visibility Similar

code Related

Lower level auxiliary machinery room No. 2 aboard the Oliver Hazard Perry class guided missile frigate the USS AUDREY FITCH (FFG 34) at 40 percent completion

description

Summary

The original finding aid described this photograph as:

Base: Bath

State: Maine (ME)

Country: United States Of America (USA)

Scene Camera Operator: Bath Iron Works

Release Status: Released to Public

Combined Military Service Digital Photographic Files

Nothing Found.

label_outline

Tags

level machinery room machinery room oliver hazard perry class oliver hazard perry class frigate missile frigate uss audrey fitch uss audrey fitch ffg completion maine guided missile frigate high resolution bath iron works percent completion bath us navy ships us navy ship building us national archives
date_range

Date

01/07/1981
place

Location

create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Uss Audrey Fitch, Audrey, Missile Frigate

The air conditioning machinery room aboard the guided missile frigate NICHOLAS (FFG-47)

Audrey Nell Hamilton and JoeAnn Anderson Ulmer oral history interview conducted by Joseph Mosnier in Saint Augustine, Florida, 2011-09-13.

A view of auxiliary machinery room No. 2 aboard the guided missile frigate THACH (FFG 43). The ship, under construction at Todd Pacific Shipyards, is 90 percent complete

The upper level auxiliary machinery room No. 2 room aboard the guided missile frigate KLAKRING (FFG-42) under construction

An interior view of the helicopter hauldown and traverse machinery room on the guided missile frigate USS CARR (FFG 52) at 20 percent completion

The combat information center and identification friend or foe radar equipment room aboard the Oliver Hazard Perry class guided missile frigate USS JACK WILLIAMS (FFG 24) at 70 percent completion

Auxiliary machinery room No. 3 aboard the Oliver Hazard Perry class guided missile frigate USS STEPHEN W. GROVES (FFG 29) at 40 percent completion

Abercrombie & Fitch, business in Ponciana Plaza, Palm Beach. Interior III

An interior view of auxiliary machine room No. 3 on the guided missile frigate DUNCAN (FFG 10) at 90 percent completion

At sea aboard USS Reuben James (FFG 57) Oct. 22, 2002 -- Damage Controlman 1st Class David Hernandez studies his Enlisted Surface Warfare Specialist (ESWS) books in his rack aboard the guided missile frigate.

The combat information center aboard the Oliver Hazard Perry class guided missile frigate USS AUBREY FITCH (FFG 34) at 90 percent completion

The lower level engine room aboard the Oliver Hazard Perry class guided missile frigate USS JOHN L. HALL (FFG 32) at 90 percent completion

Topics

level machinery room machinery room oliver hazard perry class oliver hazard perry class frigate missile frigate uss audrey fitch uss audrey fitch ffg completion maine guided missile frigate high resolution bath iron works percent completion bath us navy ships us navy ship building us national archives