS "rollback," as it's called, is a significant milestone in the launch countdown. Launch of Discovery on the STS-133 mission to the International Space Station is set for 3:29 p.m. on Nov. 4. During the 11-day mission, Discovery and its six crew members will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, to the orbiting laboratory. Discovery, which will fly its 39th mission, is scheduled to be retired following STS-133. This will be the 133rd Space Shuttle Program mission and the 35th shuttle voyage to the space station. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5461

Orbiting Carbon Observatory-2 Ready to Blast Off

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Atlantis awaits liftoff from Launch Pad 39A, at right, while processing of the Ares I-X rocket is almost finished on Launch Pad 39B, in the background. The Ares I-X flight test is set for Oct. 27; space shuttle Atlantis' STS-129 launch to the International Space Station is targeted for Nov. 16. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. For information on the STS-129 mission and crew, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Kim Shiflett KSC-2009-5779

STS-133 DISCOVERY AT PAD 39A AFTER ROLLOUT 2010-4779

Saturn V - Saturn Apollo Program

CAPE CANAVERAL, Fla. - NASA Kennedy Space Center workers watch as space shuttle Discovery rolls to a stop on Runway 15 at the Shuttle Landing Facility in Florida. Landing was at 11:57 a.m. EST, completing the 13-day STS-133 mission to the International Space Station. Main gear touchdown was at 11:57:17 a.m., followed by nose gear touchdown at 11:57:28, and wheelstop at 11:58:14 a.m. On board are Commander Steve Lindsey, Pilot Eric Boe, and Mission Specialists Nicole Stott, Michael Barratt, Alvin Drew and Steve Bowen. Discovery and its six-member crew delivered the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the orbiting outpost. STS-133 was Discovery's 39th and final mission. This was the 133rd Space Shuttle Program mission and the 35th shuttle voyage to the space station. Photo credit: NASA/Jack Pfaller KSC-2011-2063

KENNEDY SPACE CENTER, FLA. - On Complex 41 at Cape Canaveral Air Force Station, the Atlas V expendable launch vehicle with the New Horizons spacecraft rolls out of the Vertical Integration Facility (left) on its way to the launch pad. Liftoff is scheduled for 1:24 p.m. EST Jan. 17. After its launch aboard the Atlas V, the compact, 1,050-pound piano-sized probe will get a boost from a kick-stage solid propellant motor for its journey to Pluto. New Horizons will be the fastest spacecraft ever launched, reaching lunar orbit distance in just nine hours and passing Jupiter 13 months later. The New Horizons science payload, developed under direction of Southwest Research Institute, includes imaging infrared and ultraviolet spectrometers, a multi-color camera, a long-range telescopic camera, two particle spectrometers, a space-dust detector and a radio science experiment. The dust counter was designed and built by students at the University of Colorado, Boulder. A launch before Feb. 3 allows New Horizons to fly past Jupiter in early 2007 and use the planet’s gravity as a slingshot toward Pluto. The Jupiter flyby trims the trip to Pluto by as many as five years and provides opportunities to test the spacecraft’s instruments and flyby capabilities on the Jupiter system. New Horizons could reach the Pluto system as early as mid-2015, conducting a five-month-long study possible only from the close-up vantage of a spacecraft. KSC-06pd0072

code Related

Orb3 Antares Rocket Preparation

description

Summary

The Orbital Sciences Corporation Antares rocket, with the Cygnus spacecraft onboard, is seen on launch Pad-0A, Saturday, Oct. 25, 2014, at NASA's Wallops Flight Facility in Virginia. The Antares will launch with the Cygnus spacecraft filled with over 5,000 pounds of supplies for the International Space Station, including science experiments, experiment hardware, spare parts, and crew provisions. The Orbital-3 mission is Orbital Sciences' third contracted cargo delivery flight to the space station for NASA. Launch is scheduled for Monday, Oct. 27 at 6:45 p.m. EDT. Photo Credit: (NASA/Joel Kowsky)

Nothing Found.

label_outline

Tags

antares cygnus mid atlantic regional spaceport mars nasa wallops flight facility orbital sciences corporation orbital 3 orbital 3 resupply mission va wallops island hq nasa joel kowsky orb rocket preparation high resolution rocket engines rocket technology rocket launch nasa
date_range

Date

25/10/2014
place

Location

Wallops Flight Facility ,  37.94074, -75.46742
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Orbital 3, Orbital 3 Resupply Mission, Nasa Wallops Flight Facility

Topics

antares cygnus mid atlantic regional spaceport mars nasa wallops flight facility orbital sciences corporation orbital 3 orbital 3 resupply mission va wallops island hq nasa joel kowsky orb rocket preparation high resolution rocket engines rocket technology rocket launch nasa