visibility Similar

code Related

NASA Administrator Dan Goldin congratulates Phase I Shuttle/Mir Program Manager Frank Culbertson on the successful conclusion of Phase I of the joint U.S.-Russian International Space Station Program at KSC's Shuttle Landing Facility following Discovery's landing, as Mission Commander Charles J. Precourt (applauding) and the other members of the STS-91 flight crew look on. Culbertson is holding an American flag, a special wrench, and an optical disc, which he had just been presented by Goldin. The flag rode aboard Mir from the beginning of the Phase I program, the wrench was used on Mir and will be used on the International Space Station, and the optical disc holds data recorded on Mir. All of these items were brought back to Earth from Mir by the STS-91 crew. Discovery's main gear touchdown on Runway 15 was at 2:00:18 p.m. EDT on June 12, 1998, on orbit 155 of the mission. The wheels stopped at 2:01:22 p.m. EDT, for a total mission-elapsed time of 9 days, 19 hours, 55 minutes and 1 second. The 91st Shuttle mission was the 44th KSC landing in the history of the Space Shuttle program and the 15th consecutive landing at KSC. Besides Commander Precourt, the STS-91 flight crew also included Pilot Dominic L. Gorie and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet Lynn Kavandi and Valery Victorovitch Ryumin of the Russian Space Agency. Astronaut Andrew S. W. Thomas also returned to Earth from Mir as an STS-91 crew member after 141 days in space KSC-98pc749

NASA Administrator Dan Goldin, STS-91 Mission Commander Charles J. Precourt, and STS-91 Mission Specialist Valery Victorovitch Ryumin of the Russian Space Agency inspect the orbiter Discovery after its landing at KSC's Shuttle Landing Facility, completing the STS-91 mission. Main gear touchdown occurred on Runway 15 at 2:00:18 p.m. EDT on June 12, 1998, on orbit 155 of the mission. The wheels stopped at 2:01:22 p.m. EDT, for a total mission-elapsed time of 9 days, 19 hours, 55 minutes and 1 second. The 91st Shuttle mission was the 44th KSC landing in the history of the Space Shuttle program and the 15th consecutive landing at KSC. During the mission, the Shuttle docked with the Russian space station Mir for the ninth time, concluding Phase I of the joint U.S.-Russian International Space Station Program. STS-91 also featured first flights for both the Alpha Magnetic Spectrometer and the Space Shuttle super lightweight external tank. The STS-91 flight crew also included Pilot Dominic L. Gorie and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, and Janet Lynn Kavandi. Astronaut Andrew S. W. Thomas also returned to Earth from Mir as an STS-91 crew member after 141 days in space KSC-98pc750

KENNEDY SPACE CENTER, FLA. -- With the 525-foot-tall Vehicle Assemble Building as backdrop, the orbiter Discovery touches down on Runway 15 of KSC's Shuttle Landing Facility to complete the STS-91 mission. Main gear touchdown was at 2:00:18 p.m. EDT on June 12, 1998, landing on orbit 155 of the mission. The wheels stopped at 2:01:22 p.m. EDT, for a total mission-elapsed time of 9 days, 19 hours, 55 minutes and 1 second. The 91st Shuttle mission was the 44th KSC landing in the history of the Space Shuttle program and the 15th consecutive landing at KSC. During the mission, the orbiter docked with the Russian space station Mir for the ninth time, concluding Phase I of the joint U.S.-Russian International Space Station Program. STS-91 also featured first flights for both the Alpha Magnetic Spectrometer and the Space Shuttle super lightweight external tank. The STS-91 flight crew included Mission Commander Charles J. Precourt; Pilot Dominic L. Gorie; and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet Lynn Kavandi and Valery Victorovitch Ryumin of the Russian Space Agency. Astronaut Andrew S. W. Thomas also returned to Earth from Mir as an STS-91 crew member after 141 days in space KSC-98dc736

KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery nears touchdown on Runway 15 of KSC's Shuttle Landing Facility (SLF) to complete the STS-91 mission. The SLF is nestled among the wilds of the Merritt Island National Wildlife Refuge, as is apparent from the abundance of native vegetation and water surrounding the landing strip. Main gear touchdown was at 2:00:18 p.m. EDT on June 12, 1998, landing on orbit 155 of the mission. The wheels stopped at 2:01:22 p.m. EDT, for a total mission-elapsed time of 9 days, 19 hours, 55 minutes and 1 second. The 91st Shuttle mission was the 44th KSC landing in the history of the Space Shuttle program and the 15th consecutive landing at KSC. During the mission, the orbiter docked with the Russian space station Mir for the ninth time, concluding Phase I of the joint U.S.-Russian International Space Station Program. STS-91 also featured first flights for both the Alpha Magnetic Spectrometer and the Space Shuttle super lightweight external tank. The STS-91 flight crew included Mission Commander Charles J. Precourt; Pilot Dominic L. Gorie; and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet Lynn Kavandi and Valery Victorovitch Ryumin of the Russian Space Agency. Astronaut Andrew S. W. Thomas also returned to Earth from Mir as an STS-91 crew member after 141 days in space KSC-98dc734

KENNEDY SPACE CENTER, FLA. -- Startled by the almost silent appearance of the orbiter Discovery as it lands following the STS-91 mission, several birds hurriedly leave KSC's Shuttle Landing Facility (SLF) for a more secluded spot. The SLF is nestled among the wilds of the Merritt Island National Wildlife Refuge, home to over 300 species of birds. Discovery's main gear touchdown on Runway 15 was at 2:00:18 p.m. EDT on June 12, 1998, landing on orbit 155 of the mission. The wheels stopped at 2:01:22 p.m. EDT, for a total mission-elapsed time of 9 days, 19 hours, 55 minutes and 1 second. The 91st Shuttle mission was the 44th KSC landing in the history of the Space Shuttle program and the 15th consecutive landing at KSC. During the mission, the orbiter docked with the Russian space station Mir for the ninth time, concluding Phase I of the joint U.S.-Russian International Space Station Program. STS-91 also featured first flights for both the Alpha Magnetic Spectrometer and the Space Shuttle super lightweight external tank. The STS-91 flight crew included Mission Commander Charles J. Precourt; Pilot Dominic L. Gorie; and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet Lynn Kavandi and Valery Victorovitch Ryumin of the Russian Space Agency. Astronaut Andrew S. W. Thomas also returned to Earth as an STS-91 crew member after 141 days in space KSC-98pc739

KENNEDY SPACE CENTER, FLA. -- With the 525-foot-tall Vehicle Assemble Building as backdrop, the orbiter Discovery touches down on Runway 15 of KSC's Shuttle Landing Facility to complete the STS-91 mission. Main gear touchdown was at 2:00:18 p.m. EDT on June 12, 1998, landing on orbit 155 of the mission. The wheels stopped at 2:01:22 p.m. EDT, for a total mission-elapsed time of 9 days, 19 hours, 55 minutes and 1 second. The 91st Shuttle mission was the 44th KSC landing in the history of the Space Shuttle program and the 15th consecutive landing at KSC. During the mission, the orbiter docked with the Russian space station Mir for the ninth time, concluding Phase I of the joint U.S.-Russian International Space Station Program. STS-91 also featured first flights for both the Alpha Magnetic Spectrometer and the Space Shuttle super lightweight external tank. The STS-91 flight crew included Mission Commander Charles J. Precourt; Pilot Dominic L. Gorie; and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet Lynn Kavandi and Valery Victorovitch Ryumin of the Russian Space Agency. Astronaut Andrew S. W. Thomas also returned to Earth as an STS-91 crew member after 141 days in space KSC-98pc744

KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery touches down on Runway 15 of KSC's Shuttle Landing Facility to complete the STS-91 mission. Main gear touchdown was at 2:00:18 p.m. EDT on June 12, 1998, landing on orbit 155 of the mission. The wheels stopped at 2:01:22 p.m. EDT, for a total mission-elapsed time of 9 days, 19 hours, 55 minutes and 1 second. The 91st Shuttle mission was the 44th KSC landing in the history of the Space Shuttle program and the 15th consecutive landing at KSC. During the mission, the orbiter docked with the Russian space station Mir for the ninth time, concluding Phase I of the joint U.S.-Russian International Space Station Program. STS-91 also featured first flights for both the Alpha Magnetic Spectrometer and the Space Shuttle super lightweight external tank. The STS-91 flight crew included Mission Commander Charles J. Precourt; Pilot Dominic L. Gorie; and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet Lynn Kavandi and Valery Victorovitch Ryumin of the Russian Space Agency. Astronaut Andrew S. W. Thomas also returned to Earth as an STS-91 crew member after 141 days in space KSC-98pc747

KENNEDY SPACE CENTER, FLA. -- With its drag chute deployed, the orbiter Discovery touches down on Runway 15 of KSC's Shuttle Landing Facility to complete the STS-91 mission. Main gear touchdown was at 2:00:18 p.m. EDT on June 12, 1998, landing on orbit 155 of the mission. The wheels stopped at 2:01:22 p.m. EDT, for a total mission-elapsed time of 9 days, 19 hours, 55 minutes and 1 second. The 91st Shuttle mission was the 44th KSC landing in the history of the Space Shuttle program and the 15th consecutive landing at KSC. During the mission, the orbiter docked with the Russian space station Mir for the ninth time, concluding Phase I of the joint U.S.-Russian International Space Station Program. STS-91 also featured first flights for both the Alpha Magnetic Spectrometer and the Space Shuttle super lightweight external tank. The STS-91 flight crew included Mission Commander Charles J. Precourt; Pilot Dominic L. Gorie; and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet Lynn Kavandi and Valery Victorovitch Ryumin of the Russian Space Agency. Astronaut Andrew S. W. Thomas also returned to Earth from Mir as an STS-91 crew member after 141 days in space KSC-98dc737

KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery touches down on Runway 15 of KSC's Shuttle Landing Facility to complete the STS-91 mission. Main gear touchdown was at 2:00:18 p.m. EDT on June 12, 1998, landing on orbit 155 of the mission. The wheels stopped at 2:01:22 p.m. EDT, for a total mission-elapsed time of 9 days, 19 hours, 55 minutes and 1 second. The 91st Shuttle mission was the 44th KSC landing in the history of the Space Shuttle program and the 15th consecutive landing at KSC. During the mission, the orbiter docked with the Russian space station Mir for the ninth time, concluding Phase I of the joint U.S.-Russian International Space Station Program. STS-91 also featured first flights for both the Alpha Magnetic Spectrometer and the Space Shuttle super lightweight external tank. The STS-91 flight crew included Mission Commander Charles J. Precourt; Pilot Dominic L. Gorie; and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet Lynn Kavandi and Valery Victorovitch Ryumin of the Russian Space Agency. Astronaut Andrew S. W. Thomas also returned to Earth from Mir as an STS-91 crew member after 141 days in space KSC-98dc738

STS-91 Mission Commander Charles J. Precourt (at microphone) presents an American flag, a special wrench, and an optical disc to NASA Administrator Dan Goldin following Discovery's landing at KSC's Shuttle Landing Facility, as Phase I Shuttle/Mir Program Manager Frank Culbertson and the other members of the STS-91 flight crew look on. This landing not only concluded the STS-91 mission, but Phase I of the joint U.S.-Russian International Space Station Program as well. The flag rode aboard Mir from the beginning of the Phase I program, the wrench was used on Mir and will be used on the International Space Station, and the optical disc holds data recorded on Mir. All of these items were brought back to Earth from Mir by the STS-91 crew. Discovery's main gear touchdown on Runway 15 was at 2:00:18 p.m. EDT on June 12, 1998, on orbit 155 of the mission. The wheels stopped at 2:01:22 p.m. EDT, for a total mission-elapsed time of 9 days, 19 hours, 55 minutes and 1 second. The 91st Shuttle mission was the 44th KSC landing in the history of the Space Shuttle program and the 15th consecutive landing at KSC. Besides Commander Precourt, the STS-91 flight crew also included Pilot Dominic L. Gorie and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet Lynn Kavandi and Valery Victorovitch Ryumin of the Russian Space Agency. Astronaut Andrew S. W. Thomas also returned to Earth from Mir as an STS-91 crew member after 141 days in space KSC-98pc748

description

Summary

STS-91 Mission Commander Charles J. Precourt (at microphone) presents an American flag, a special wrench, and an optical disc to NASA Administrator Dan Goldin following Discovery's landing at KSC's Shuttle Landing Facility, as Phase I Shuttle/Mir Program Manager Frank Culbertson and the other members of the STS-91 flight crew look on. This landing not only concluded the STS-91 mission, but Phase I of the joint U.S.-Russian International Space Station Program as well. The flag rode aboard Mir from the beginning of the Phase I program, the wrench was used on Mir and will be used on the International Space Station, and the optical disc holds data recorded on Mir. All of these items were brought back to Earth from Mir by the STS-91 crew. Discovery's main gear touchdown on Runway 15 was at 2:00:18 p.m. EDT on June 12, 1998, on orbit 155 of the mission. The wheels stopped at 2:01:22 p.m. EDT, for a total mission-elapsed time of 9 days, 19 hours, 55 minutes and 1 second. The 91st Shuttle mission was the 44th KSC landing in the history of the Space Shuttle program and the 15th consecutive landing at KSC. Besides Commander Precourt, the STS-91 flight crew also included Pilot Dominic L. Gorie and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet Lynn Kavandi and Valery Victorovitch Ryumin of the Russian Space Agency. Astronaut Andrew S. W. Thomas also returned to Earth from Mir as an STS-91 crew member after 141 days in space

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

kennedy space center sts commander charles mission commander charles j precourt microphone american flag american flag disc administrator dan goldin nasa administrator dan goldin discovery phase mir manager frank culbertson flight crew phase i phase i program wrench international space station items gear touchdown gear touchdown runway orbit wheels hours minutes st shuttle mission space shuttle program commander precourt pilot dominic pilot dominic l gorie specialists wendy mission specialists wendy b lawrence franklin franklin r chang diaz janet lynn kavandi janet lynn kavandi valery victorovitch ryumin valery victorovitch ryumin russian russian space agency astronaut andrew astronaut andrew s thomas crew member space ksc crew members space shuttle images of american flag sts 91 flight crew sts 91 mission commander charles mir program manager frank culbertson international space station program sts 91 crew member sts 91 mission sts 91 crew shuttle mission mission specialists wendy earth edt ksc astronauts nasa
date_range

Date

12/06/1998
collections

in collections

Space Shuttle Program

place

Location

Kennedy Space Center / Cape Canaveral Air Force Station Fire Station 2 ,  28.52650, -80.67093
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Valery Victorovitch Ryumin, Franklin R, Sts 91 Crew Member

STS091-379-002 - STS-091 - STS-91 crew is greeted at the hatch by Mir 25 crewmembers

A Delta 162 launch vehicle, carrying Westar V, the fifth in a series of Western Union communications satellites, lifts off from Pad 17 at 8:24 p.m. EDT

STS091-379-020 - STS-091 - STS-91 crew is greeted at the hatch by Mir 25 crewmembers

STS091-383-002 - STS-091 - STS-91 crew inflight portraits

STS091-379-008 - STS-091 - STS-91 crew is greeted at the hatch by Mir 25 crewmembers

The Cassini interplanetary mission to Saturn and its moon, Titan, is successfully carried into space by a Lockheed Martin Titan IVB launch vehicle at 4:43 A.M. EDT from complex 40

S84E5246 - STS-084 - Precourt with personal FDF in flight deck

KENNEDY SPACE CENTER, Fla. -- Startled by the thunderous roar of the Space Shuttle Discovery’s engines as it lifts off, birds hurriedly leave the Launch Pad 39A area for a more peaceful site. Liftoff time for the 91st Shuttle launch and last Shuttle-Mir mission was 6:06:24 p.m. EDT June 2. On board Discovery are Mission Commander Charles J. Precourt; Pilot Dominic L. Gorie; and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet Lynn Kavandi and Valery Victorovitch Ryumin. The nearly 10-day mission will feature the ninth and final Shuttle docking with the Russian space station Mir, the first Mir docking for the Space Shuttle orbiter Discovery, the first on-orbit test of the Alpha Magnetic Spectrometer (AMS), and the first flight of the new Space Shuttle super lightweight external tank. Astronaut Andrew S. W. Thomas will be returning to Earth as an STS-91 crew member after living more than four months aboard Mir KSC-98pc732

S105E5053 - STS-105 - Expedition Three crew portrait of Tyurin, Dezhurov and Culbertson

STS091-379-023 - STS-091 - STS-91 crew is greeted at the hatch by Mir 25 crewmembers

STS-41 Discovery lifts off from Launch Complex 39 at the Kennedy Space Center to begin a four-day mission in space for its five-man crew. Onboard the spacecraft were Astronauts Richard N. Richards, Robert D Cabana, William M Sheperd, Bruce E. Melnick and Thomas D. Akers. Lift off was at 7:47 a.m. EDT on oct 6, 1990. A feww hours after this photo was made, the crewmembers released the Ulysses spacecraft onits way to a long-awaited mission. ARC-1991-AC91-0165-5

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-99 Mission Specialists Janet Lynn Kavandi (Ph.D.) and Gerhard P.J. Thiele look over part of the Shuttle Radar Topography Mission (SRTM), primary payload for their mission, as part of a Crew Equipment Interface Test (CEIT). Also taking part in the CEIT are Commander Kevin R. Kregel, Pilot Dominic L. Pudwill Gorie, and Mission Specialists Janice Voss (Ph.D.) and Mamoru Mohri. Mohri is with the National Space Development Agency (NASDA) of Japan, and Thiele is with the European Space Agency. The CEIT provides an opportunity for crew members to check equipment and facilities that will be aboard the orbiter during their mission. The SRTM is a specially modified radar system that will gather data for the most accurate and complete topographic map of the Earth's surface that has ever been assembled. SRTM will make use of radar interferometry, wherein two radar images are taken from slightly different locations. Differences between these images allow for the calculation of surface elevation, or change. The SRTM hardware will consist of one radar antenna in the shuttle payload bay and a second radar antenna attached to the end of a mast extended 60 meters (195 feet) out from the shuttle. STS-99 is scheduled to launch Sept. 16 at 8:47 a.m. from Launch Pad 39A KSC-99pp0999

Topics

kennedy space center sts commander charles mission commander charles j precourt microphone american flag american flag disc administrator dan goldin nasa administrator dan goldin discovery phase mir manager frank culbertson flight crew phase i phase i program wrench international space station items gear touchdown gear touchdown runway orbit wheels hours minutes st shuttle mission space shuttle program commander precourt pilot dominic pilot dominic l gorie specialists wendy mission specialists wendy b lawrence franklin franklin r chang diaz janet lynn kavandi janet lynn kavandi valery victorovitch ryumin valery victorovitch ryumin russian russian space agency astronaut andrew astronaut andrew s thomas crew member space ksc crew members space shuttle images of american flag sts 91 flight crew sts 91 mission commander charles mir program manager frank culbertson international space station program sts 91 crew member sts 91 mission sts 91 crew shuttle mission mission specialists wendy earth edt ksc astronauts nasa