visibility Similar

code Related

KENNEDY SPACE CENTER, Fla. -- The sun lights the early morning sky, revealing Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, at Launch Pad 39B. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13, arriving shortly after 7 a.m. Aug. 14. At its immediate left is the 290-foot high water tank that holds 300,000 gallons of water, part of the sound suppression system at the pad. At the edge of the photo can be seen part of the Rotating Service Structure. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106. KSC-00pp1123

KENNEDY SPACE CENTER, Fla. -- The sun reflects on the water as it creeps over the horizon (right), revealing Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, at Launch Pad 39B. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13, arriving shortly after 7 a.m. Aug. 14. At its immediate left is the 290-foot high water tank that holds 300,000 gallons of water, part of the sound suppression system at the pad. At the edge of the photo can be seen part of the Rotating Service Structure. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106 KSC00pp1122

KENNEDY SPACE CENTER, Fla. -- The sun creeps over the horizon (right) as Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, arrives at Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. At right is the 290-foot high water tank that holds 300,000 gallons of water. It is part of the sound suppression system at the pad. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106. KSC-00pp1121

KENNEDY SPACE CENTER, Fla. -- The early morning sun falls on Launch Pad 39A and Space Shuttle Discovery, which is waiting for launch on mission STS-92 Oct. 5, 2000. Leading to the pad (from the foreground) is the ramp leading from the crawlerway, the specially built road that provides the Shuttles access to the pads from the Vehicle Assembly Building. At the right of the pad is the 300,000-gallon water tank that is part of the sound suppression system during launches. Beyond is the Atlantic Ocean. At the far left can be seen Launch Pad 39B with its water tank KSC00pp1298

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, inches its way to Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106 KSC00pp1119

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, arrives at Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106 KSC-00pp1120

KENNEDY SPACE CENTER, Fla. -- Launch Pads 39A (foreground) and 39B are both seen in this photo, each with a Shuttle in place. Pad 39A holds Space Shuttle Discovery, which rolled out July 2 to be prepared for launch on mission STS-105 in August. Pad 39B holds Space Shuttle Atlantis, which is scheduled to launch Thursday, July 12, on mission STS-104. At right are the 290-foot water tanks that provide 300,000 gallons of water during liftoff. They are part of the sound suppression water system at each pad KSC01padig238

KENNEDY SPACE CENTER, FLA. - On Launch Pad 39B, the rotating service structure has been rolled away from Space Shuttle Atlantis, sitting on the mobile launcher platform. The crawler-transporter, which has moved underneath, will lift and carry both back to the Vehicle Assembly Building (VAB), approximately 4 miles away. Despite the clear blue skies, the rollback is a safety precaution as the area waits for the arrival of Tropical Storm Ernesto. The storm is forecast to be bringing 58-mph to 70-mph winds in the next 24 hours. The shuttle will be moved into high bay 2, on the southwest side of the VAB, for protection from the storm. Photo credit: NASA/Jim Grossmann KSC-06pd1969

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery (foreground) and Space Shuttle Atlantis (background) both stand ready on their Launch Pads ( 39A and 39B respectively). Space Shuttle Discovery rolled out July 2 to be prepared for launch on mission STS-105 in August. Space Shuttle Atlantis is scheduled to launch Thursday, July 12, on mission STS-104. Towering above each Shuttle on the left is the 80-foot lightning rod that helps protect each Shuttle from lightning strikes. At right are the 290-foot water tanks that provide 300,000 gallons of water during liftoff. They are part of the sound suppression water system at each pad KSC-01pp1247

KENNEDY SPACE CENTER, Fla. -- The sun lights the early morning sky, revealing Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, at Launch Pad 39B. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13, arriving shortly after 7 a.m. Aug. 14. At its immediate left is the 290-foot high water tank that holds 300,000 gallons of water, part of the sound suppression system at the pad. At the edge of the photo can be seen part of the Rotating Service Structure. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106. KSC00pp1123

description

Summary

KENNEDY SPACE CENTER, Fla. -- The sun lights the early morning sky, revealing Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, at Launch Pad 39B. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13, arriving shortly after 7 a.m. Aug. 14. At its immediate left is the 290-foot high water tank that holds 300,000 gallons of water, part of the sound suppression system at the pad. At the edge of the photo can be seen part of the Rotating Service Structure. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106.

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

label_outline

Tags

kennedy space center sun lights sun lights sky atlantis space shuttle atlantis mobile launcher platform mobile launcher platform crawler transporter launch pad rollout bay safe haven safe haven water tank water tank suppression system sound suppression system edge service structure sts mission sts space shuttle rocket launch nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Sun Lights, Sound Suppression System, Safe Haven

A member of the 2nd Battalion, 1ST Marines, plays a the role of patient as medical personnel inspect the ward at Fleet Hospital One, a 250-bed combat zone hospital. The marines are participating in Operation SAFE HAVEN, a combined Navy, Marine Corps, and Army exercise designed to evaluate the efficiency of field hospitals

Fire Suppression: Aerial Slurry Drops - Arkansas

Fire Suppression Research - All States, National Forest Service photograph.

DOG deploys MSST to Hurricane Dean

U.S. Air Force Airman 1st Class Ryan Mitchell, 18th

C-17 crew members and personnel from the 3rd Aerial Port Squadron and personnel from nearby Ft. Bragg load the C-17 with equipment, supplies, and trucks to be deployed to Panama

Fire Suppression: Aerial Slurry Drops - Oregon

White Sands national park - Sunset Skies

CAPE CANAVERAL, Fla. – Surrounded by four lightning suppression system towers, the SpaceX Falcon 9 rocket stands at Space Launch Complex-40 on Cape Canaveral Air Force Station in Florida. Liftoff with the SpaceX Dragon capsule aboard is set for 4:55 a.m. EDT on May 19. The launch will be the company's second demonstration test flight for NASA's Commercial Orbital Transportation Services Program, or COTS. During the flight, the capsule will conduct a series of check-out procedures to test and prove its systems, including rendezvous and berthing with the International Space Station. If the capsule performs as planned, the cargo and experiments it is carrying will be transferred to the station. The cargo includes food, water and provisions for the station’s Expedition crews, such as clothing, batteries and computer equipment. Under COTS, NASA has partnered with two aerospace companies to deliver cargo to the station. For more information, visit http://www.nasa.gov/spacex Photo credit: NASA/Jim Grossmann KSC-2012-3717

DOG deploys MSST to Hurricane Dean

EDWARDS, Calif. – Against a setting sun, space shuttle Endeavour undergoes recovery operations on Edwards Air Force Base in California after its landing. The orbiter convoy normally begins recovery operations in earnest about two hours before the shuttle is scheduled to land. Specially designed vehicles or units and a team of trained personnel “safe” the orbiter and prepare it for towing. Purge and Coolant Umbilical Access Vehicles are moved into position behind the orbiter to get access to the umbilical areas. The flight crew is replaced aboard the orbiter by exchange sup¬port personnel who prepare the orbiter for ground tow operations, install switch guards and remove data packages from any onboard experiments. After a total safety downgrade, vehicle ground personnel make numerous preparations for the towing operation, including install¬ing landing gear lock pins, disconnecting the nose landing gear drag link, positioning the towing vehicle in front of the orbiter and connecting the tow bar. The decision to land Endeavour at Edwards was made due to weather concerns at NASA's Kennedy Space Center in Florida. In the 52nd landing at Edwards, Endeavour touched down at 4:25 p.m. EST to end the STS-126 mission, completing its 16-day journey of more than 6.6 million miles in space. Endeavour will be returned to Kennedy atop a Shuttle Carrier Aircraft, or SCA, a modified Boeing 747 jetliner. Photo credit: NASA/Tony Landis, VAFB KSC-08pd3887

Skylab. NASA Skylab space station

Topics

kennedy space center sun lights sun lights sky atlantis space shuttle atlantis mobile launcher platform mobile launcher platform crawler transporter launch pad rollout bay safe haven safe haven water tank water tank suppression system sound suppression system edge service structure sts mission sts space shuttle rocket launch nasa