visibility Similar

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft / SOLAR PANEL INSTALL

STS084-305-035 - STS-084 - Interior views of the Mir Space Station

S115E07234 - STS-115 - Yeast GAP in the FWD MDDK of the Space Shuttle Atlantis during Expedition 13 / STS-115 Joint Operations

STS086-302-032 - STS-086 - Interior views of the Spacehab module after transfer ops

S126E008518 - STS-126 - WRS RFTA Initialization in US Lab

S84E5085 - STS-084 - Stowage bag and cable in Spacehab

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, workers stand by as the Experiment Logistics Module Pressurized Section, or ELM-PS, is lowered onto the rotation stand. Part of the Japanese Experiment Module, called Kibo, the ELM-PS is the primary payload for space shuttle Endeavour's STS-123 mission, which is targeted for launch to the International Space Station on Feb. 14. Photo credit: NASA/Dimitri Gerondidakis KSC-07pd3475

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, processing of the International Space Station's Node 3, named Tranquility, nears completion. Its cupola, seen in this view, is covered and its hatch secured. Hatch closure follows the completion of preparations for the node's transport to the pad and is a significant milestone in launch processing activities. The primary payload for the STS-130 mission, Tranquility is a pressurized module that will provide room for many of the space station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top. The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency. Space shuttle Endeavour's STS-130 mission is targeted for launch in early February 2010. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html. Photo credit: NASA/Amanda Diller KSC-2009-6846

STS097-330-016 - STS-097 - View looking through the airlock into the middeck of Endeavout during STS-97

code Related

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the open doors of the payload canister reveal space shuttle Discovery's payload, the integrated truss structure S6 and solar arrays, for the STS-119 mission. The payload will be transferred into the Payload Changeout Room, or PCR. They will be installed in Discovery's payload bay after the shuttle rolls out to the launch pad. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss. Photo credit: NASA/Chris Rhodes KSC-2009-1109

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the doors of the payload canister are opened to transfer the space shuttle Discovery's payload into the Payload Changeout Room, or PCR. The payload for the STS-119 mission comprises the integrated truss structure S6 and solar arrays to be installed on the International Space Station. They will be installed in Discovery's payload bay after the shuttle rolls out to the launch pad. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss. Photo credit: NASA/Chris Rhodes KSC-2009-1107

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the doors of the payload canister are ready to be opened to transfer the space shuttle Discovery's payload into the Payload Changeout Room, or PCR. The payload for the STS-119 mission comprises the integrated truss structure S6 and solar arrays to be installed on the International Space Station. They will be installed in Discovery's payload bay after the shuttle rolls out to the launch pad. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss. Photo credit: NASA/Chris Rhodes KSC-2009-1106

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the integrated truss structure S6 and solar arrays, the STS-119 mission payload, slowly move out of the payload canister into the Payload Changeout Room, or PCR. They will be installed in space shuttle Discovery's payload bay after the shuttle rolls out to the launch pad. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss. Photo credit: NASA/Chris Rhodes KSC-2009-1110

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the integrated truss structure S6 and solar arrays, the STS-119 mission payload, are moved into the Payload Changeout Room, or PCR. They will be installed in space shuttle Discovery's payload bay after the shuttle rolls out to the launch pad. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss. Photo credit: NASA/Chris Rhodes KSC-2009-1111

CAPE CANAVERAL, Fla. -- With red umbilical lines attached, the payload containing space shuttle Discovery's S6 truss and solar arrays is lifted up to the Payload Changeout Room, or PCR, on Launch Pad 39A at NASA's Kennedy Space Center in Florida. The payload will be transferred inside the PCR where it will wait until Discovery rolls out to the pad. Then the payload will be installed in the shuttle's payload bay. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss. Photo credit: NASA/Jim Grossmann KSC-2009-1096

CAPE CANAVERAL, Fla. – In the Payload Changeout Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, the payload for the STS-119 mission is being transferred to space shuttle Discovery's cargo bay. The payload consists of the integrated truss structure S6 and solar arrays. During Discovery's 14-day mission, the shuttle's seven astronauts will install the S6 truss segment and solar arrays to the starboard side of the International Space Station, completing the station's truss, or backbone. Launch of Discovery on the STS-119 mission is targeted for Feb. 12. Photo credit: NASA/Kim Shiflett KSC-2009-1188

CAPE CANAVERAL, Fla. -- The payload canister containing the S6 truss and solar arrays arrives at Launch Pad 39A at NASA's Kennedy Space Center in Florida. The canister sits below the Payload Changeout Room, or PCR. It will be lifted up to the PCR and space shuttle Discovery's payload transferred inside. After Discovery rolls out to the pad, the payload will be installed in the shuttle's payload bay. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss Photo credit: NASA/Jim Grossmann KSC-2009-1094

CAPE CANAVERAL, Fla. -- The payload canister containing the S6 truss and solar arrays arrives at Launch Pad 39A at NASA's Kennedy Space Center in Florida. The canister sits below the Payload Changeout Room, or PCR. It will be lifted up to the PCR and space shuttle Discovery's payload transferred inside. After Discovery rolls out to the pad, the payload will be installed in the shuttle's payload bay. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss Photo credit: NASA/Jim Grossmann KSC-2009-1095

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the doors of the payload canister open to reveal space shuttle Discovery's payload, the integrated truss structure S6 and solar arrays, for the STS-119 mission. The payload will be transferred into the Payload Changeout Room, or PCR. They will be installed in Discovery's payload bay after the shuttle rolls out to the launch pad. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss. Photo credit: NASA/Chris Rhodes KSC-2009-1108

description

Summary

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the doors of the payload canister open to reveal space shuttle Discovery's payload, the integrated truss structure S6 and solar arrays, for the STS-119 mission. The payload will be transferred into the Payload Changeout Room, or PCR. They will be installed in Discovery's payload bay after the shuttle rolls out to the launch pad. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss. Photo credit: NASA/Chris Rhodes

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

its s 6 pcr pc kennedy space center cape canaveral launch pad doors payload canister payload canister discovery space shuttle discovery truss truss structure s arrays sts room payload changeout room pcr bay payload bay rolls shuttle rolls crew segment truss segment starboard starboard side station backbone chris rhodes space shuttle nasa
date_range

Date

12/01/2009
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Shuttle Rolls, Truss Structure S, Pcr

Glass pendant in the form of a bird

S114E6204 - STS-114 - Starboard side of the P6 truss

KENNEDY SPACE CENTER, Fla. -- The payload canister arrives at the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be lifted up into the Payload Changeout Room near the top of the RSS for transfer to the payload bay of Shuttle Atlantis for mission STS-106. The PCR provides an environmentally controlled facility for the transfer. The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. Atlantis is scheduled to launch Sept. 8 at 8:31 a.m. EDT. KSC-00pp1116

Shipyard workers position a close-in weapons system (CIWS) sponson for installation on the starboard side of the aircraft carrier USS Dwight D. Eisenhower (CVN 69).

KENNEDY SPACE CENTER, Fla. -- Workers in the payload changeout room on Launch Pad 39A keep watch as they move the Multi-Purpose Logistics Module Leonardo out of the payload canister. The MPLM is the primary payload on mission STS-105 to the International Space Station. The mission includes a crew changeover on the Space Station. Expedition Three will be traveling on Discovery to replace Expedition Two, who will return to Earth on board Discovery. Launch of STS-105 is scheduled for Aug. 9 KSC-01pp1392

KENNEDY SPACE CENTER, FLA. - Workers inside the payload canister watch the S1 Integrated Truss Structure as it is lowered toward them. The canister will transport the truss to Atlantis. The first starboard truss segment, the S1 will be attached to the Central truss segment, the S0 Truss, on the International Space Station during mission STS-112. Atlantis is scheduled to launch no earlier than Oct. 2. KSC-02pd1222

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the payload canister, at left, is lifted from its transporter toward the payload changeout room in the rotating service structure. The canister carries a cargo of four carriers holding various equipment for the STS-125 mission aboard space shuttle Atlantis to service NASA’s Hubble Space Telescope. Atlantis is seen at right, atop the mobile launcher platform. The two tail service masts flank the engines in front of the wings. At the pad, the cargo will be moved into the Payload Changeout Room. The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the shuttle’s payload bay. Launch of Atlantis is targeted for Oct. 10. Photo credit: NASA/Troy Cryder KSC-08pd2786

Conversion. Copper and brass processing. Large rolls of sheet brass and copper ready for the slitting machine, where the roll edges will be trimmed off. These unfinished rolls will all be slit into even-edged, uniform width rolls. Chase Copper and Brass Company, Euclid, Ohio

The battleship USS IOWA (BB-61) fires its 16-inch 50-cal. guns off the starboard side during Operation Unitas XXV

STS097-375-011 - STS-097 - MS Tanner installs SASA on the P6 Truss during second EVA of STS-97

KENNEDY SPACE CENTER, FLA. -- Workers in the Space Station Processing Facility prepare the hatch of the Unity connecting module for closure before its launch aboard Space Shuttle Endeavour on STS-88 in December. Unity will now undergo a series of leak checks before a final purge of clean, dry air inside the module to ready it for initial operations in space. Other testing includes the common berthing mechanism to which other space station elements will dock and the Pad Demonstration Test to verify the compatibility of the module with the Space Shuttle as well as the ability of the astronauts to send and receive commands to Unity from the flight deck of the orbiter. The next time the hatch will be opened it will be by astronauts on orbit. Unity is expected to be ready for installation into the payload canister on Oct. 25, and transported to Launch Pad 39-A on Oct. 27. The Unity will be mated to the Russian-built Zarya control module which should already be in orbit at that time KSC-98pc1125

Inside the Payload Changeout Room (PCR), workers prepare to move the Integrated Truss Structure Z1 out of the payload canister. Once inside the PCR, workers will get ready to move the Z1 into the payload bay of Space Shuttle Discovery. The Z1 truss is the first of 10 that will become the backbone of the International Space Station, eventually stretching the length of a football field. Along with its companion payload, the third Pressurized Mating Adapter, the Z1 is scheduled to be launched aboard Discovery Oct. 5 at 9:38 p.m. EDT KSC-00pp1358

Topics

its s 6 pcr pc kennedy space center cape canaveral launch pad doors payload canister payload canister discovery space shuttle discovery truss truss structure s arrays sts room payload changeout room pcr bay payload bay rolls shuttle rolls crew segment truss segment starboard starboard side station backbone chris rhodes space shuttle nasa