visibility Similar

Establishing view, looking north, of NASA DFRC Mate-Demate Device (MDD) and Shuttle Hangar (Building 4833) in foreground, right.

CAPE CANAVERAL, Fla. – Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Steve Belflower, vice president of HuntonBrady Architects of Orlando, speaks to members of the media and guests during the groundbreaking ceremony. Behind him is Nancy Bray, director of Kennedy's Center Operations Directorate. To his right is Kennedy Center Director Bob Cabana. To his left is Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees. Photo credit: NASA/Kim Shiflett KSC-2014-4211

KSC Headquarters Building Groundbreaking Ceremony

KENNEDY SPACE CENTER, FLA. - Viewed across the turn basin in the Launch Complex 39 Area at KSC, the barge containing an External Tank (ET) waits to be towed to Port Canaveral. There one of the SRB Retrieval Ships will take over and tow the ET to the Michoud Space Systems Assembly Facility near New Orleans where redesign of the external tank is underway for Return to Flight. KSC-04pd1274

STS052-102-007 - STS-052 - Images showing the payload bay of OV-102 during STS-52

KENNEDY SPACE CENTER, FLA. -- The dark water of the turn basin at NASA's Kennedy Space Center mirrors the night lights and the Vehicle Assembly Building and Launch Control Center, silhouetted against the post-sunset sky. Photo credit: NASA/Kim Shiflett KSC-08pd0336

KSC WEATHER - STORMS AT LC39 2010-3683

CAPE CANAVERAL, Fla. – The Vehicle Assembly Building towers over two tugboats sitting alongside the Pegasus Barge which is moored in a secure area of the Turn Basin in the Launch Complex 39 area at NASA's Kennedy Space Center in Florida. The 266-foot-long and 50-foot-wide barge will be towed to Stennis by NASA's Freedom Star ship. Since being delivered to NASA in 1999, Pegasus sailed 41 times and transported 31 shuttle external fuel tanks from Michoud Assembly Facility near New Orleans to Kennedy. The barge will leave Kennedy, perhaps for the final time. Both the barge and shuttle equipment will remain in storage until their specific future uses are determined. The SSMEs themselves will be transported to Stennis separately for use with the agency’s new heavy-lift rocket, the Space Launch System. The work is part of the Space Shuttle Program’s transition and retirement processing. For more information about Shuttle Transition and Retirement, visit http://www.nasa.gov/mission_pages/transition/home/index.html. Photo credit: NASA/Cory Huston KSC-2011-7703

Lunar Landing Research Vehicle (LLRV) in flight

code Related

Lunar Landing Research Vehicle (LLRV) in flight

description

Summary

In this 1965 NASA Flight Reserch Center photograph the Lunar Landing Research Vehicle (LLRV) is shown at near maximum altitude over the south base at Edwards Air Force Base. When Apollo planning was underway in 1960, NASA was looking for a simulator to profile the descent to the moon's surface. Three concepts surfaced: an electronic simulator, a tethered device, and the ambitious Dryden contribution, a free-flying vehicle. All three became serious projects, but eventually the NASA Flight Research Center's (FRC) Landing Research Vehicle (LLRV) became the most significant one. Hubert M. Drake is credited with originating the idea, while Donald Bellman and Gene Matranga were senior engineers on the project, with Bellman, the project manager. Simultaneously, and independently, Bell Aerosystems Company, Buffalo, N.Y., a company with experience in vertical takeoff and landing (VTOL) aircraft, had conceived a similar free-flying simulator and proposed their concept to NASA headquarters. NASA Headquarters put FRC and Bell together to collaborate. The challenge was; to allow a pilot to make a vertical landing on earth in a simulated moon environment, one sixth of the earth's gravity and with totally transparent aerodynamic forces in a "free flight" vehicle with no tether forces acting on it. Built of tubular aluminum like a giant four-legged bedstead, the vehicle was to simulate a lunar landing profile from around 1500 feet to the moon's surface. To do this, the LLRV had a General Electric CF-700-2V turbofan engine mounted vertically in gimbals, with 4200 pounds of thrust. The engine, using JP-4 fuel, got the vehicle up to the test altitude and was then throttled back to support five-sixths of the vehicle's weight, simulating the reduced gravity of the moon. Two hydrogen-peroxide lift rockets with thrust that could be varied from 100 to 500 pounds handled the LLRV's rate of descent and horizontal translations. Sixteen smaller hydrogen-peroxide rockets, mounted in pairs, gave the pilot control in pitch, yaw, and roll. On the LLRV, in case of jet engine failure, six-500-pounds-of thrust rockets could be used by the pilot to carefully apply lift thrust during the rapid descent to hopefully achieve a controllable landing. The pilot's platform extended forward between two legs while an electronics platform, similarly located, extended rearward. The pilot had a zero-zero ejection seat that would then lift him away to safety. Weight and balance design constraints were among the most challenging to meet for all phases of the program (design, development, operations). The two LLRVs were shipped disassembled from Bell to the FRC in April 1964, with program emphasis placed on vehicle No. 1. The scene then shifted to the old South Base area of Edwards Air Force Base. On the day of the first flight, Oct. 30, 1964, NASA research pilot Joe Walker flew it three times for a total of just under 60 seconds, to a peak altitude of approximately 10 feet. By mid-1966 the NASA Flight Research Center had accumulated enough data from the LLRV flight program to give Bell a contract to deliver three Lunar Landing Training Vehicles (LLTVs) at a cost of $2.5 million each. As 1966 ended, the LLRV #1 had flown 198 flights, and the LLRV #2 was being assembled, instrumented and cockpit modifications made at the South Base. The first flight of the number two LLRV in early January 1967 was quickly followed by five more. In December 1966 vehicle No. 1 was shipped to Houston, followed by No. 2 in mid January 1967. When Dryden's LLRVs arrived at Houston they joined the first of the LLTVs to eventually make up the five-vehicle training and simulator fleet. All five vehicles were relied on for simulation and training of moon landings.

NASA Identifier: NIX-ECN-688

label_outline

Tags

nasa lunar landing research vehicle llrv in flight dvids experimental aircraft edwards air force base nasa history collection
date_range

Date

1967
place

Location

create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Nasa History Collection, Experimental Aircraft, Edwards Air Force Base

Topics

nasa lunar landing research vehicle llrv in flight dvids experimental aircraft edwards air force base nasa history collection