visibility Similar

code Related

KENNEDY SPACE CENTER, Fla. -- STS-88 Mission Commander Robert D. Cabana (left) and Pilot Frederick W. "Rick" Sturckow (right) examine part of the emergency egress system at Launch Pad 39A, during Terminal Countdown Demonstration Test (TCDT) activities. Standing between them is an unidentified KSC worker. The crew are at KSC to participate in the Terminal Countdown Demonstration Test (TCDT), a dress rehearsal for launch. Mission STS-88 is targeted for launch on Dec. 3, 1998. It is the first U.S. flight for the assembly of the International Space Station and will carry the Unity connecting module. Unity will be mated with the already orbiting Russian-built Zarya control module. The 12-day mission includes three planned spacewalks to connect power, data and utility lines and install exterior equipment KSC-98pc1523

KENNEDY SPACE CENTER, Fla. -- On Launch Pad 39A, the STS-88 crew pose after successfully completing a pre-launch countdown exercise as part of Terminal Countdown Demonstration Test. From left, they are Mission Specialist James H. Newman, Pilot Frederick W. "Rick" Sturckow, Mission Commander Robert D. Cabana, and Mission Specialists Nancy J. Currie, Ph.D., Jerry L. Ross and Sergei Konstantinovich Krikalev, a Russian cosmonaut. Mission STS-88 is targeted for launch on Dec. 3, 1998. It is the first U.S. flight for the assembly of the International Space Station and will carry the Unity connecting module. Unity will be mated with the already orbiting Russian-built Zarya control module. The 12-day mission includes three planned spacewalks to connect power, data and utility lines and install exterior equipment KSC-98pc1544

KENNEDY SPACE CENTER, Fla. -- STS-88 Mission Specialists Sergei Konstantinovich Krikalev (left) and James H. Newman (right) are ready to leave Launch Pad 39A in the slidewire basket during an emergency egress exercise. The crew are at KSC to participate in the Terminal Countdown Demonstration Test (TCDT) which includes mission familiarization activities, emergency egress training, and the simulated main engine cut-off exercise. Mission STS-88 is targeted for launch on Dec. 3, 1998. It is the first U.S. flight for the assembly of the International Space Station and will carry the Unity connecting module. Unity will be mated with the already orbiting Russian-built Zarya control module. The 12-day mission includes three planned spacewalks to connect power, data and utility lines and install exterior equipment KSC-98pc1537

KENNEDY SPACE CENTER, Fla. -- STS-88 Mission Specialists James H. Newman (left) and Sergei Konstantinovich Krikalev (right) hurry toward the slidewire basket at the 195-foot level of Launch Pad 39A during an emergency egress exercise. The crew are at KSC to participate in the Terminal Countdown Demonstration Test (TCDT) which includes mission familiarization activities, emergency egress training, and the simulated main engine cut-off exercise. Mission STS-88 is targeted for launch on Dec. 3, 1998. It is the first U.S. flight for the assembly of the International Space Station and will carry the Unity connecting module. Unity will be mated with the already orbiting Russian-built Zarya control module. The 12-day mission includes three planned spacewalks to connect power, data and utility lines and install exterior equipment KSC-98pc1536

KENNEDY SPACE CENTER, Fla. -- STS-88 Mission Specialists Sergei Konstantinovich Krikalev (left) and James H. Newman (right) are ready to leave Launch Pad 39A in the slidewire basket during an emergency egress exercise. The crew are at KSC to participate in the Terminal Countdown Demonstration Test (TCDT) which includes mission familiarization activities, emergency egress training, and the simulated main engine cut-off exercise. Mission STS-88 is targeted for launch on Dec. 3, 1998. It is the first U.S. flight for the assembly of the International Space Station and will carry the Unity connecting module. Unity will be mated with the already orbiting Russian-built Zarya control module. The 12-day mission includes three planned spacewalks to connect power, data and utility lines and install exterior equipment KSC-98pc1540

KENNEDY SPACE CENTER, Fla. -- STS-88 Mission Specialist Jerry L. Ross (left) climbs into slideware basket behind Mission Specialist Nancy Jane Currie, Ph.D., (right) at Launch Pad 39A as part of an emergency egress exercise. The crew are at KSC to participate in the Terminal Countdown Demonstration Test (TCDT) which includes mission familiarization activities, emergency egress training, and the simulated main engine cut-off exercise. Mission STS-88 is targeted for launch on Dec. 3, 1998. It is the first U.S. flight for the assembly of the International Space Station and will carry the Unity connecting module. Unity will be mated with the already orbiting Russian-built Zarya control module. The 12-day mission includes three planned spacewalks to connect power, data and utility lines and install exterior equipment KSC-98pc1538

KENNEDY SPACE CENTER, Fla. -- The STS-88 crew get instruction from Ken Clark, at right, a training instructor with United Space Alliance (USA), on emergency egress procedures from launch pad 39A. From left, they are Mission Specialists Jerry L. Ross, Nancy J. Currie, James H. Newman and Sergei Krikalev, a Russian cosmonaut, Pilot Frederick W. "Rick" Sturckow, and Mission Commander Robert D. Cabana. The crew are at KSC to participate in the Terminal Countdown Demonstration Test (TCDT), a dress rehearsal for launch. Mission STS-88 is targeted for launch on Dec. 3, 1998. It is the first U.S. flight for the assembly of the International Space Station and will carry the Unity connecting module KSC-98pc1519

KENNEDY SPACE CENTER, Fla. -- As part of Terminal Countdown Demonstration Test (TCDT) activities, STS-101 Mission Specialist Jeffrey N. Williams takes the driver seat in an M-113 personnel carrier during emergency egress training at Launch pad 39A. The TCDT also includes a simulated launch countdown and familiarization with the payload. Other crew members taking part are Commander James D. Halsell Jr., Pilot Scott J. "Doc" Horowitz and Mission Specialists Mary Ellen Weber James Voss, Susan Helms, and Yury Usachev of Russia. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A KSC00pp0464

KENNEDY SPACE CENTER, Fla. -- The Space Shuttle Endeavour blazes through the night sky as it begins the first U.S. mission, STS-88, dedicated to the assembly of the International Space Station. Liftoff on Dec. 4 from Launch Pad 39A was at 3:35:34 a.m. EST. During the nearly 12-day mission, the six-member crew will mate in space the first two elements of the International Space Station the already-orbiting Zarya control module with the Unity connecting module carried by Endeavour. Crew members are Commander Robert D. Cabana, Pilot Frederick W. "Rick" Sturckow, and Mission Specialists Nancy J. Currie, Jerry L. Ross, James H. Newman and Sergei Konstantinovich Krikalev, a Russian cosmonaut. This was the second launch attempt for STS-88. The first one on Dec. 3 was scrubbed when launch controllers, following an assessment of a suspect hydraulic system, were unable to resume the countdown clock in time to launch within the remaining launch window KSC-98pc1793

KENNEDY SPACE CENTER, Fla. -- STS-88 Mission Commander Robert D. Cabana (left) and Pilot Frederick W. "Rick" Sturckow (right) are ready to leave Launch Pad 39A in the slidewire basket during an emergency egress exercise. Other crew members watch from behind. The crew are at KSC to participate in the Terminal Countdown Demonstration Test (TCDT) which includes mission familiarization activities, emergency egress training, and the simulated main engine cut-off exercise. Mission STS-88 is targeted for launch on Dec. 3, 1998. It is the first U.S. flight for the assembly of the International Space Station and will carry the Unity connecting module. Unity will be mated with the already orbiting Russian-built Zarya control module. The 12-day mission includes three planned spacewalks to connect power, data and utility lines and install exterior equipment KSC-98pc1539

description

Summary

KENNEDY SPACE CENTER, Fla. -- STS-88 Mission Commander Robert D. Cabana (left) and Pilot Frederick W. "Rick" Sturckow (right) are ready to leave Launch Pad 39A in the slidewire basket during an emergency egress exercise. Other crew members watch from behind. The crew are at KSC to participate in the Terminal Countdown Demonstration Test (TCDT) which includes mission familiarization activities, emergency egress training, and the simulated main engine cut-off exercise. Mission STS-88 is targeted for launch on Dec. 3, 1998. It is the first U.S. flight for the assembly of the International Space Station and will carry the Unity connecting module. Unity will be mated with the already orbiting Russian-built Zarya control module. The 12-day mission includes three planned spacewalks to connect power, data and utility lines and install exterior equipment

Nothing Found.

label_outline

Tags

kennedy space center sts commander robert mission commander robert d cabana pilot frederick pilot frederick w rick sturckow launch pad slidewire basket slidewire basket emergency egress exercise emergency egress exercise other other crew members terminal countdown terminal countdown demonstration test tcdt familiarization activities mission familiarization activities emergency egress engine mission sts first u international space station unity module zarya control russian built zarya control module spacewalks power utility lines utility lines equipment equipment ksc crew members sts 88 mission commander robert mission sts 88 mission pilot frederick crew fla ksc dec flight data astronauts nasa
date_range

Date

06/11/1998
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Emergency Egress Exercise, Equipment Ksc, Mission Commander Robert D

51B-13-011 - STS-51B - Cleaning

STS105-308-006 - STS-105 - Sturckow with camera in the middeck

Severe Storm ^ Winter Storm - East Hartford, Conn. , November 3, 2011 -- Members of the Connecticut National Guard work with FEMA to provide drinking water and meals-ready-to-eat to residents recovering from the effects of an October severe storm that dumped snow in many parts of the state, downing trees and utility lines. FEMA is providing emergency protective measures including direct Federal assistance. Photo by Norman Lenburg/FEMA

STS105-305-009 - STS-105 - Barry and Forrester suited in EMUs in preparation for EVA, Sturckow in view

KENNEDY SPACE CENTER, FLA. -- Workers in the Space Station Processing Facility prepare the hatch of the Unity connecting module for closure before its launch aboard Space Shuttle Endeavour on STS-88 in December. Unity will now undergo a series of leak checks before a final purge of clean, dry air inside the module to ready it for initial operations in space. Other testing includes the common berthing mechanism to which other space station elements will dock and the Pad Demonstration Test to verify the compatibility of the module with the Space Shuttle as well as the ability of the astronauts to send and receive commands to Unity from the flight deck of the orbiter. The next time the hatch will be opened it will be by astronauts on orbit. Unity is expected to be ready for installation into the payload canister on Oct. 25, and transported to Launch Pad 39-A on Oct. 27. The Unity will be mated to the Russian-built Zarya control module which should already be in orbit at that time KSC-98pc1125

Severe Storm ^ Winter Storm - Windsor, Conn. , Nov. 19, 2011 -- Contractor crews unload "green waste" at a debris reduction site here. FEMA is assisting Connecticut residents recover from the aftermath of an unusual October snowstorm that downed trees and utility lines. Photo by Norman Lenburg/FEMA

STS088-352-026 - STS-088 - Ross holding slidewire while working on FGB/Zarya module during EVA 3

Video security: route from cabin to cave, Jewel Cave, 2007

51B-101-023 - STS-51B - 51B crew portraits

KENNEDY SPACE CENTER, FLA. -- STS-107 Mission Specialist Laurel Clark arrives at KSC to take part in Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. Other crew members are Commander Rick Husband, Pilot William "Willie" McCool, Payload Commander Michael Anderson, Mission Specialists Kalpana Chawla and David Brown, and Payload Specialist Ilan Ramon, the first Israeli astronaut. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is scheduled for Jan. 16, 2003. KSC-02pd1922

KENNEDY SPACE CENTER, FLA. -- STS-101 Mission Specialist Susan J. Helms adjusts her helmet after climbing into her seat inside Space Shuttle Atlantis for a simulated launch countdown. The countdown is part of Terminal Countdown Demonstration Test (TCDT) activities that also include emergency egress training and familiarization with the payload. Other crew members taking part are Commander James D. Halsell Jr., Pilot Scott J. "Doc" Horowitz and Mission Specialists Mary Ellen Weber, James Voss, Jeffrey N. Williams, and Yury Usachev of Russia. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A KSC00pp0473

STS105-305-008 - STS-105 - Barry and Forrester suited in EMUs in preparation for EVA, Sturckow in view

Topics

kennedy space center sts commander robert mission commander robert d cabana pilot frederick pilot frederick w rick sturckow launch pad slidewire basket slidewire basket emergency egress exercise emergency egress exercise other other crew members terminal countdown terminal countdown demonstration test tcdt familiarization activities mission familiarization activities emergency egress engine mission sts first u international space station unity module zarya control russian built zarya control module spacewalks power utility lines utility lines equipment equipment ksc crew members sts 88 mission commander robert mission sts 88 mission pilot frederick crew fla ksc dec flight data astronauts nasa