visibility Similar

MS Usachev on flight deck. NASA public domain image colelction.

KENNEDY SPACE CENTER, FLA. -- STS-123 Mission Specialist Robert L. Behnken is shown in the pilot's seat of a T-38 training aircraft at NASA Kennedy Space Center's Shuttle Landing Facility. The crew for space shuttle Endeavour's STS-123 mission is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. Endeavour's seven astronauts arrived at Kennedy's Shuttle Landing Facility in their T-38 training aircraft between 10:45 and 10:58 a.m. EST. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett KSC-08pd0447

STS075-355-034 - STS-075 - STS-75 crew preparing for landing

STS-109 Crew members take off from Ellington Field in T-38s

STS-105 crew departs Ellington Field in T-38's

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the STS-120 crew exits the crew transport vehicle after a successful landing aboard space shuttle Discovery. Leading the way is Commander Pamela Melroy, followed by Pilot George Zamka and mission specialist Scott Parazynski. Discovery completed the 15-day mission STS-120, with an on-time landing at 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. Mission STS-120 continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA//Kim Shiflett KSC-07pd3174

CAPE CANAVERAL, Fla. - After taking part in a simulated launch countdown aboard space shuttle Atlantis, the STS-125 crew members practice an emergency escape from the shuttle. Here Mission Specialist John Grunsfeld has reached the slidewire basket area on the fixed service structure at Launch Pad 39A at NASA's Kennedy Space Center in Florida. The countdown is the culmination of terminal countdown demonstration test, or TCDT, activities as preparation before launch. TCDT provides astronauts and ground crews with an opportunity to participate in various launch activities, including equipment familiarization, emergency training and the countdown. Atlantis’ STS-125 mission to service NASA’s Hubble Space Telescope is targeted for launch Oct. 14. Photo credit: NASA/Kim Shiflett KSC-08pd2905

KENNEDY SPACE CENTER, FLA. -- STS-92 Pilot Pam Melroy arrives at KSC’s Shuttle Landing Facility to take part in a Crew Equipment Interface Test. She and other crew members Commander Brian Duffy and Mission Specialists Koichi Wakata, Leroy Chiao, Jeff Wisoff, Michael Lopez-Alegria and Bill McArthur will spend time at SPACEHAB becoming familiar with the payload and equipment they will use on their mission to the International Space Station. Wakata is with the Japanese space agency. The mission payload includes the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power; Ku-band communication to support early science capability and U.S. television; and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A KSC00pp0901

KENNEDY SPACE CENTER, FLA. -- STS-92 Pilot Pam Melroy arrives at KSC’s Shuttle Landing Facility to take part in a Crew Equipment Interface Test. She and other crew members Commander Brian Duffy and Mission Specialists Koichi Wakata, Leroy Chiao, Jeff Wisoff, Michael Lopez-Alegria and Bill McArthur will spend time at SPACEHAB becoming familiar with the payload and equipment they will use on their mission to the International Space Station. Wakata is with the Japanese space agency. The mission payload includes the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power; Ku-band communication to support early science capability and U.S. television; and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A KSC-00pp0901

code Related

STS-100 Pilot Jeffrey S. Ashby returns to KSC to complete Terminal Countdown Demonstration Test activities that were postponed earlier. The TCDT includes emergency escape training, payload bay walkdown, and a simulated launch countdown. The primary payload comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A KSC01pp0764

STS-100 Commander Kent V. Rominger is ready to take the wheel on the M-113 armored carrier that could be used by the crew in the event of an emergency at the pad during which the crew must make a quick exit from the area. Driving the tracked vehicle is part of Terminal Countdown Demonstration Test activities, which include emergency escape training, payload walkdown and a simulated launch countdown. The primary payload on mission STS-100 comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A KSC-01pp0777

Members of the STS-100 crew look over the mission payload recently installed in the Space Shuttle Endeavour’s payload bay. The crew is at KSC to complete Terminal Countdown Demonstration Test activities that were postponed earlier. The TCDT includes emergency escape training, payload bay walkdown, and a simulated launch countdown. The primary payload comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A KSC01pp0769

STS-100 Commander Kent V. Rominger arrives at the KSC Shuttle Landing Facility aboard a T-38 jet aircraft to get ready for launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19 KSC01pp0786

The crew on mission STS-100 poses in the White Room during Terminal Countdown Demonstration Test activities. Standing, from left, are Mission Specialists Scott E. Parazynski, Yuri Lonchakov, and Umberto Guidoni; Pilot Jeffrey S. Ashby; Commander Kent V. Rominger; Mission Specialist Chris A. Hadfield; and Mission Specialist John L. Phillips. The TCDT includes emergency escape training, payload bay walkdown, and a simulated launch countdown. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A KSC-01padig185

The crew on mission STS-100 poses in the White Room during Terminal Countdown Demonstration Test activities. Standing, from left, are Mission Specialists Scott E. Parazynski, Yuri Lonchakov, and Umberto Guidoni; Pilot Jeffrey S. Ashby; Commander Kent V. Rominger; and Mission Specialists Chris A. Hadfield and John L. Phillips. The TCDT includes emergency escape training, payload bay walkdown, and a simulated launch countdown. The primary payload comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A KSC-01pp0770

STS-90 Commander Richard Searfoss addresses the media at KSC's Launch Pad 39B, where the crew are participating in Terminal Countdown Demonstration Test (TCDT) activities. The TCDT is held at KSC prior to each Space Shuttle flight to provide crews with the opportunity to participate in simulated countdown activities. Columbia is targeted for launch of STS-90 on April 16 at 2:19 p.m. EDT and will be the second mission of 1998. The mission is scheduled to last nearly 17 days KSC-98pc434

STS-100 Mission Specialist Umberto Guidoni arrives at KSC for Terminal Countdown Demonstration Test activities. He and the rest of the crew Commander Kent V. Rominger, Pilot Jeffrey S. Ashby and Mission Specialists Chris Hadfield, Scott E. Parazynski, John L. Phillips, and Yuri Lonchakov are going to be taking part in emergency escape training at the pad, equipment familiarization and a simulated launch countdown. An international crew, Hadfield is with the Canadian Space Agency, Guidoni the European Space Agency and Lonchakov the Russian Aviation and Space Agency. The mission is carrying the Multi-Purpose Logistics Module Raffaello and the Canadian robotic arm, SSRMS, to the International Space Station. Raffaello carries six system racks and two storage racks for the U.S. Lab. The SSRMS is crucial to the continued assembly of the orbiting complex and has a unique ability to switch ends as it works, “inchworming” along the Station’s exterior. Launch of mission STS-100 is scheduled for April 19 at 2:41 p.m. EDT from Launch Pad 39A KSC01pp0590

The STS-100 crew poses for a photo after their arrival at KSC to complete Terminal Countdown Demonstration Test activities that were postponed earlier. Standing, from left, are Commander Kent V. Rominger; Mission Specialists Umberto Guidoni, John L. Phillips, Chris A. Hadfield and Yuri V. Lonchakov; Pilot Jeffrey S. Ashby; and Mission Specialist Scott E. Parazynski. An international crew, Guidoni is with the European Space Agency, Hadfield the Canadian Space Agency, and Lonchakov the Russian Space and Aviation Agency. The TCDT includes emergency escape training, payload bay walkdown, and a simulated launch countdown. The primary payload comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A KSC01pp0765

STS-100 Commander Kent V. Rominger returns to KSC to complete Terminal Countdown Demonstration Test activities that were postponed earlier. The TCDT includes emergency escape training, payload bay walkdown, and a simulated launch countdown. The primary payload comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A KSC01pp0763

description

Summary

STS-100 Commander Kent V. Rominger returns to KSC to complete Terminal Countdown Demonstration Test activities that were postponed earlier. The TCDT includes emergency escape training, payload bay walkdown, and a simulated launch countdown. The primary payload comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center sts commander kent commander kent v rominger returns rominger returns terminal countdown activities terminal countdown demonstration test activities tcdt emergency payload bay walkdown payload bay walkdown canadian arm ssrms multi purpose logistics module multi purpose logistics module raffaello endeavour space shuttle endeavour mission sts launch pad space shuttle astronauts nasa
date_range

Date

08/04/2001
collections

in collections

Space Shuttle Program

place

Location

Kennedy Space Center / Cape Canaveral Air Force Station Fire Station 2 ,  28.52650, -80.67093
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Payload Bay Walkdown, Commander Kent V, Walkdown

S135E009256 - STS-135 - Interior View of Node 2 and Raffaello

STS085-339-002 - STS-085 - SSCE, Rominger works with middeck experiment

STS080-327-027 - STS-080 - Pilot Kent Rominger floats in the forward flight deck

KENNEDY SPACE CENTER, FLA. -- The STS-122 crew poses for a group portrait near Launch Pad 39B during a training session on the operation of the M-113 armored personnel carrier. An M-113 will be available to transport the crew to safety in the event of an emergency on the pad before their launch. From left are Mission Specialists Rex Walheim, Leopold Eyharts and Hans Schlegel of the European Space Agency, Stanley Love; Commander Steve Frick; Pilot Alan Poindexter; and Mission Specialist Leland Melvin. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3334

S124E008125 - STS-124 - SSRMS - Public domain NASA photogrpaph

S124E006062 - STS-124 - Nyberg and Hoside at SSRMS controls

STS080-345-005 - STS-080 - VIEW-CPL, Jernigan and Rominger work with middeck experiment

STS096-360-029 - STS-096 - CDR Rominger surrounded by stowage bags on middeck

STS096-367-017 - STS-096 - CDR Rominger in intradeck hatch

CAPE CANAVERAL, Fla. -- STS-135 Pilot Doug Hurley stands on the walkway to the White Room which provides entry to space shuttle Atlantis' crew compartment on Launch Pad 39A at NASA's Kennedy Space Center in Florida. Atlantis' crew members are at the pad to participate in a launch countdown simulation exercise. As part of the Terminal Countdown Demonstration Test (TCDT), the crew members are strapped into their seats on Atlantis to practice the steps that will be taken on launch day. Shuttle Atlantis and its crew are targeted to lift off July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Jim Grossmann KSC-2011-4817

STS073-315-003 - STS-073 - Pilot Kent Rominger photographed in Spacelab from inside tunnel

STS073-335-030 - STS-073 - Commander Ken Bowersox and Pilot Kent Rominger prepare for deorbit ops

Topics

kennedy space center sts commander kent commander kent v rominger returns rominger returns terminal countdown activities terminal countdown demonstration test activities tcdt emergency payload bay walkdown payload bay walkdown canadian arm ssrms multi purpose logistics module multi purpose logistics module raffaello endeavour space shuttle endeavour mission sts launch pad space shuttle astronauts nasa