visibility Similar

code Related

KENNEDY SPACE CENTER, Fla. -- Bare branches frame the liftoff of Space Shuttle Atlantis on mission STS-106 to the International Space Station. Billows of smoke and steam are illuminated by the flames of the solid rocket boosters. The perfect on-time liftoff of Atlantis occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00pp1265

KENNEDY SPACE CENTER, Fla. -- Filling the ground with billows of smoke and steam created by the flaming solid rocket boosters, Space Shuttle Atlantis speeds toward space on mission STS-106. The perfect on-time liftoff occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00pd1263

KENNEDY SPACE CENTER, Fla. -- A perfect launch sends Space Shuttle Atlantis, leaving a trail of flames and billows of smoke and clouds behind, hurtling toward space on mission STS-106. Liftoff occurred at 8:45:47 a.m. EDT today. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00padig032

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis’s solid rocket boosters trail brilliant flames that light up the clouds of smoke and steam and reflect in the waters Launch Pad 39B at launch. The perfect on-time liftoff of Atlantis on mission STS-106 occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00pp1270

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis appears to burst forth from a cocoon of smoke as it rockets toward space on mission STS-106. The perfect on-time liftoff of Atlantis occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00pp1267

KENNEDY SPACE CENTER, Fla. -- After a perfect on-time launch on mission STS-106 at 8:45:47 a.m. EDT, Space Shuttle Atlantis rolls and displays its external tank and solid rocket boosters. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00padig035

KENNEDY SPACE CENTER, Fla. -- Columns of flame spew from the solid rocket boosters hurling Space Shuttle Atlantis toward space on mission STS-106. The on-time liftoff occurred at 8:45:47 a.m. EDT for the start of an 11-day mission to the International Space Station. While on board, the seven-member crew will perform support tasks, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00pd1262

KENNEDY SPACE CENTER, Fla. -- A perfect on-time launch for Atlantis as it rockets toward space on mission STS-106. Liftoff occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00pp1570

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis rises from a cocoon of smoke as it rockets toward space on mission STS-106. The perfect on-time liftoff of Atlantis occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC00pp1571

KENNEDY SPACE CENTER, Fla. -- Bare branches frame the liftoff of Space Shuttle Atlantis on mission STS-106 to the International Space Station. Billows of smoke and steam are illuminated by the flames of the solid rocket boosters. The perfect on-time liftoff of Atlantis occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC00pp1265

description

Summary

KENNEDY SPACE CENTER, Fla. -- Bare branches frame the liftoff of Space Shuttle Atlantis on mission STS-106 to the International Space Station. Billows of smoke and steam are illuminated by the flames of the solid rocket boosters. The perfect on-time liftoff of Atlantis occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

label_outline

Tags

kennedy space center branches frame branches frame liftoff atlantis space shuttle atlantis sts mission sts international space station billows smoke steam flames rocket boosters rocket boosters crew support tasks support tasks orbit transfer supplies transfer supplies quarters zvezda module zvezda service module long duration first long duration crew expedition expedition one fall space shuttle nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Support Tasks, Transfer Supplies, First Long Duration Crew

KENNEDY SPACE CENTER, Fla. -- The payload canister arrives at the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be lifted up into the Payload Changeout Room near the top of the RSS for transfer to the payload bay of Shuttle Atlantis for mission STS-106. The PCR provides an environmentally controlled facility for the transfer. The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. Atlantis is scheduled to launch Sept. 8 at 8:31 a.m. EDT. KSC-00pp1116

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Mission Specialists Richard A. Mastracchio, Daniel C. Burbank, Yuri I. Malenchenko, Edward T. Lu and Boris V. Morukov. Behind Lu is Pilot Scott D. Altman. Not seen is Commander Terrence W. Wilcutt. Malenchenko and Morukov represent the Russian Aviation and Space Agency. The astronauts are taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed "Expedition One," which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC-00pp0955

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Mission Specialists Richard A. Mastracchio, Daniel C. Burbank, Yuri I. Malenchenko, Edward T. Lu and Boris V. Morukov. Behind Lu is Pilot Scott D. Altman. Not seen is Commander Terrence W. Wilcutt. Malenchenko and Morukov represent the Russian Aviation and Space Agency. The astronauts are taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed "Expedition One," which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0955

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery begins rolling into the fog that shrouds Kennedy Space Center. Discovery is on its way from the Vehicle Assembly Building to Launch Pad 39B and mission STS-102 to the International Space Station. Its payload is the Multi-Purpose Logistics Module Leonardo, a “moving van,” to carry laboratory racks filled with equipment, experiments and supplies to and from the Space Station aboard the Space Shuttle. The flight will also carry the Expedition Two crew up to the Space Station, replacing Expedition One, who will return to Earth on Discovery. Launch is scheduled for March 8 at 6:45 a.m. EST KSC01padig067

KENNEDY SPACE CENTER, Fla. -- At the 217-foot level of the Rotating Service Structure on Launch Pad 39B, the STS-106 crew takes a break during Terminal Countdown Demonstration Activities (TCDT) for a group photo. Pictured from left are Mission Specialists Richard A. Mastracchio, Yuri I. Malenchenko and Daniel C. Burbank; Pilot Scott D. Altman; Commander Terrence W. Wilcutt; and Mission Specialists Boris V. Morukov and Edward T. Lu. The TCDT provides the crew with emergency egress training, opportunities to inspect their mission payload in the orbiter’s payload bay, and a simulated launch countdown. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC-00pp1177

KENNEDY SPACE CENTER, Fla. -- Billows of smoke and steam roll away from Launch Pad 39B as Space Shuttle Endeavour hurtles into space on mission STS-108. The second attempt in two days, liftoff occurred at 5:19:28 p.m. EST (22:19.28 GMT). Endeavour will dock with the International Space Station on Dec. 7. STS-108 is the final Shuttle mission of 2001and the 107th Shuttle flight overall. It is the 12th flight to the Space Station. Landing of the orbiter at KSC's Shuttle Landing Facility is targeted for 1:05 p.m. EST (18:05 p.m. GMT) Dec. 16 KSC-01pp1789

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test activities, the STS-106 crew check equipment at SPACEHAB that they will be using on their mission. From left are Mission Specialists Yuri I. Malenchenko, Boris V. Morukov and Richard A. Mastracchio, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank and Edward T. Lu. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission to the International Space Station. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC00pp0944

KENNEDY SPACE CENTER, FLA. -- Billows of smoke surround the mobile launcher platform on Launch Pad 39A as Space Shuttle Atlantis lifts off on mission STS-117 to the International Space Station. Liftoff was on-time at 7:38:04 p.m. EDT. The shuttle is delivering a new segment to the starboard side of the International Space Station's backbone, known as the truss. Three spacewalks are planned to install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. STS-117 is the 118th space shuttle flight, the 21st flight to the station, the 28th flight for Atlantis and the first of four flights planned for 2007. Photo courtesy of Reuters. KSC-07pd1437

Space Shuttle Discovery: International Space Station (ISS)

CAPE CANAVERAL, Fla. – Billows of smoke and steam infused with the fiery light from space shuttle Endeavour's launch on the STS-127 mission fill NASA Kennedy Space Center's Launch Pad 39A. Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission. The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate. The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station. Photo credit: NASA/Sandra Joseph, Kevin O'Connell KSC-2009-4117

KENNEDY SPACE CENTER, Fla. - With its fiery exhaust casting a beam across the water and billows of smoke casting shadows, Space Shuttle Columbia roars into the pre-dawn sky on mission STS-109. Liftoff occurred at 6:22:02:08 a.m. EST (11:22:02:08 GMT). This was the 27th flight of the vehicle and 108th in the history of the Shuttle program. The goal of mission STS-109 is the maintenance and upgrade of the Hubble Space Telescope, to be carried out in five spacewalks. The crew comprises Commander Scott D. Altman, Pilot Duane G. Carey, Payload Commander John M. Grunsfeld, and Mission Specialists Nancy Jane Currie, Richard M. Linnehan, James H. Newman and Michael J. Massimino. After the 11-day mission, Columbia is expected to return to KSC March 12 about 4:35 a.m. EST (09:35 GMT). KSC-02pp0227

STS111-S-005 (5 June 2002) --- The Space Shuttle Endeavour lifts off, creating billows of smoke and steam on its way into space for mission STS-111 to the International Space Station (ISS). Liftoff occurred at 5:22:49 p.m. (EDT), June 5, 2002. The STS-111 crew includes astronauts Kenneth D. Cockrell, commander; Paul S. Lockhart, pilot, and Franklin R. Chang-Diaz and Philippe Perrin, mission specialists. Also onboard were the Expedition Five crewmembers including cosmonaut Valery G. Korzun, commander, along with astronaut Peggy A. Whitson and cosmonaut Sergei Y. Treschev, flight engineers. Perrin represents CNES, the French space agency, and Korzun and Treschev are with the Russian Aviation and Space Agency (Rosaviakosmos). This mission marks the 14th shuttle flight to the International Space Station and the third shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program. sts111-s-005

Topics

kennedy space center branches frame branches frame liftoff atlantis space shuttle atlantis sts mission sts international space station billows smoke steam flames rocket boosters rocket boosters crew support tasks support tasks orbit transfer supplies transfer supplies quarters zvezda module zvezda service module long duration first long duration crew expedition expedition one fall space shuttle nasa