visibility Similar

code Related

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building, orbiter Atlantis is lifted toward a vertical position in the transfer aisle. The 122-foot long orbiter is easily accommodated inside the 525-foot-tall, 518-foot-wide VAB. Once in position, Atlantis will be mated with its external tank and solid rocket boosters before being transported to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000 KSC-00pp0357

KENNEDY SPACE CENTER, FLA. -- Viewed down the 715-foot-long Vehicle Assembly Building (VAB), the orbiter Atlantis is lifted to a vertical position in the transfer aisle. The 122-foot-long orbiter is dwarfed by the 525-foot-tall, 518-foot-wide VAB. Once in position, Atlantis will be mated with its external tank and solid rocket boosters before being transported to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000 KSC-00pp0358

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle Assembly Building (VAB), the orbiter Atlantis hangs suspended vertically from an overhead crane. The 122-foot high orbiter is easily accommodated inside the 525-foot-tall, 518-foot-wide VAB. Atlantis will be mated with its external tank and solid rocket boosters before being transported to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000 KSC-00pp0360

KENNEDY SPACE CENTER, FLA. -- Suspended by a crane over the transfer aisle of the Vehicle Assembly Building (VAB), orbiter Atlantis is lifted higher in order to move it toward the stack of external tank and solid rocket boosters at left. The 122-foot high orbiter is easily accommodated inside the 525-foot-tall, 518-foot-wide VAB. After being mated with the stack, Atlantis will be transported to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000 KSC00pp0361

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building, the orbiter Atlantis rests atop a transporter in the transfer aisle while an overhead crane is placed around the space vehicle. The crane will lift Atlantis to a vertical position so it can be mated with its external tank and solid rocket boosters before being transported to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000 KSC-00pp0355

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building (VAB), the orbiter Atlantis is close to its final position for mating with the external tank and solid rocket boosters behind it. The entire assembly sits on top of the Mobile Launcher Platform below which will transport the Space Shuttle to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000 KSC-00pp0366

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle inside the Vehicle Assembly Building, the orbiter Atlantis hangs suspended from an overhead crane that will lift the orbiter to a vertical position. Once in position, it will be mated with its external tank and solid rocket boosters before being transported to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000 KSC00pp0356

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building (VAB), the orbiter Atlantis is slowly moved toward the external tank and solid rocket boosters stack waiting below (right). After being mated with the stack, Atlantis will be transported to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000 KSC00pp0362

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building (VAB), the orbiter Atlantis is close to its final position for mating with the external tank and solid rocket boosters behind it. The entire assembly sits on top of the Mobile Launcher Platform below which will transport the Space Shuttle to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000 KSC00pp0366

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building, orbiter Atlantis is lifted toward a vertical position in the transfer aisle. The 122-foot long orbiter is easily accommodated inside the 525-foot-tall, 518-foot-wide VAB. Once in position, Atlantis will be mated with its external tank and solid rocket boosters before being transported to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000 KSC00pp0357

description

Summary

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building, orbiter Atlantis is lifted toward a vertical position in the transfer aisle. The 122-foot long orbiter is easily accommodated inside the 525-foot-tall, 518-foot-wide VAB. Once in position, Atlantis will be mated with its external tank and solid rocket boosters before being transported to Launch Pad 39A. Atlantis will fly on mission STS-101 to the International Space Station, where its crew of seven will prepare the Station for the arrival of the next pressurized module, the Russian-built Zvezda. Atlantis is expected to launch no earlier than April 17, 2000

label_outline

Tags

kennedy space center orbiter atlantis orbiter atlantis transfer aisle transfer aisle vab tank rocket boosters rocket boosters launch pad sts mission sts international space station crew module zvezda russian built zvezda vehicle assembly building rocket engines rocket technology nasa
date_range

Date

17/03/2000
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Russian Built Zvezda, Zvezda, Transfer Aisle

STS106-304-035 - STS-106 - View of a pair of wire connections on Zvezda during STS-106

KENNEDY SPACE CENTER, FLA. -- Inside the VAB, orbiter Endeavour is lifted to a vertical position before being mated to the external tank (bottom of photo) and solid rocket boosters in high bay 1. Space Shuttle Endeavour is targeted for launch on mission STS-99 Jan. 13, 2000, at 1:11 p.m. EST. STS-99 is the Shuttle Radar Topography Mission, an international project spearheaded by the National Imagery and Mapping Agency and NASA, with participation of the German Aerospace Center DLR. The SRTM consists of a specially modified radar system that will gather data for the most accurate and complete topographic map of the Earth's surface that has ever been assembled. SRTM will make use of radar interferometry, wherein two radar images are taken from slightly different locations. Differences between these images allow for the calculation of surface elevation, or change. The SRTM hardware will consist of one radar antenna in the shuttle payload bay and a second radar antenna attached to the end of a mast extended 60 meters (195 feet) out from the shuttle KSC-99pp1381

STS097-359-015 - STS-097 - Views of the nadir side of Zvezda during the initial flyaround of STS-97

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Atlantis is lowered toward the solid rocket boosters (the nose cone of one of the boosters is seen here) for mating. The tank and boosters will be secured on the mobile launcher platform below. Atlantis' STS-125 mission is the fifth and final shuttle servicing mission to NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2265

KENNEDY SPACE CENTER, FLA. -- After leaving the Orbiter Processing Facility bay 2, the orbiter Endeavour, atop its transporter, rolls toward the Vehicle Assembly Building. In the VAB, it will be stacked with the external tank and solid rocket boosters atop the mobile launcher platform for its launch on mission STS-118. The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab. Endeavour is targeted for launch on Aug. 7. Photo credit: NASA/Kim Shiflett KSC-07pd1709

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3043

CAPE CANAVERAL, Fla. -- Seen through the open bay door of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, space shuttle Discovery is being prepared for its move to Orbiter Processing Facility-1 (OPF-1). Discovery is switching places with shuttle Endeavour which has been undergoing decommissioning activities in OPF-1. Both shuttles will stop briefly outside OPF-3 for a "nose-to-nose" photo opportunity. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2011-6415

Space Shuttle Challenger, Transfer - STS-13 / 41C

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, the overhead crane lifts space shuttle Atlantis from its transporter. Atlantis will be raised to vertical for transfer to high bay 3. There it will be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2487

STS097-360-033 - STS-097 - Views of Zvezda and Progress during the initial flyaround of STS-97

The back of a man sitting in an airplane. Passenger airplane passenger train, people.

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB members of the STS-106 crew check out equipment they will be using during their mission to the International Space Station. From left are Mission Specialists Richard A. Mastracchio, Daniel C. Burbank, Yuri I. Malenchenko, Edward T. Lu and Boris V. Morukov. Behind Lu is Pilot Scott D. Altman. Not seen is Commander Terrence W. Wilcutt. Malenchenko and Morukov represent the Russian Aviation and Space Agency. The astronauts are taking part in Crew Equipment Interface Test activities at KSC. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed "Expedition One," which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC-00pp0955

Topics

kennedy space center orbiter atlantis orbiter atlantis transfer aisle transfer aisle vab tank rocket boosters rocket boosters launch pad sts mission sts international space station crew module zvezda russian built zvezda vehicle assembly building rocket engines rocket technology nasa