visibility Similar

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the P6 integrated truss segment is lowered into the payload transport canister under the watchful eyes of the worker inside the canister as well as the workers on the sides. After being secured in the canister, the truss will be transported to Launch Pad 39B and the payload changeout room. Then it will be moved into Space Shuttle Endeavour’s payload bay for mission STS-97. The P6 comprises Solar Array Wing-3 and the Integrated Electronic Assembly, to be installed on the Space Station. The Station’s electrical power system will use eight photovoltaic solar arrays, each 112 feet long by 39 feet wide, to convert sunlight to electricity. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station. The STS-97 launch is scheduled Nov. 30 at 10:06 p.m. EST KSC-00pp1690

KENNEDY SPACE CENTER, FLA. -- Final preparations are under way to close the payload bay doors of the Space Shuttle Atlantis for the planned Sept. 25 liftoff of Mission STS-86. The primary payload is the SPACEHAB Double Module, shown at top center. SPACEHAB will be used mainly as a large pressurized cargo container for the three-and-a-half tons of science/logistical equipment and supplies to be exchanged between Atlantis and the Russian Space Station Mir. STS-86 will be the seventh docking of the Space Shuttle with the Mir. The 10-day flight also is scheduled to include the transfer of the sixth American to live and work aboard the Russian orbiting outpost. Liftoff of Atlantis and its seven-member crew is targeted for 10:34 p.m. EDT from Launch Pad 39A KSC-97PC1398

Saturn V instrument unit - Saturn Apollo Program

STS074-358-032 - STS-074 - Interior views of the Mir space station

STS092-365-016 - STS-092 - Ventilation ducts in the FGB/Zarya module

COMMUNICATION TECHNOLOGY SATELLITE CTS IN TANK 5 AT THE ELECTRIC PROPULSION LABORATORY EPL

CAPE CANAVERAL, Fla. – In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida, the rail car cover is removed from the first Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann KSC-2009-2312

At Launch Pad 39A, the payload on mission STS-100 moves out of the payload canister and into the payload changeout room. At the top is the Canadian robotic arm, the SSRMS, and below it is the Multi-Purpose Logistics Module Raffaello. The SSRMS is capable of handling large payloads and assisting with docking the Space Shuttle. It is crucial to the continued assembly of the International Space Station. Raffaello carries six system racks and two storage racks for the U.S. Lab. Launch of mission STS-100 is scheduled for April 19 at 2:41 p.m. EDT KSC-01pp0756

STS080-360-004 - STS-080 - Payload bay doors closing in preparation for de-orbit

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the P6 integrated truss segment is lowered into the payload transport canister under the watchful eyes of the worker inside the canister as well as the workers on the sides. After being secured in the canister, the truss will be transported to Launch Pad 39B and the payload changeout room. Then it will be moved into Space Shuttle Endeavour’s payload bay for mission STS-97. The P6 comprises Solar Array Wing-3 and the Integrated Electronic Assembly, to be installed on the Space Station. The Station’s electrical power system will use eight photovoltaic solar arrays, each 112 feet long by 39 feet wide, to convert sunlight to electricity. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station. The STS-97 launch is scheduled Nov. 30 at 10:06 p.m. EST KSC00pp1690

description

Summary

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the P6 integrated truss segment is lowered into the payload transport canister under the watchful eyes of the worker inside the canister as well as the workers on the sides. After being secured in the canister, the truss will be transported to Launch Pad 39B and the payload changeout room. Then it will be moved into Space Shuttle Endeavour’s payload bay for mission STS-97. The P6 comprises Solar Array Wing-3 and the Integrated Electronic Assembly, to be installed on the Space Station. The Station’s electrical power system will use eight photovoltaic solar arrays, each 112 feet long by 39 feet wide, to convert sunlight to electricity. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station. The STS-97 launch is scheduled Nov. 30 at 10:06 p.m. EST

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center space station truss segment truss segment payload transport canister payload transport canister eyes worker launch pad room payload changeout room endeavour bay space shuttle endeavour payload bay sts mission sts solar array wing solar array wing electronic power system power system photovoltaic use eight photovoltaic arrays sunlight electricity blanket accordion delivery orbit astronauts blankets gimbals sun est ksc space shuttle images of eyes nasa
date_range

Date

10/11/2000
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Payload Transport Canister, Gimbals, Use Eight Photovoltaic

Topics

kennedy space center space station truss segment truss segment payload transport canister payload transport canister eyes worker launch pad room payload changeout room endeavour bay space shuttle endeavour payload bay sts mission sts solar array wing solar array wing electronic power system power system photovoltaic use eight photovoltaic arrays sunlight electricity blanket accordion delivery orbit astronauts blankets gimbals sun est ksc space shuttle images of eyes nasa