visibility Similar

S115E06964 - STS-115 - Yeast GAP in the MDDK of the Space Shuttle Atlantis during Expedition 13 / STS-115 Joint Operations

The Neurolab payload for STS-90, scheduled to launch aboard the Shuttle Columbia from Kennedy Space Center (KSC) on April 2, 1998, is ready for processing after being placed in its workstand in the Operations and Checkout Building at KSC. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. Specifically, experiments will study the adaptation of the vestibular system, the central nervous system, and the pathways that control the ability to sense location in the absence of gravity, as well as the effect of microgravity on a developing nervous system. The crew of STS-90 will include Commander Richard Searfoss, Pilot Scott Altman, Mission Specialists Richard Linnehan, Dafydd (Dave) Williams, M.D., and Kathryn (Kay) Hire, and Payload Specialists Jay Buckey, M.D., and James Pawelczyk, Ph.D KSC-97PC1717

COMMUNICATION TECHNOLOGY SATELLITE CTS PROJECT - TANK 5 OF THE ELECTRIC PROPULSION LABORATORY EPL

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39B, the STS-103 payload awaits closing of Discovery's payload bay doors. The payload, which will enable the crew of seven to service the Hubble Space Telescope, consists of gyroscopes that allow the telescope to point at stars, galaxies and planets; a Fine Guidance Sensor, a new enhanced computer to replace an older model, a solid-state digital recorder, a new spare transmitter, and new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of Space Shuttle Discovery on mission STS-103 is targeted for Dec. 9 at 1:10 a.m. EST KSC-99pp1364

KENNEDY SPACE CENTER, FLA. -- Being lowered into the payload bay of Discovery for a closer look at the payload are STS-92 Mission Specialists Leroy Chiao (second from left) and Bill McArthur (far right), accompanied by Boeing workers. In the foreground is the Pressurized Mating Adapter-3. They and other crew members Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Jeff Wisoff and Michael Lopez-Alegria are taking part in Crew Equipment Interface Test activities. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs) KSC00pp0914

STS089-301-002 - STS-089 - Interior views of Spacehab during STS-89

STS101-387-012 - STS-101 - Documentation of hatch hardware in the Node 1/Unity module

KENNEDY SPACE CENTER, FLA. -- On Launch Complex 39B, the payload bay doors on the orbiter Discovery, scheduled to launch mission STS-95, are poised for closure. The mission includes the SPACEHAB single module (seen at the top of the bay) with experiments on space flight and the aging process, the International Extreme Ultraviolet Hitchhiker (IEH-3), the Hubble Space Telescope Orbital Systems Test Platform, and the Spartan solar-observing deployable spacecraft. STS-95 is expected to launch at 2 p.m. EST on Oct. 29, last 8 days, 21 hours and 49 minutes, and land at 11:49 a.m. EST on Nov. 7 KSC-98pc1389

S115E06970 - STS-115 - Yeast GAP in the MDDK of the Space Shuttle Atlantis during Expedition 13 / STS-115 Joint Operations

code Related

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility (SSPF), workers from the Italian aerospace company Alenia Aerospazio begin removing the protective cover from the Multi-Purpose Logistics Module (MPLM) called Raffaello. The Italian aerospace company will provide engineering support for Raffaello, along with NASA, Boeing and the Italian Space Agency. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello will undergo testing. joining the first Italian-built MPLM, Leonardo, also in the SSPF. Raffaello is scheduled to be launched on mission STS-100 on July 27, 2000 KSC-99pp1028

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility (SSPF), workers from the Italian aerospace company Alenia Aerospazio begin removing the protective cover from the Multi-Purpose Logistics Module (MPLM) called Raffaello. The Italian aerospace company will provide engineering support for Raffaello, along with NASA, Boeing and the Italian Space Agency. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello will undergo testing. joining the first Italian-built MPLM, Leonardo, also in the SSPF. Raffaello is scheduled to be launched on mission STS-100 on July 27, 2000 KSC-99pp1029

KENNEDY SPACE CENTER, FLA. -- The Multi-Purpose Logistics Module (MPLM) called Raffaello sits on a transporter waiting for transfer to the Space Station Processing Facility (SSPF). At the SSPF the Raffaello will undergo testing, joining the first Italian-built MPLM, Leonardo. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello is scheduled to be launched on mission STS-100 July 27, 2000 KSC-99pp1018

KENNEDY SPACE CENTER, FLA. -- The Multi-Purpose Logistics Module (MPLM) called Raffaello is suspended above a workstand in the Space Station Processing Facility (SSPF) where it will undergo testing. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Also inside the SSPF is the first Italian-built MPLM, Leonardo, also undergoing testing for its launch on mission STS-102 scheduled for June 29, 2000. Raffaello is scheduled to be launched on mission STS-100 on July 27, 2000 KSC-99pp1025

KENNEDY SPACE CENTER, FLA. -- The second Multi-Purpose Logistics Module (MPLM) for the International Space Station (ISS), named Raffaello, is moved out of the "Beluga" Super Transporter at the Shuttle Landing Facility. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the module measures 21 feet long and 15 feet in diameter. Raffaello will join Leonardo, the first Italian-built MPLM, in the Space Station Processing Facility for testing. NASA, Boeing, the Italian Space Agency and Alenia Aerospazio will provide engineering support KSC-99pp1015

KENNEDY SPACE CENTER, FLA. -- Cranes supporting the Multi-Purpose Logistics Module (MPLM) called Raffaello lower it onto a transporter for transfer to the Space Station Processing Facility (SSPF). At the SSPF the Raffaello will undergo testing, joining the first Italian-built MPLM, Leonardo. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello is scheduled to be launched on mission STS-100 July 27, 2000 KSC-99pp1017

KENNEDY SPACE CENTER, FLA. -- Inside a high bay in the Space Station Processing Facility (SSPF), the Multi-Purpose Logistics Module (MPLM) called Raffaello waits for transfer to a workstand. There it will undergo testing, joining the first Italian-built MPLM, Leonardo, in the SSPF. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello is scheduled to be launched on mission STS-100 July 27, 2000 KSC-99pp1022

KENNEDY SPACE CENTER, FLA. -- Inside a high bay in the Space Station Processing Facility (SSPF), the Multi-Purpose Logistics Module (MPLM) called Raffaello is lifted out of its canister by an overhead crane. It will be moved to a workstand to undergo testing. Raffaello joins the first Italian-built MPLM, Leonardo, in the SSPF. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello is scheduled to be launched on mission STS-100 July 27, 2000 KSC-99pp1023

KENNEDY SPACE CENTER, FLA. -- At the Shuttle Landing Facility, workers begin offloading the Raffaello, the second Multi-Purpose Logistics Module (MPLM) for the International Space Station (ISS), from the "Beluga" Super Transporter that brought it from Italy. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the module measures 21 feet long and 15 feet in diameter. Raffaello will join Leonardo, the first Italian-built MPLM, in the Space Station Processing Facility for testing. NASA, Boeing, the Italian Space Agency and Alenia Aerospazio will provide engineering support KSC-99pp1012

KENNEDY SPACE CENTER, FLA. -- The Multi-Purpose Logistics Module (MPLM) called Raffaello rests in its workstand in the Space Station Processing Facility (SSPF) as an Alenia Aerospazio worker passes by. The Italian aerospace company will provide engineering support for Raffaello, along with NASA, Boeing and the Italian Space Agency. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello will undergo testing. joining the first Italian-built MPLM, Leonardo, also in the SSPF. Raffaello is scheduled to be launched on mission STS-100 on July 27, 2000 KSC-99pp1027

description

Summary

KENNEDY SPACE CENTER, FLA. -- The Multi-Purpose Logistics Module (MPLM) called Raffaello rests in its workstand in the Space Station Processing Facility (SSPF) as an Alenia Aerospazio worker passes by. The Italian aerospace company will provide engineering support for Raffaello, along with NASA, Boeing and the Italian Space Agency. One of Italy's major contributions to the ISS program, the MPLM is a reusable logistics carrier and the primary delivery system used to resupply and return station cargo requiring a pressurized environment. Weighing nearly 4.5 tons, the Raffaello measures 21 feet long and 15 feet in diameter. Raffaello will undergo testing. joining the first Italian-built MPLM, Leonardo, also in the SSPF. Raffaello is scheduled to be launched on mission STS-100 on July 27, 2000

label_outline

Tags

kennedy space center multi purpose logistics module multi purpose logistics module mplm raffaello workstand space station sspf alenia aerospazio worker alenia aerospazio worker italian aerospace company italian aerospace company support italian space agency contributions iss program iss program carrier logistics carrier delivery system delivery system cargo return station cargo environment tons measures raffaello measures diameter italian built first italian built mplm leonardo sts mission sts nasa florida cape canaveral
date_range

Date

05/08/1999
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Raffaello Measures, First Italian Built Mplm, Iss Program

KENNEDY SPACE CENTER, FLA. - The Italian-built module, U.S. Node 2, arrives at the Space Station Processing Facility after its move from the Shuttle Landing Facility. The second of three connecting modules on the International Space Station, Node 2 attaches to the end of the U.S. Lab and provides attach locations for the Japanese laboratory, European laboratory, the Centrifuge Accommodation Module and, later, Multipurpose Logistics Modules. It will provide the primary docking location for the Shuttle when a pressurized mating adapter is attached to Node 2. Installation of the module will complete the U.S. Core of the ISS. Node 2 is the designated payload for mission STS-120. No orbiter or launch date has been determined yet.

US Air Force (USAF) STAFF Sergeant (SSGT) Jeanette E. King, Loadmaster, 97th Air Mobility Wing (AMW), Altus Air Force Base (AFB), Oklahoma (OK), wraps the restraining straps from her harness after a Containerized Delivery System (CDS) bundle drop from the lowered cargo ramp of a C-17A Globemaster III Cargo aircraft during the USAF Air Mobility Command (AMC) sponsored Rodeo 98 airlift competition at McChord AFB, Washington (WA)

A night vision shot as a US Air Force C-17A Globemaster III loadmaster watches as his cargo of Tri-Wall Aerial Delivery System (TRIADS) loaded with Humanitarian Daily Rations (HDR) slides toward the ramp and out of the aircraft during the successful C-17 humanitarian airdrop. Air Force C-17's delivered Humanitarian Daily Rations (HDR) in support of Operation ENDURING FREEDOM from Germany to Afghan refugees who massed inside the borders of Afghanistan. The C-17's carried more than 35,000 HDRs packed in 84 TRIAD boxes. Each box measures 80 inches tall and 48 inches square, containing 420 HDRs. The HDRs were delivered in a of its kind, high-altitude airdrop. This is the...

S46-05-024 - STS-046 - Payload Specialist Malerba prepares to make coffee on the middeck of OV-104

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center, astronaut Charles Hobaugh, right, conducts a fit check of the robotic workstation, or RWS, in the International Space Station's Cupola module. He is assisted by Boeing technician Terry Camarata, left. The RWS is provided by the Canadian Space Agency. The module was delivered by the European Space Agency in 2004 to Kennedy from Alenia Spazio in Turin, Italy. Cupola will provide unprecedented views of activities outside the station and spectacular views of the Earth. Crew members working inside the module will have a 360-degree panoramic view. Cupola has the capability for command and control workstations to be installed to assist in space station remote manipulator system and extra vehicular activities. Cupola is the final element of the space station core and is scheduled for launch on space shuttle Endeavour's STS-130 mission, targeted for Dec. 10, 2009. Photo credit: NASA/Cory Huston KSC-08pd2196

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle Assembly Building at KSC, an overhead crane raises external tank No. 120 to a vertical position. The tank will next be lifted into a checkout cell. ET-120 will be prepared for stacking with solid rocket boosters to launch Space Shuttle Discovery on mission STS-120 in October. The mission is the 23rd to the International Space Station and will launch an Italian-built, U.S. multi-port module known as Harmony for the station. Christened after a school contest, Harmony will provide attachment points for European and Japanese laboratory modules. NASA/George Shelton KSC-07pd2149

KENNEDY SPACE CENTER, FLA. — In the Space Station Processing Facility at NASA Kennedy Space Center, the multi-purpose logistics module Leonardo (center) is being fitted with supply racks. The module is being prepared for the second return-to-flight mission, STS-121, on space shuttle Discovery, carrying more than two tons of equipment and supplies to the International Space Station. This will be the fourth trip to the station for Leonardo, the first of three Italian-built logistics modules. Equipment and supplies no longer needed on the station will be moved to Leonardo before it is unberthed on Flight Day 10 and put back into Discovery's cargo bay for return to Earth. This second return-to-flight test mission is to carry on analysis of safety improvements that debuted on the first return-to-flight mission, STS-114, and build upon those tests. The launch is targeted for a date no earlier than May. Photo credit: NASA/Jack Pfaller KSC-06pd0131

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building, space shuttle Discovery is lifted into the upper regions for transfer to high bay 1. In the bay, Discovery will be mated with the external tank and solid rocket boosters waiting on the mobile launcher platform. Discovery is targeted for launch to the International Space Station for mission STS-120 on Oct. 23. The crew will be delivering and installing the Italian-built U.S. Node 2, named Harmony. The pressurized module will act as an internal connecting port and passageway to additional international science labs and cargo spacecraft. In addition to increasing the living and working space inside the station, it also will serve as a work platform outside for the station's robotic arm. Photo credit: NASATroy Cryder KSC-07pd2552

KENNEDY SPACE CENTER, FLA. -- In space shuttle Discovery's payload bay, STS-120 crew members get a close look at the equipment and payloads. Seen here is Mission Specialist Paolo Nespoli, who represents the European Space Agency, pointing to the Italian-built U.S. Node 2, named Harmony. The TCDT provides astronauts and ground crews an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station. Launch of Discovery on mission STS-120 is targeted for Oct. 23 at 11:38 a.m. EDT on a 14-day mission. Photo credit: NASA/Kim Shiflett KSC-07pd2750

KENNEDY SPACE CENTER, FLA. -- On the floor of the Space Station Processing Facility, astronauts Dan Tani (left) and Peggy Whitson practice working with a cover, something they may handle during an upcoming shuttle flight. With construction of the Space Station the primary focus of future shuttle missions, astronaut crews will be working with one or more of the elements and hardware already being processed in the SSPF. Photo credit: NASA/Kim Shiflett KSC-07pd0306

Advanced Plant Habitat. NASA public domain image. Kennedy space center.

Dr. Thomas Zurbuchen Visits SSPF

Topics

kennedy space center multi purpose logistics module multi purpose logistics module mplm raffaello workstand space station sspf alenia aerospazio worker alenia aerospazio worker italian aerospace company italian aerospace company support italian space agency contributions iss program iss program carrier logistics carrier delivery system delivery system cargo return station cargo environment tons measures raffaello measures diameter italian built first italian built mplm leonardo sts mission sts nasa florida cape canaveral