visibility Similar

CAPE CANAVERAL, Fla. – Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, a mating device is positioned on a work stand. Preparations are underway to lift the Orion crew and service module stack for Exploration Flight Test-1 out of the test cell and transfer it to the mating device. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch later this year atop a Delta IV Heavy rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Ben Smegelsky KSC-2014-3756

Sonar Technician (Surface) 2nd Class Royce Fletcher operates the winch control console during a multi-functional towed array retrieval aboard the guided-missile destroyer USS Mason (DDG 87).

STS-61 crewmembers in the WETF rehearsing for HST repair mission

RESEARCH AREAS OF THE ELECTRIC PROPULSION RESEARCH BUILDING EPRB

Sonar Technician (Surface) 2nd Class Royce Fletcher

KENNEDY SPACE CENTER, FLA. -- The inside of the first Multi-Purpose Logistics Module (MPLM) for the International Space Station (ISS) is seen after the end cap is removed. The Italian-built module, named Leonardo, is undergoing testing at the Space Station Processing Facility. It is one of three from Alenia Aerospazio, and will be operated by NASA and supported by ASI, the Italian space agency. The MPLMs will be carried in the payload bay of a Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the ISS. Leonardo is scheduled to be launched on STS-100 in December 1999. The second MPLM, named Raffaello, is scheduled to be handed over in April 1999. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc897

.3 Meter TCT Flexwall Control System

P-14 VEHICLE ON THE EXPERIMENTAL PACKAGE

STS101-389-030 - STS-101 - Documentation of the smoke detectrs in ISS

code Related

Movement of Ares 1-X US-4 segment from Building 50 to Building 333

description

Summary

Movement of Ares 1-X US-4 segment from Building 50 to Building 333

NASA Identifier: C-2008-380

Nothing Found.

label_outline

Tags

nasa movement of ares 1 x us 4 segment from building 50 to building 333 dvids high resolution glenn research center aviation research organization ultra high resolution
date_range

Date

12/09/2009
place

Location

create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Movement Of Ares 1 X Us 4 Segment From Building 50 To Building 333, Aviation Research Organization, Glenn Research Center

Topics

nasa movement of ares 1 x us 4 segment from building 50 to building 333 dvids high resolution glenn research center aviation research organization ultra high resolution