visibility Similar

Crew members of an M551 Sheridan tank modified to look like a Soviet tank watch the sky and road for signs of the enemy. The tanks are being used by the 177th Armored Brigade in their role as opposing forces during field exercises at the National Training Center

The 30mm Stryker Infantry Carrier Vehicle - Dragoon

190610-N-LN093-1050 SANTA RITA, Guam (June 10, 2019)

Soldiers and elements from the 469th Combat Sustainment

KENNEDY SPACE CENTER, FLA. -- STS-113 Mission Commander James Wetherbee practices driving an M-113 armored personnel carrier, part of emergency egress training during Terminal Countdown Demonstration Test activities. He and the rest of the crew are preparing for the mission aboard Space Shuttle Endeavour, which is scheduled to launch Nov. 10. The TCDT includes a launch countdown. The primary payloads on mission STS-113 are the first port truss segment, P1, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. Also onboard Space Shuttle Endeavour will be the Expedition 6 crew who will replace Expedition 5, returning to Earth after 4 months. KSC-02pd1547

An Heavy Expanded Mobility Tactical Truck, one of the, Flanders

Marines with 3rd Marine Division, III Marine Expeditionary

KENNEDY SPACE CENTER, FLA. -- STS-122 Mission Specialist Hans Schlegel, of the European Space Agency, in front, practices driving an M-113 armored personnel carrier as the instructor, to his left, monitors his performance. STS-122 Mission Specialist Rex Walheim, at right, enjoys the ride in back. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3346

U.S. Soldiers, assigned to 1st Battalion, 6th Field

code Related

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Discovery's STS-133 mission go for a ride in an M-113 armored personnel carrier with Battalion Chief David Seymour. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and training on the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5112

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Discovery's STS-133 mission go for a ride in an M-113 armored personnel carrier with Battalion Chief David Seymour. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and training on the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5117

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Discovery's STS-133 mission go for a ride in an M-113 armored personnel carrier with Battalion Chief David Seymour. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and training on the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5107

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Discovery's STS-133 mission go for a ride in an M-113 armored personnel carrier with Battalion Chief David Seymour. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and training on the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5114

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the STS-133 crew shares a light moment with Battalion Chief David Seymour, left, during training on the M-113 armored personnel carrier. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and driving the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5103

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 Pilot Eric Boe prepares to practice driving an M-113 armored personnel carrier. Behind him is Commander Steve Lindsey. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and training on the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5111

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 Mission Commander Steve Lindsey points out his crew's mission patch on an M-113 armored personnel carrier. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and driving the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5118

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 Commander Steve Lindsey prepares to practice driving an M-113 armored personnel carrier. Behind him, from left are Mission Specialists Michael Barratt and Alvin Drew, Pilot Eric Boe, and Mission Specialists Tim Kopra and Nicole Stott. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and training on the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5110

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 Commander Steve Lindsey prepares to drive the M-113 armored personnel carrier. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and training on the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5104

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Discovery's STS-133 mission go for a ride in an M-113 armored personnel carrier with Battalion Chief David Seymour. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and training on the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5109

description

Summary

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Discovery's STS-133 mission go for a ride in an M-113 armored personnel carrier with Battalion Chief David Seymour. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and training on the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

iss national lab r 2 pmm kennedy space center cape canaveral crew members discovery space shuttle discovery sts ride personnel carrier personnel carrier battalion chief david seymour battalion chief david seymour foot launch pad case emergency egress emergency egress vicinity terminal countdown terminal countdown demonstration test tcdt shuttle crew team opportunity activities equipment familiarization equipment familiarization launch countdown module supplies robonaut dexterous humanoid astronaut helper dexterous humanoid astronaut helper international space station space shuttle high resolution military vehicles nasa car
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Battalion Chief David Seymour, Iss National Lab R 2 Pmm, Launch Countdown

NASA Tweeps With Robonaut-2. NASA public domain image. Kennedy space center.

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center STS-133 Mission Specialist Michael Barratt practices releasing a slidewire basket as part of the Terminal Countdown Demonstration Test (TCDT) pad emergency exit training. TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5163

CAPE CANAVERAL, Fla. -- On Launch Pad 39A, preparations are under way to move the pad's rotating service structure away from space shuttle Discovery as the sun sets over NASA's Kennedy Space Center in Florida. The structure provides weather protection and access to the shuttle while it awaits lift off on the pad. RSS "rollback," as it's called, is a significant milestone in the launch countdown. Launch of Discovery on the STS-133 mission to the International Space Station is set for 3:29 p.m. on Nov. 4. During the 11-day mission, Discovery and its six crew members will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, to the orbiting laboratory. Discovery, which will fly its 39th mission, is scheduled to be retired following STS-133. This will be the 133rd Space Shuttle Program mission and the 35th shuttle voyage to the space station. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5462

KENNEDY SPACE CENTER, FLA. -- Expedition 6 crew member Nikolai Budarin smiles during fit check of his helmet, part of Terminal Countdown Demonstration Test activities. He and the rest of the crew are preparing for the mission aboard Space Shuttle Endeavour, which is scheduled to launch Nov. 10. The TCDT includes emergency egress training and a launch countdown. The Expedition 6 crew will travel on Space Shuttle Endeavour to the International Space Station to replace Expedition 5, returning to Earth after 4 months. The primary payloads on mission STS-113 are the first port truss segment, P1, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. Launch is scheduled for Nov. 10, 2002. KSC-02pd1569

KENNEDY SPACE CENTER, FLA. -- Expedition 6 crew member Donald Pettit concentrates on driving an M-113 armored personnel carrier during emergency egress training at the pad. The crew is preparing for the mission aboard Space Shuttle Endeavour, which is scheduled to launch Nov. 10, by taking part in Terminal Countdown Demonstration Test activities. The TCDT includes a simulated launch countdown.. The Expedition 6 crew will travel on Space Shuttle Endeavour to the International Space Station to replace Expedition 5, returning to Earth after 4 months. The primary payloads on mission STS-113 are the first port truss segment, P1, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. Launch is scheduled for Nov. 10, 2002. KSC-02pd1559

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-130 Mission Specialist Nicholas Patrick takes his crew and instructor for a ride in an M113 armored personnel carrier during driving practice. Left of Patrick is the instructor, Battalion Chief David Seymour. An M113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed. The crew members of space shuttle Endeavour's STS-130 mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test. The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top. Endeavour's launch is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html. Photo credit: NASA/Kim Shiflett KSC-2010-1303

The STS-85 mission crew members pose in front of their T-38 jet trainers after they arrived at KSC’s Shuttle Landing Facility from NASA’s Johnson Space Center to begin Terminal Countdown Demonstration Test (TCDT) activities for that mission. The TCDT includes a dress rehearsal of the launch countdown. They are (front row, from left): Mission Specialist Stephen K. Robinson; Payload Commander N. Jan Davis; Mission Specialist Robert L. Curbeam, Jr.; Commander Curtis L. Brown, Jr.; Pilot Kent V. Rominger; and Payload Specialist Bjarni V. Tryggvason. The STS-85 mission is now targeted for Aug. 7. The primary payload aboard the Space Shuttle orbiter Discovery is the Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-2 (CRISTA-SPAS-2). Other STS-85 payloads include the Manipulator Flight Demonstration (MFD), and Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker-2 (IEH-2) experiments KSC-97PC1073

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery's STS-133 Mission Specialist Steve Bowen arrives on the Shuttle Landing Facility runway aboard a T-38 jet. In the days leading up to their launch to the International Space Station, Bowen and his crew members will check the fit of their launch-and-entry suits, review launch-day procedures, receive weather briefings and remain medically quarantined to prevent sickness. Bowen replaces astronaut Tim Kopra, who was injured in a bicycle accident in January 2011. This will be the second launch attempt for Discovery's crew, following a scrub in November 2010 due to a hydrogen gas leak at the ground umbilical carrier plate (GUCP) as well as modifications to the external fuel tank's intertank support beams, called stringers. Scheduled to lift off Feb. 24 at 4:50 p.m. EST, Discovery and its crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the orbiting outpost. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2011-1511

JSC2011-E-059636 (21 June 2011) --- NASA astronaut Chris Ferguson, STS-135 commander, participates in safety training in the M113 personnel carrier during the Terminal Countdown Demonstration Test (TCDT) at NASA?s Kennedy Space Center on June 21, 2011. TCDT serves as the prelaunch countdown rehearsal for the final space shuttle mission, which is scheduled for launch on July 8. The M113 would be used in the event of an emergency at the pad forcing the crew to evacuate. Photo credit: NASA Photo/Houston Chronicle, Smiley N. Pool STS_135_ M113

CAPE CANAVERAL, Fla. -- Battalion Chief David Seymour and space shuttle Atlantis' STS-135 crew members enjoy a light moment as they participate in M113 armored personnel carrier training at NASA's Kennedy Space Center in Florida. From left are Mission Specialist Sandy Magnus, Pilot Doug Hurley, Commander Chris Ferguson (obscured) and Mission Specialist Rex Walheim. An M113 is kept at the foot of the launch pad in case an emergency exit from the launch pad is needed and every shuttle crew is trained on driving the vehicle before launch. The STS-135 crew is at Kennedy to participate in a launch countdown dress rehearsal called the Terminal Countdown Demonstration Test (TCDT) and related training. Atlantis and its crew are targeted to lift off July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4678

KENNEDY SPACE CENTER, FLA. - During a simulated emergency landing of a shuttle crew at NASA Kennedy Space Center's Shuttle Landing Facility, medevac personnel tend to an "injured astronaut" in the helicopter. The astronaut will be taken to an area hospital participating in the simulation. Known as a Mode VI exercise, the operation uses volunteer workers from the Center to pose as astronauts. The purpose of the simulation is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention. Photo credit: NASA/Kim Shiflett KSC-06pd0502

KENNEDY SPACE CENTER, FLA. - In a simulated emergency landing of a shuttle crew at NASA Kennedy Space Center's Shuttle Landing Facility, emergency rescue personnel place an "injured astronaut" onto a stretcher. Known as a Mode VI exercise, the operation uses volunteer workers from the Center to pose as astronauts. The purpose of the simulation is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention. Photo credit: NASA/Kim Shiflett KSC-06pd0491

Topics

iss national lab r 2 pmm kennedy space center cape canaveral crew members discovery space shuttle discovery sts ride personnel carrier personnel carrier battalion chief david seymour battalion chief david seymour foot launch pad case emergency egress emergency egress vicinity terminal countdown terminal countdown demonstration test tcdt shuttle crew team opportunity activities equipment familiarization equipment familiarization launch countdown module supplies robonaut dexterous humanoid astronaut helper dexterous humanoid astronaut helper international space station space shuttle high resolution military vehicles nasa car