visibility Similar

code Related

Measurement of Vibrations from the 8- by 6-Foot Supersonic Wind Tunnel

description

Summary

Reverend Henry Birkenhauer and E.F. Carome measure ground vibrations on West 220th Street caused by the operation of the 8- by 6-Foot Supersonic Wind Tunnel at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The 8- by 6 was the laboratory’s first large supersonic wind tunnel. It was also the NACA’s most powerful supersonic tunnel, and the NACA’s first facility capable of running an engine at supersonic speeds. The 8- by 6 was originally an open-throat and non-return tunnel. This meant that the supersonic air flow was blown through the test section and out the other end into the atmosphere. Complaints from the local community led to the installation of a muffler at the tunnel exit and the eventual addition of a return leg. Reverend Brikenhauer, a seismologist, and Carome, an electrical technician were brought in from John Carroll University to take vibration measurements during the 8- by 6 tunnel’s first run with a supersonic engine. They found that the majority of the vibrations came from the air and not the ground. The tunnel’s original muffler offered some relief during the facility checkout runs, but it proved inadequate during the operation of an engine in the test section. Tunnel operation was suspended until a new muffler was designed and installed. The NACA researchers, however, were pleased with the tunnel’s operation. They claimed it was the first time a jet engine was operated in an airflow faster than Mach 2.

label_outline

Tags

grc glenn research center measurement vibrations wind tunnel 1950 s men 1950 s 50 s nasa
date_range

Date

21/07/1950
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Measurement, 1950 S Men, 50 S

Alaskan Way Viaduct and Battery Street Tunnel, Seattle, King County, WA

Walking the 72-inch bubble chamber. Paul Hernandez of mechanical engineering conceived the ingenious idea of devising a hydraulic walking method. With this system the bubble-chamber magnet could make right angle turns and maneuver into very tight spaces, thus eliminating the need for an outside rigging contractor. Photograph taken May 7, 1958. Bubble Chamber-500

Holland Tunnel, Beneath Hudson River between New York & Jersey City, New York, New York County, NY

144-202.LK--Nay Aug Tunnel--Clearances--Scranton, PA

Salinas River Project, Cuesta Tunnel, Southeast of U.S. 101, San Luis Obispo, San Luis Obispo County, CA

Chesapeake and Potomac Telephone Company. Cable tunnel in C&P building on N. Irving St., Arlington, Virginia

SBB Historic - F 103 00011 075 Brunnen-Sisikon

Southeast Area Survey, 101 & 122-124 Carroll Street (House), 1008 Potomac Street (House), Canal Street at Independence Avenue (Row House), 1016-1018 Potomac Street (House), Washington, District of Columbia, DC

Civilian protection. Members of the rescue parties like this worker must be prepared to reach victims of bomb raids and fallen debris and give them emergency first aid treatment. It is not always possible to remove debris by hand, therefore, rescue workers' trucks carry equipment to enable the rescue squad to shore up masonry, cut through steel or stone, shut off broken mains or tunnel through conglomerate heaps of debris. The worker here shown is using an acetylene torch to cut away a stubborn resisting piece of expanded steel

Wallkill pressure tunnel. Side-wall and arch forms in place ready for concrete, with inclined track to platform on level with top of side-wall. Contract 47. April 11, 1911.

Foto från Årstadal?, Tekniska museet, Sweden

left to right: Chien-shiung Wu (1912-1997) and Dr. Brode

Topics

grc glenn research center measurement vibrations wind tunnel 1950 s men 1950 s 50 s nasa