visibility Similar

code Related

Model of Full-Scale Tunnel (FST) under construction

description

Summary

Model of Full-Scale Tunnel (FST) under construction. On June 26, 1929, Elton W. Miller wrote to George W. Lewis proposing the construction of a model of the full-scale tunnel. "The excellent energy ratio obtained in the new wind tunnel of the California Institute of Technology suggests that before proceeding with our full scale tunnel design, we ought to investigate the effect on energy ratio of such factors as: 1. small included angle for the exit cone; 2. carefully designed return passages of circular section as far as possible, without sudden changes in cross sections; 3. tightness of walls. It is believed that much useful information can be obtained by building a model of about 1/16 scale, that is, having a closed throat of 2 ft. by 4 ft. The outside dimensions would be about 12 ft. by 25 ft. in plan and the height 4 ft. Two propellers will be required about 28 in. in diameter, each to be driven by direct current motor at a maximum speed of 4500 R.P.M. Provision can be made for altering the length of certain portions, particularly the exit cone, and possibly for the application of boundary layer control in order to effect satisfactory air flow. This model can be constructed in a comparatively short time, using 2 by 4 framing with matched sheathing inside, and where circular sections are desired they can be obtained by nailing sheet metal to wooden ribs, which can be cut on the band saw. It is estimated that three months will be required for the construction and testing of such a model and that the cost will be approximately three thousand dollars, one thousand dollars of which will be for the motors. No suitable location appears to exist in any of our present buildings, and it may be necessary to build it outside and cover it with a roof." George Lewis responded immediately (June 27) granting the authority to proceed. He urged Langley to expedite construction and to employ extra carpenters if necessary. Funds for the model came from the FST project. In a 1979 presentation made by Abe Silverstein, Donald Baals noted that credit for the design of the model was given to Clinton H. Dearborn.

NASA Identifier: L3686

label_outline

Tags

nasa washington model of full scale tunnel fst under construction dvids experimental aircraft naca nasa history collection
date_range

Date

1929
create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Naca, Experimental Aircraft, Nasa History Collection

NACA Boeing model 15, NASA history collection

Clearing rock slide at Switchback Trail.

Workers in Union Station, Washington, D.C., during the restoration in the 1980s

Volunteer build activities [for World Habitat Day: 27th Annual Carter Work Project, with former President Jimmy Carter and former First Lady Rosalynn Carter joined in Washington, D.C. by Secretary Shaun Donovan, Habitat for Humanity International Chief Executive Officer Jonathan Reckford, Habitat for Humanity of Washington, D.C. President Kent Adcock, and more than 200 volunteers, including HUD staff members, working on renovating and building homes in D.C.'s Ivy City neighborhood]

Presidential Management Fellows Job Fair - [Displays, participants, proceedings at] Presidential Management Fellows Job Fair, Washington, D.C. Convention Center, attended by HUD Human Resources staff

Secretary Mel Martinez at Habitat for Humanity Event, Washington, D.C.

Stennis exhibits reach out to public

[Assignment: 48-DPA-06-09-08_SOI_K_Zoo_Tiger] Visit of Secretary Dirk Kempthorne to the National Zoo, Washington, D.C., [for touring, press conference launch of the] Tiger Conservation Initiative. The Secretary [joined numerous dignitaries, among them National Zoo Director John Berry, actor and Conservation International board member Harrison Ford, actor Robert Duvall, World Bank Group President Robert Zoellick, National Zoo Ecology Center Head Conservator John Seidensticker, and International Tiger Coalition spokesperson Grace Ge Gabriel, at the event.] [48-DPA-06-09-08_SOI_K_Zoo_Tiger_DSC_0097.JPG]

Pouring gasoline into combine engine. Walla Walla County, Washington

VIP's Get a Closeup Look at a Space Shuttle Main Engine

[Assignment: 48-DPA-03-16-08_SOI_K_St._Pat_Sec] Secretary Dirk Kempthorne at the annual St. Patrick's Day Parade along Constitution Avenue, Washington, D.C., [where he participated in the U.S. Park Police motorcylce unit procession] [48-DPA-03-16-08_SOI_K_St_Pat_Sec_DOI_1413.JPG]

Team members of Camp Patriot stop to hydrate and fuel

Topics

nasa washington model of full scale tunnel fst under construction dvids experimental aircraft naca nasa history collection