visibility Similar

code Related

KENNEDY SPACE CENTER, Fla. -- With the drag chute slowing its speed, Atlantis prepares to land on Runway 15 at the Shuttle Landing Facility to complete a 12-day, 18-hour, 34-minute-long STS-104 mission. Main gear touchdown occurred at 11:38:55 p.m. EDT. At the controls is Commander Steven W. Lindsey. Other crew members on board are Pilot Charles Hobaugh and Mission Specialists Michael Gernhardt, Janet Lynn Kavandi and James F. Reilly. This is the 18th nighttime landing for a Space Shuttle, the 13th at Kennedy Space Center. The mission delivered the Joint Airlock Module to the International Space Station, completing the second phase of the assembly of the Space Station KSC01padig252

KENNEDY SPACE CENTER, Fla. -- Silhouetted against the bright lights at the Shuttle Landing Facility, Atlantis prepares to land on Runway 15 at the Shuttle Landing Facility to complete a 12-day, 18-hour, 34-minute-long STS-104 mission. Main gear touchdown occurred at 11:38:55 p.m. EDT. At the controls is Commander Steven W. Lindsey. Other crew members on board are Pilot Charles Hobaugh and Mission Specialists Michael Gernhardt, Janet Lynn Kavandi and James F. Reilly. This is the 18th nighttime landing for a Space Shuttle, the 13th at Kennedy Space Center. The mission delivered the Joint Airlock Module to the International Space Station, completing the second phase of the assembly of the Space Station KSC-01pp1381

KENNEDY SPACE CENTER, Fla. -- Atlantis touches down on Runway 15 at the Shuttle Landing Facility to complete a 12-day, 18-hour, 34-minute-long STS-104 mission. Main gear touchdown occurred at 11:38:55 p.m. EDT. At the controls is Commander Steven W. Lindsey. Other crew members on board are Pilot Charles Hobaugh and Mission Specialists Michael Gernhardt, Janet Lynn Kavandi and James F. Reilly. This is the 18th nighttime landing for a Space Shuttle, the 13th at Kennedy Space Center. The mission delivered the Joint Airlock Module to the International Space Station, completing the second phase of the assembly of the Space Station KSC-01pp1382

KENNEDY SPACE CENTER, Fla. -- The lights on Runway 15 at KSC’s Shuttle Landing Facility spotlight Atlantis as it touches down, completing a 12-day, 18-hour, 34-minute-long STS-104 mission. Main gear touchdown occurred at 11:38:55 p.m. EDT. At the controls is Commander Steven W. Lindsey. Other crew members on board are Pilot Charles Hobaugh and Mission Specialists Michael Gernhardt, Janet Lynn Kavandi and James F. Reilly. This is the 18th nighttime landing for a Space Shuttle, the 13th at Kennedy Space Center. The mission delivered the Joint Airlock Module to the International Space Station, which was subsequently attached to the Unity Node, completing the second phase of the assembly of the Space Station KSC-01pp1380

KENNEDY SPACE CENTER, Fla. -- Atlantis prepares to land on Runway 15 at the Shuttle Landing Facility to complete a 12-day, 18-hour, 34-minute-long STS-104 mission. Main gear touchdown occurred at 11:38:55 p.m. EDT. At the controls is Commander Steven W. Lindsey. Other crew members on board are Pilot Charles Hobaugh and Mission Specialists Michael Gernhardt, Janet Lynn Kavandi and James F. Reilly. This is the 18th nighttime landing for a Space Shuttle, the 13th at Kennedy Space Center. The mission delivered the Joint Airlock Module to the International Space Station, completing the second phase of the assembly of the Space Station KSC-01pp1373

KENNEDY SPACE CENTER, Fla. -- Air waves stream behind Atlantis as it touches down on Runway 15 at the KSC Shuttle Landing Facility. Main gear touchdown occurred at 11:38:55 p.m. EDT, completing complete a 12-day, 18-hour, 34-minute-long STS-104 mission. At the controls is Commander Steven W. Lindsey. Other crew members on board are Pilot Charles Hobaugh and Mission Specialists Michael Gernhardt, Janet Lynn Kavandi and James F. Reilly. This is the 18th nighttime landing for a Space Shuttle, the 13th at Kennedy Space Center. The mission delivered the Joint Airlock Module to the International Space Station, completing the second phase of the assembly of the Space Station KSC-01pp1384

KENNEDY SPACE CENTER, Fla. -- The STS-104 crew wave at onlookers who welcomed them home from their almost 13-day mission to the International Space Station. From left are Mission Specialists James Reilly and Janet Lynn Kavandi, Commander Steven Lindsey, Pilot Charles Hobaugh and Mission Specialist Michael Gernhardt. Atlantis touched down at 11:38:55 p.m. EDT July 24, 2001. The mission delivered the Joint Airlock Module to the Space Station, completing the second phase of the assembly of the Space Station. This is the 18th nighttime landing for a Space Shuttle, the 13th at Kennedy Space Center KSC-01pp1376

KENNEDY SPACE CENTER, Fla. -- After arriving at the Shuttle Landing Facility, the STS-104 crew stopped to talk to the media. At the microphone is Commander Steven W. Lindsey; at right is Pilot Charles O. Hobaugh. The crew is at KSC to make final preparations for their launch. Other crew members are Mission Specialists James F. Reilly, Janet Lynn Kavandi and Michael L. Gernhardt. The launch of Atlantis on mission STS-104 is scheduled for July 12 from Launch Pad 39B. The mission is the 10th assembly flight to the International Space Station and carries the Joint Airlock Module, which will become the primary path for spacewalk entry and departure using both U.S. spacesuits and the Russian Orlan spacesuit for EVA activity KSC-01pp1259

KENNEDY SPACE CENTER, Fla. -- The STS-104 crew poses for a photo in the slidewire basket grounds near Launch Pad 39B and Space Shuttle Atlantis (behind them). Standing left to right are Mission Specialist Michael L. Gernhardt, Commander Steven W. Lindsey, Mission Specialists James F. Reilly and Janet Lynn Kavandi, and Pilot Charles O. Hobaugh. The crew is taking part in Terminal Countdown Demonstration Test activities, which include emergency exit training, opportunities to inspect their mission payloads in the orbiter’s payload bay and simulated countdown exercises. The launch of Atlantis on mission STS-104 is scheduled July 12 from Launch Pad 39B. The mission is the 10th flight to the International Space Station and carries the Joint Airlock Module KSC-01pp1211

KENNEDY SPACE CENTER, Fla. -- With the drag chute reflected in the bright lights at the Shuttle Landing Facility, Atlantis prepares to land on Runway 15 at the Shuttle Landing Facility to complete a 12-day, 18-hour, 34-minute-long STS-104 mission. Main gear touchdown occurred at 11:38:55 p.m. EDT. At the controls is Commander Steven W. Lindsey. Other crew members on board are Pilot Charles Hobaugh and Mission Specialists Michael Gernhardt, Janet Lynn Kavandi and James F. Reilly. This is the 18th nighttime landing for a Space Shuttle, the 13th at Kennedy Space Center. The mission delivered the Joint Airlock Module to the International Space Station, completing the second phase of the assembly of the Space Station KSC01padig251

description

Summary

KENNEDY SPACE CENTER, Fla. -- With the drag chute reflected in the bright lights at the Shuttle Landing Facility, Atlantis prepares to land on Runway 15 at the Shuttle Landing Facility to complete a 12-day, 18-hour, 34-minute-long STS-104 mission. Main gear touchdown occurred at 11:38:55 p.m. EDT. At the controls is Commander Steven W. Lindsey. Other crew members on board are Pilot Charles Hobaugh and Mission Specialists Michael Gernhardt, Janet Lynn Kavandi and James F. Reilly. This is the 18th nighttime landing for a Space Shuttle, the 13th at Kennedy Space Center. The mission delivered the Joint Airlock Module to the International Space Station, completing the second phase of the assembly of the Space Station

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

kennedy space center drag chute lights atlantis land runway sts main gear touchdown main gear touchdown controls commander steven commander steven w lindsey other other crew members board pilot charles hobaugh pilot charles hobaugh specialists michael gernhardt mission specialists michael gernhardt janet lynn kavandi janet lynn kavandi james james f space shuttle joint airlock module joint airlock module international space station phase second phase space station ksc padig crew members high resolution nasa
date_range

Date

24/07/2001
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Pilot Charles Hobaugh, Mission Specialists Michael Gernhardt, Commander Steven W

Topics

kennedy space center drag chute lights atlantis land runway sts main gear touchdown main gear touchdown controls commander steven commander steven w lindsey other other crew members board pilot charles hobaugh pilot charles hobaugh specialists michael gernhardt mission specialists michael gernhardt janet lynn kavandi janet lynn kavandi james james f space shuttle joint airlock module joint airlock module international space station phase second phase space station ksc padig crew members high resolution nasa