visibility Similar

In the Vertical Processing Facility, the Chandra X-ray Observatory is observed after deployment of the solar panel array (near the bottom and to the right). Formerly called the Advanced X-ray Astrophysics Facility, Chandra comprises three major elements: the spacecraft, the science instrument module (SIM), and the world's most powerful X-ray telescope. Chandra will allow scientists from around the world to see previously invisible black holes and high-temperature gas clouds, giving the observatory the potential to rewrite the books on the structure and evolution of our universe. Chandra is scheduled for launch July 9 aboard Space Shuttle Columbia, on mission STS-93 KSC-99pp0362

CAPE CANAVERAL, Fla. – In the space Station Processing Facility at NASA's Kennedy Space Center in Florida, the pump module orbital replacement unit is moved to the Express Logistics Carrier 1, or ELC-1, for installation. The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12. Photo credit: NASA/Jim Grossmann KSC-2009-4723

KENNEDY SPACE CENTER, FLA. -- The U.S. Lab, a component of the International Space Station, is lifted above the three-story vacuum chamber into which the Lab will be placed. The 32,000-pound scientific research lab, named Destiny, is the first Space Station element to spend seven days in the renovated vacuum chamber for a leak test. Destiny is scheduled to be launched on Shuttle mission STS-98, the 5A assembly mission, targeted for Jan. 18, 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research KSC00pp0844

CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., technicians prepare to move the GOES-O satellite onto a special stand for loading of its oxidizer and hydrazine propellants. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES satellites continuously provide observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. The GOES-O satellite is targeted to launch from Cape Canaveral Air Force Station's Launch Complex 37 no earlier than May 12 onboard a United Launch Alliance Delta IV expendable launch vehicle. Photo credit: NASA/Troy Cryder KSC-2009-2576

KENNEDY SPACE CENTER, FLA. -- In space shuttle Discovery's payload bay, STS-120 crew members get a close look at the equipment and payloads. Seen here is Mission Specialist Scott Parazynski. The TCDT provides astronauts and ground crews an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station. Launch of Discovery on mission STS-120 is targeted for Oct. 23 at 11:38 a.m. EDT on a 14-day mission. Photo credit: NASA/Kim Shiflett KSC-07pd2754

VANDENBERG AIR FORCE BASE, Calif. – In the Astrotech payload processing facility on Vandenberg Air Force Base in California, NASA's Orbiting Carbon Observatory-2, or OCO-2, glides across the room from its transportation trailer toward a test fixture. Testing and launch preparations now will get underway for its launch from Space Launch Complex 2 aboard a United Launch Alliance Delta II rocket, scheduled for July 1, 2014. The observatory will collect precise global measurements of carbon dioxide in the Earth's atmosphere and provide scientists with a better idea of the chemical compound's impacts on climate change. Scientists will analyze this data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important atmospheric gas. OCO-2 is a NASA Earth System Science Pathfinder Program mission managed by NASA's Jet Propulsion Laboratory JPL in Pasadena, California, for NASA's Science Mission Directorate in Washington. Orbital Sciences built the spacecraft and provides mission operations under JPL’s leadership. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/Doug Gruben, 30th Space Wing KSC-2014-2483

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers close space shuttle Atlantis' payload bay doors around the hardware for the STS-125 mission to service NASA's Hubble Space Telescope. The hardware includes the Flight Support System with the Soft Capture mechanism and Multi-Use Lightweight Equipment Carrier with the Science Instrument Command and Data Handling Unit, or SIC&DH; the Orbital Replacement Unit Carrier with the Cosmic Origins Spectrograph, or COS; an IMAX 3D camera; and the Super Lightweight Interchangeable Carrier with the Wide Field Camera 3. Atlantis' crew will service NASA's Hubble Space Telescope for the fifth and final time. The flight will include five spacewalks during which astronauts will refurbish and upgrade the telescope with state-of-the-art science instruments. As a result, Hubble's capabilities will be expanded and its operational lifespan extended through at least 2014. Launch is scheduled for 2:01 p.m. EDT on May 11. Photo credit: NASA/Kim Shiflett KSC-2009-3016

CAPE CANAVERAL, Fla. - The first set of two Ogive panels for the Orion Launch Abort System was uncrated inside the Launch Abort System Facility, or LASF, at NASA’s Kennedy Space Center in Florida. One of the panels is being lifted by crane for the move to a storage stand at the other end of the facility. During processing, the panels will be secured around the Orion crew module and attached to the Launch Abort System. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on NASA’s Space Launch System rocket. For more information, visit www.nasa.gov/orion. Photo credit: Dan Casper KSC-2014-2242

Processing Under Way. NASA public domain image colelction.

code Related

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft ACOUSTIC CHAMBER

description

Summary

The original finding aid described this as:

Description: NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft ACOUSTIC CHAMBER

Photographer: DEBBIE MCCALLUM

Date: 7/30/2008

Job Number: 2008-00590-4

Preservation Copy: .tif

2008

Nothing Found.

label_outline

Tags

nasa lunar reconnaissance orbiter lunar reconnaissance orbiter lro spacecraft chamber moon surface moon landing high resolution ultra high resolution spacecraft acoustic chamber debbie mccallum job number preservation copy satellite space program
date_range

Date

2006 - 2011
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Spacecraft Acoustic Chamber, Chamber, Lunar Reconnaissance Orbiter

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft

Straight on medium shot of US Marine GUNNERY Sergeant Elder, Platoon Sergeant, 2nd Platoon, Company A, 5th Force Reconnaissance Battalion, 3rd Marines, lands safely with his MC5 Freefall Square Parachute after completing a 9-thousand foot combat jump from a USAF C-130 Hercules aircraft (Not shown) during Force Reconnaissance Exercises at Andersen Air Force Base, Guam

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft ACOUSTIC CHAMBER

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft ACOUSTIC CHAMBER

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft Launch Event at Goddard Space Flight Center

SPACE SHUTTLE STS-135 CREW VISIT GODDARD SPACE FLIGHT CENTER

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft at Goddard Space Flight Center

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft

KENNEDY SPACE CENTER, FLA. - After being raised to a vertical position, the first stage of an Atlas V rocket is being moved into the Vertical Integration Facility to begin preparations for launch on Launch Complex 41 at Cape Canaveral Air Force Station. The Lockheed Martin Atlas V is the launch vehicle for the New Horizons spacecraft, which is designed to make the first reconnaissance of Pluto and Charon - a "double planet" and the last planet in our solar system to be visited by spacecraft. The mission will then visit one or more objects in the Kuiper Belt region beyond Neptune. New Horizons is scheduled to launch in January 2006, swing past Jupiter for a gravity boost and scientific studies in February or March 2007, and reach Pluto and its moon, Charon, in July 2015. KSC-05pd2268

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft

Topics

nasa lunar reconnaissance orbiter lunar reconnaissance orbiter lro spacecraft chamber moon surface moon landing high resolution ultra high resolution spacecraft acoustic chamber debbie mccallum job number preservation copy satellite space program