visibility Similar

Space Shuttle Endeavour STS-134

KENNEDY SPACE CENTER, FLA. -- Rollback of the Rotating Service Structure on Launch Pad 39B reveals the Space Shuttle Discovery, scheduled to launch on mission STS-96 at 6:49 a.m. EDT on May 27. Above the top of the external tank is a vent hood, known as the "beanie cap," at the end of the external tank gaseous oxygen vent arm. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies to be stored aboard the station, for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. The mission will include a space walk to attach the cranes to the outside of the ISS for use in future construction. Space Shuttle Discovery is due to launch on May 27 at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT KSC-99pp0579

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building (VAB), the orbiter Atlantis is slowly lowered alongside the external tank and solid rocket boosters below. Also visible are the three main engine nozzles, each measuring 7.8 feet across and 9.4 feet high. The 122-foot-long orbiter is easily accommodated inside the 525-foot-tall, 518-foot-wide VAB. After being mated with the tank and solid rocket boosters stack, Atlantis will be transported to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000 KSC00pp0364

KENNEDY SPACE CENTER, FLA. - The orbiter access arm is positioned against Space Shuttle Endeavour after rollback of the rotating service structure, or RSS, on Launch Pad 39A. At the end of the arm is a clean room from which the astronauts enter the crew compartment of the orbiter for launch. Rollback started at 9 p.m. EDT Aug. 7 and was complete at 10:40 p.m. The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. Rollback of the pad's RSS is one of the milestones in preparation for the launch of mission STS-118 at 6:36 p.m. EDT on Aug. 8. Space Shuttle Endeavour's STS-118 mission is the 22nd shuttle flight to the International Space Station. It will continue space station construction by delivering a third starboard truss segment, S5, and other payloads such as the SPACEHAB module and the external stowage platform 3. Photo credit: NASA/Kim Shiflett KSC-07pd2228

Space Shuttle Endeavour STS-134 (201104290010HQ)

CAPE CANAVERAL, Fla. – Space shuttle Atlantis approaches the top of Launch Pad 39A after rolling from the Vehicle Assembly Building at NASA's Kennedy Space Center. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. First motion occurred at 9:19 a.m. EDT. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2541

CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, members of the news media photograph the space shuttle Endeavour, mounted atop NASA's Shuttle Carrier Aircraft, or SCA, as it is prepared for roll back from the mate-demate device. The SCA, a modified 747 jetliner, will fly Endeavour to Los Angeles where it will be placed on public display at the California Science Center. This is the final ferry flight scheduled in the Space Shuttle Program era. For more information on the shuttles' transition and retirement, visit http://www.nasa.gov/transition. Photo credit: NASA/ Tim Jacobs KSC-2012-5290

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour waits on Launch Pad 39B for launch on mission STS-97. Behind it are the orange external tank flanked by two solid rocket boosters. On either side of Endeavour’s tail are the tail service masts, which support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft T-0 umbilicals. The masts also protect the ground half of those umbilicals from the harsh launch environment. At launch, the masts rotate backward, triggering a compressed-gas thruster and causing a protective hood to move into place and completely seal the structure from the main engine exhaust. At the end of the orbiter access arm, near the nose of Endeavour, is the White Room, an environmental chamber that provides both entrance to the orbiter and emergency egress, if needed. The arm remains extended until 7 minutes, 24 seconds before launch. The arm extends from the Fixed Service Structure. In the center of Endeavour are the payload bay doors. Endeavour is scheduled to launch Nov. 30 at 10:06 p.m. EST KSC-00pp1731

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Space Center, the orbiter access arm, which extends from the Fixed Service Structure, is positioned against space shuttle Atlantis following the rollback of the rotating service structure, or RSS. Movement of the RSS began at 7:27 p.m. EST. The RSS provides protected access to the orbiter for crew entry and servicing of payloads at the pad. Rollback of the pad's RSS is one of the milestones in preparation for the launch of mission STS-122, scheduled for 2:45 p.m. EST on Feb. 7. This will be the third launch attempt for Atlantis since December 2007 to carry the Columbus Laboratory to the International Space Station. Beneath the shuttle is the mobile launcher platform which supports the shuttle until liftoff. Photo credit: NASA/Kim Shiflett KSC-08pd0181

code Related

The orbiter Discovery finally hangs vertically, suspended from overhead cranes in the transfer aisle of the Vehicle Assembly Building. It will next be lifted into high bay 1 for mating with its solid rocket boosters and external tank. Discovery will be launched March 8 on mission STS-102, the eighth construction flight to the International Space Station. The Shuttle will carry the Multi-Purpose Logistics Module Leonardo, the first of three pressurized modules provided by the Italian Space Agency to carry supplies and equipment to the Space Station and back to Earth KSC01pp0231

The orbiter Discovery (seen from the front) is lifted to vertical in the transfer aisle of the Vehicle Assembly Building. It will then be lifted up and into high bay 1 for mating with its solid rocket boosters and external tank. Discovery will be launched March 8 on mission STS-102, the eighth construction flight to the International Space Station. The Shuttle will carry the Multi-Purpose Logistics Module Leonardo, the first of three pressurized modules provided by the Italian Space Agency to carry supplies and equipment to the Space Station and back to earth KSC01padig035

The orbiter Discovery is lifted by cranes in the transfer aisle of the Vehicle Assembly Building. It will next be lifted into a vertical position and into high bay 1 for mating with its solid rocket boosters and external tank. Discovery will be launched March 8 on mission STS-102, the eighth construction flight to the International Space Station. The Shuttle will carry the Multi-Purpose Logistics Module Leonardo, the first of three pressurized modules provided by the Italian Space Agency to carry supplies and equipment to the Space Station and back to Earth KSC01pp0229

The orbiter Discovery is nearly vertical as overhead cranes lift it in the transfer aisle of the Vehicle Assembly Building. It will then be moved into high bay 1 for mating with its solid rocket boosters and external tank. Discovery will be launched March 8 on mission STS-102, the eighth construction flight to the International Space Station. The Shuttle will carry the Multi-Purpose Logistics Module Leonardo, the first of three pressurized modules provided by the Italian Space Agency to carry supplies and equipment to the Space Station and back to earth KSC01padig038

The underside of orbiter Discovery is seen as it is lifted to vertical in the transfer aisle of the Vehicle Assembly Building. It will then be lifted up and into high bay 1 for mating with its solid rocket boosters and external tank. Discovery will be launched March 8 on mission STS-102, the eighth construction flight to the International Space Station. The Shuttle will carry the Multi-Purpose Logistics Module Leonardo, the first of three pressurized modules provided by the Italian Space Agency to carry supplies and equipment to the Space Station and back to earth KSC01padig036

In the transfer aisle of the Vehicle Assembly Building the orbiter Discovery is suspended at an angle as it is lifted to a vertical position. It will next be lifted into high bay 1 for mating with its solid rocket boosters and external tank. Discovery will be launched March 8 on mission STS-102, the eighth construction flight to the International Space Station. The Shuttle will carry the Multi-Purpose Logistics Module Leonardo, the first of three pressurized modules provided by the Italian Space Agency to carry supplies and equipment to the Space Station and back to Earth KSC01pp0230

In the transfer aisle of the Vehicle Assembly Building, the orbiter Discovery (seen from the back) is lifted to vertical. It will then be lifted up and into high bay 1 for mating with its solid rocket boosters and external tank. Discovery will be launched March 8 on mission STS-102, the eighth construction flight to the International Space Station. The Shuttle will carry the Multi-Purpose Logistics Module Leonardo, the first of three pressurized modules provided by the Italian Space Agency to carry supplies and equipment to the Space Station and back to earth KSC01padig034

KENNEDY SPACE CENTER, Fla. -- Orbiter Discovery rolls into the Vehicle Assembly Building after leaving the Orbiter Processing Facility bay 2. In the VAB Discovery will be mated with its external tank and solid rocket boosters for its launch on mission STS-105. The payload on this 11th mission to the International Space Station includes the Multi-Purpose Logistics Module Leonardo, which was built by the Italian Space Agency. Leonardo will be outfitted with 12 racks of experiments and equipment. Launch of Discovery is scheduled for no earlier than Aug. 5, 2001 KSC-01pp1098

Before entering Space Shuttle Discovery, STS-102 Pilot James Kelly gets help with his launch and entry suit from technicians in the White Room. The mission is Kelly’s first Shuttle flight. Discovery is carrying the Multi-Purpose Logistics Module Leonardo on the eighth construction flight to the International Space Station. The primary delivery system used to resupply and return Station cargo requiring a pressurized environment, Leonardo will deliver up to 10 tons of laboratory racks filled with equipment, experiments and supplies for outfitting the newly installed U.S. Laboratory Destiny. Discovery is set to launch March 8 at 6:42 a.m. EST. The 12-day mission is expected to end with a landing at KSC on March 20 KSC01pp0450

The orbiter Discovery is finally vertical and hangs suspended in the transfer aisle of the Vehicle Assembly Building. It will next be moved into high bay 1 for mating with its solid rocket boosters and external tank. Discovery will be launched March 8 on mission STS-102, the eighth construction flight to the International Space Station. The Shuttle will carry the Multi-Purpose Logistics Module Leonardo, the first of three pressurized modules provided by the Italian Space Agency to carry supplies and equipment to the Space Station and back to earth KSC01padig039

description

Summary

The orbiter Discovery is finally vertical and hangs suspended in the transfer aisle of the Vehicle Assembly Building. It will next be moved into high bay 1 for mating with its solid rocket boosters and external tank. Discovery will be launched March 8 on mission STS-102, the eighth construction flight to the International Space Station. The Shuttle will carry the Multi-Purpose Logistics Module Leonardo, the first of three pressurized modules provided by the Italian Space Agency to carry supplies and equipment to the Space Station and back to earth

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

kennedy space center orbiter discovery orbiter discovery transfer aisle transfer aisle bay rocket boosters rocket boosters tank sts mission sts construction construction flight international space station multi purpose logistics module leonardo multi purpose logistics module leonardo modules italian italian space agency supplies equipment earth earth ksc padig space shuttle nasa
date_range

Date

02/02/2001
collections

in collections

Space Shuttle Program

place

Location

Kennedy Space Center / Cape Canaveral Air Force Station Fire Station 2 ,  28.52650, -80.67093
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Earth Ksc, Italian Space Agency, Multi Purpose Logistics Module Leonardo

A Lockheed Martin Atlas I space launch vehicle sits poised on launch complex 36B at Cape Canaveral Air Station, prepared to carry an Italian space agency and Dutch space agency commercial scientific payload into orbit

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, the overhead crane lifts space shuttle Atlantis from its transporter. Atlantis will be raised to vertical for transfer to high bay 3. There it will be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2487

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery begins rolling into the fog that shrouds Kennedy Space Center. Discovery is on its way from the Vehicle Assembly Building to Launch Pad 39B and mission STS-102 to the International Space Station. Its payload is the Multi-Purpose Logistics Module Leonardo, a “moving van,” to carry laboratory racks filled with equipment, experiments and supplies to and from the Space Station aboard the Space Shuttle. The flight will also carry the Expedition Two crew up to the Space Station, replacing Expedition One, who will return to Earth on Discovery. Launch is scheduled for March 8 at 6:45 a.m. EST KSC01padig067

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, a crane lifts a frustum high above the transfer aisle. The solid rocket booster segment is being moved into a high bay where it will be added to the stack being prepared for space shuttle mission STS-122, targeted for launch in December. On this mission, Atlantis will carry the Columbus Laboratory, the European Space Agency's largest contribution to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, also called Harmony, to carry out experiments in materials science, fluid physics and biosciences, as well as to support a number of technological applications. Photo credit: NASA/Jack Pfaller KSC-07pd2847

S46-24-010 - STS-046 - STS-46 MS Ivins and PS Malerba at work on OV-104's middeck

CAPE CANAVERAL, Fla. -- Space shuttle Atlantis is parked in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, following its move from Orbiter Processing Facility-2. Atlantis will be stored temporarily in the VAB while transition and retirement processing resumes on shuttle Endeavour in the processing hangar. Endeavour is being prepared for public display at the California Science Center in Los Angeles. A groundbreaking was held Jan. 18 for Atlantis' future home -- a 65,000-square-foot exhibit in Shuttle Plaza at the Kennedy Space Center Visitor Complex. For additional information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann KSC-2012-1098

KENNEDY SPACE CENTER, FLA. - On Launch Pad 39A, the Expedition 5 crew practices making a hasty exit from the 195-foot level to the slidewire baskets in the event of an emergency. They and the STS-111 crew are taking part in Terminal Countdown Demonstration Test activities, which include emergency egress training and a simulated launch countdown. Mission STS-111 is Utilization Flight 2, carrying equipment and supplies in the Multi-Purpose Logistics Module Leonardo to the International Space Station, plus the Mobile Base System (MBA) and an Orbital Replacement Unit. The MBS will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, enabling Canadarm 2 to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. The Expedition 5 crew is traveling on Endeavour to replace the Expedition 4 crew on the Station. Launch of Endeavour is scheduled for May 30, 2002 KSC-02pd0715

S46-05-024 - STS-046 - Payload Specialist Malerba prepares to make coffee on the middeck of OV-104

KENNEDY SPACE CENTER, FLA. - At SPACEHAB in Cape Canaveral, Fla., the STS-116 crew takes a break from equipment familiarization to pose for a group photo. From bottom to top are Pilot William Oefelein, Mission Specialists Joan Higginbotham, Nicholas Patrick, Robert Curbeam, Christer Fuglesang and Sunita Williams, and Commander Mark Polansky. The Swedish Fuglesang represents the European Space Agency. Mission crews make frequent trips to the Space Coast to become familiar with the equipment and payloads they will be using. STS-116 will be mission number 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. Launch is scheduled for no earlier than Dec. 7. Photo credit: NASA/George Shelton KSC-06pd2239

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle Assembly Building, workers adjust the sling attachment on the orbiter Atlantis. The orbiter will be lifted up into high bay 1 and lowered onto the mobile launcher platform where the external tank and solid rocket boosters are already stacked. Space Shuttle Atlantis is targeted to roll out to Launch Pad 39A on February 14 for mission STS-117. The mission is No. 21 to the International Space Station and construction flight 13A. Photo credit: NASA/Amanda Diller KSC-07pd0327

KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery backs out of the Orbiter Processing Facility bay 3 for the short rollover to the Vehicle Assembly Building. First motion was at 9:23 p.m. Oct. 31. In the VAB the orbiter will be mated to its large external tank and twin solid rocket boosters already stacked on the mobile launcher platform. Space Shuttle Discovery is scheduled to roll out to Launch Pad 39B no earlier than Nov. 7 for mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Kim Shiflett KSC-06pd2415

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery begins rolling out of high bay 3 of the Vehicle Assembly Building for the long, slow journey to Launch Pad 39B and launch of mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller KSC-06pd2468

Topics

kennedy space center orbiter discovery orbiter discovery transfer aisle transfer aisle bay rocket boosters rocket boosters tank sts mission sts construction construction flight international space station multi purpose logistics module leonardo multi purpose logistics module leonardo modules italian italian space agency supplies equipment earth earth ksc padig space shuttle nasa