visibility Similar

CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane lifts part of an Apollo era diesel engine from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett KSC-2012-1339

Sailors prepare to be submerged in a modular egress training system during a simulated helicopter crash at the Aviation Survival Training Center at Naval Air Station Whidbey Island.

Saturn V - Saturn Apollo Program

CAPE CANAVERAL, Fla. – Technicians move a portable workstand under a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. The engine is being rotated into a horizontal position with the aid of an engine-handling device attached to a crane. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1917

S82E5899 - STS-082 - HST,survey of solar arrays and telescope surface

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility Bay 3 at NASA’s Kennedy Space Center, space shuttle Discovery is ready for the Orbiter Transport System, or OTS (left), to be rolled in underneath. The OTS will help move the orbiter on its rollover to the Vehicle Assembly Building. Discovery is targeted to launch May 31 on the STS-124 mission to the International Space Station. On the mission, Discovery will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM-RMS) to the space station to add to the Kibo laboratory. Photo credit: NASA/Troy Cryder KSC-08pd0966

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at the Kennedy Space Center in Florida, NASA Administrator Charles Bolden addresses news media in front of the Orion EFT-1 spacecraft. Bolden took a few dozen members of the news media on a tour of the space agency's Kennedy Space Center and adjacent Cape Canaveral Air Force Station on Aug. 23, 2012 to show the progress being made for future government and commercial space endeavors that will begin from Florida's Space Coast. For more information, visit: http://www.nasa.gov/centers/kennedy/news/kennedy-bolden-tour.html Photo credit: NASA/Kim Shiflett KSC-2012-4596

US Air Force (USAF) AIRMAN First Class (A1C) Eric Stahleben, Loadmaster, 7th Airlift Wing (AW), assist with loading palletized cargo onto a C-17A Globemaster III aircraft, while deployed at a forward location in support of Operation ENDURING FREEDOM

code Related

KENNEDY SPACE CENTER, FLA. -- Workers in the Operations and Checkout Building oversee the movement of a segment of the International Space Station (ISS), the port-side P3 truss, onto a workstand. The truss is scheduled to be added to the ISS on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The second port truss segment, P3 will be attached to the first port truss segment (P1). KSC-99pp1361

KENNEDY SPACE CENTER, FLA. -- Inside the Operations and Checkout Building, overhead cranes move a segment of the International Space Station (ISS), the port-side P3 truss, toward a workstand. The truss is scheduled to be added to the ISS on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The second port truss segment, P3 will be attached to the first port truss segment (P1). KSC-99pp1360

KENNEDY SPACE CENTER, FLA. -- Workers secure the P3 truss on the transporter for the trip to the Operations and Checkout Building. The second port-side truss is a segment of the International Space Station (ISS), scheduled to be added to the ISS on mission STS-115 in 2002 aboard Space Shuttle Atlantis. P3 will be attached to the first port truss segment (P1). KSC-99pp1356

KENNEDY SPACE CENTER, FLA. -- Inside the Operations and Checkout Building, cranes lift the top of the shipping container containing the port-side P3 truss, a segment of the International Space Station (ISS). The truss is scheduled to be added to the ISS on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The second port truss segment, P3 will be attached to the first port truss segment (P1). KSC-99pp1358

KENNEDY SPACE CENTER, FLA. -- Inside the Operations and Checkout Building, overhead cranes lift another segment of the International Space Station (ISS), the port-side P3 truss, from its shipping container. The truss is scheduled to be added to the ISS on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The second port truss segment, P3 will be attached to the first port truss segment (P1). KSC-99pp1359

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane carrying the P3 Integrated Truss Structure moves into place over a workstand where it will deposit the truss. The port-side P3 truss is scheduled to be added to the International Space Station on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The P3 will be attached to the first port truss segment, P1, being installed in an earlier mission KSC01pp0690

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane lifts the P3 Integrated Truss Structure out of the payload canister that transferred it from the Operations and Checkout Building. The port-side P3 truss is scheduled to be added to the International Space Station on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The P3 will be attached to the first port truss segment, P1, being installed in an earlier mission. KSC01pp0686

KENNEDY SPACE CENTER, FLA. -- The P3 Integrated Truss Structure is lowered onto a workstand in the Space Station Processing Facility. The port-side P3 truss is scheduled to be added to the International Space Station on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The P3 will be attached to the first port truss segment, P1, being installed in an earlier mission KSC01pp0691

KENNEDY SPACE CENTER, FLA. -- Suspended from an overhead crane in the Space Station Processing Facility, the P3 Integrated Truss Structure glides along the ceiling to a workstand, at right. The port-side P3 truss is scheduled to be added to the International Space Station on mission STS-115 in 2002 aboard Space Shuttle Atlantis. . The P3 will be attached to the first port truss segment, P1, being installed in an earlier mission KSC01pp0689

KENNEDY SPACE CENTER, FLA. -- Workers adjust connection of the port-side P3 truss on its workstand in the Operations and Checkout Building. The truss is a segment of the International Space Station (ISS), the second port truss segment, that will be attached to the first port truss segment (P1). The truss is scheduled to be added to the ISS on mission STS-115 in 2002 aboard Space Shuttle Atlantis. KSC-99pp1362

description

Summary

KENNEDY SPACE CENTER, FLA. -- Workers adjust connection of the port-side P3 truss on its workstand in the Operations and Checkout Building. The truss is a segment of the International Space Station (ISS), the second port truss segment, that will be attached to the first port truss segment (P1). The truss is scheduled to be added to the ISS on mission STS-115 in 2002 aboard Space Shuttle Atlantis.

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

Nothing Found.

label_outline

Tags

kennedy space center workers connection truss workstand checkout segment international space station iss port second port truss segment first port truss segment sts mission sts atlantis space shuttle atlantis space shuttle nasa florida cape canaveral
date_range

Date

17/11/1999
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Second Port Truss Segment, First Port Truss Segment, Connection

STS112-313-034 - STS-112 - P6 Truss solar array and EETCS radiator taken during STS-112's final flyaround

S115E06263 - STS-115 - P4 Truss SAW during third Extravehicular Activity (EVA)

CAPE CANAVERAL, Fla. – In High Bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the Ares I-X upper stage simulator service module/service adapter segment (foreground) is being prepared for its move to a stand. Other segments are placed and stacked on the floor around it. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. The Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Kim Shiflett KSC-2009-2462

Technical Sergeant (TSGT) Rossell Powell of the 347th Electronic Maintenance Squadron finds a leaking hydraulic connection on an F-4 Phantom II aircraft during an aircraft battle damage repair exercise

S132E009735 - STS-132 - S3 Truss during Joint Operations

STS110-729-050 - STS-110 - View of the forward side of the S0 Truss taken during the final flyaround STS-110

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank is practicing folding a sequential shunt unit launch to activation multilayer installation blanket. Burbank and other crew members are at the center for Crew Equipment Interface Test activities. Equipment familiarization is a routine part of astronaut training and launch preparations. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1181

VANDENBERG ABF, Calif. - The Orbital Sciences Pegasus XL rocket that will lift NASA's IRIS solar observatory into orbit is moved from a hangar onto a transporter at Vandenberg Air Force Base. IRIS, short for Interface Region Imaging Spectrograph, is being prepared for launch from Vandenberg June 26. IRIS will open a new window of discovery by tracing the flow of energy and plasma through the chromospheres and transition region into the sun’s corona using spectrometry and imaging. IRIS fills a crucial gap in our ability to advance studies of the sun-to-Earth connection by tracing the flow of energy and plasma through the foundation of the corona and the region around the sun known as the heliosphere. Photo credit: VAFB/Randy Beaudoin KSC-2013-2726

S102E5027 - STS-102 - MS Richards during hardware checkout on the flight deck

S128E008199 - STS-128 - S3 Truss

S132E009774 - STS-132 - S1 Truss during Joint Operations

S135E008639 - STS-135 - Survey View of P1 Truss

Topics

kennedy space center workers connection truss workstand checkout segment international space station iss port second port truss segment first port truss segment sts mission sts atlantis space shuttle atlantis space shuttle nasa florida cape canaveral