visibility Similar

Visit to Glenn Research Center by the Associate Administrator for Science Mission Directorate

KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, STS-102 Mission Specialist Andrew S.W. Thomas practices using a tool on the Integrated Cargo Carrier. Watching him, at left, is Susan Helms, part of the Expedition Two crew heading for the International Space Station on the flight. Behind Helms (at left) is Pilot James M. Kelly. They and other crew members are at SPACEHAB to get acquainted with tools and equipment they will be using on their mission. STS-102 is the 8th construction flight to the International Space Station and will carry the Multi-Purpose Logistics Module Leonardo. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module Destiny. The mission will also be carrying the Expedition Two crew to the Space Station, replacing the Expedition One crew who will return on Shuttle Discovery. STS-102 is scheduled for launch March 8, 2001 KSC01pp0204

Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV

Robotics Laboratory: Spectrometer w/Charles Gray ARC-1992-AC92-0040-1

Borrning i metall vid Trafikaktiebolaget Grängesberg - Oxelösunds Järnväg, TGOJ:s verkstad, Eskilstuna.

They Train To Be Cooks- Cookery Classes at the National Training College of Domestic Science, Westminster, London, England, UK, 1944 D22526

Ralph Rexinger, and Joaquim H. Brits starting to eat while Olaf Andersen cooking at stove / World Telegram photo by Dick De Marsico.

3 MODELS IN FACILITY - A FRAME - THRUSTER SYSTEM J MODEL

Frimurarerestaurangens kök år 1937. Värmlands Sverige

code Related

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 crew members get hands-on familiarization with equipment to be used on the mission. They are looking at the hoist of one of two Japanese Aerospace Exploration Agency's Visual Equipments, or VE. These are used to support on-orbit cameras. The visual equipment flies on top of the Japanese Experiment Module External Facility, or JEM-EF, and will be installed on orbit to the outer perimeter of the EF. The view is the hoist from the top of the EF. The mission payload includes the Japanese Experiment Module, or JEM, Extended Facility and the Inter-orbit Communication System Extended Facility, or ICS-EF. Equipment familiarization is part of a Crew Equipment Interface Test. The payload will be launched to the International Space Station aboard the space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Kim Shiflett KSC-08pd3227

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 mission crew members inspect the installation of the Japanese Aerospace Exploration Agency's Visual Equipments, or VE, to its final spot since they will have to do this as part of an EVA on the mission. The VE has to be installed to the final position on orbit because it is outside of the payload bay envelope. The mission payload includes the Japanese Experiment Module, or JEM, Extended Facility and the Inter-orbit Communication System Extended Facility, or ICS-EF. Equipment familiarization is part of a Crew Equipment Interface Test. The payload will be launched to the International Space Station aboard the space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Kim Shiflett KSC-08pd3231

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 mission crew members inspect the installation of the Japanese Aerospace Exploration Agency's Visual Equipments, or VE, to its final spot since they will have to do this as part of an EVA on the mission. The VE has to be installed to the final position on orbit because it is outside of the payload bay envelope. The mission payload includes the Japanese Experiment Module, or JEM, Extended Facility and the Inter-orbit Communication System Extended Facility, or ICS-EF. Equipment familiarization is part of a Crew Equipment Interface Test. The payload will be launched to the International Space Station aboard the space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Kim Shiflett KSC-08pd3230

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 crew members get a close look at equipment for their mission, which will install final components of the Japanese Aerospace Exploration Agency’s Japanese Experiment Module, or JEM. Equipment familiarization is part of a Crew Equipment Interface Test. The JEM components include the Inter Orbit Communication System Extended Facility, or ICS-EF, the Extended Facility and Experiment Logistics Module-Exposed Section. The payload will launch aboard space shuttle Endeavour targeted for May 15, 2009. Photo credit: NASA/Kim Shiflett KSC-08pd3000

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-127 crew members get a close look at the payload in space shuttle Endeavour's payload bay. At right is Mission Specialist Dave Wolf. The payload includes the Japanese Experiment Module's Exposed Facility, or JEM-EF, and the Experiment Logistics Module-Exposed Section, or ELM-ES. The astronauts are at Kennedy to prepare for launch through Terminal Countdown Demonstration Test activities. The TCDT includes equipment familiarization and a simulated launch countdown. Endeavour's STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex on the International Space Station. Endeavour's launch is targeted for June 13. Photo credit: NASA/Kim Shiflett KSC-2009-3475

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 mission crew members get hands-on familiarization with equipment to be used on the mission. Crew members are Commander Mark Polansky, Pilot Doug Hurley and Mission Specialists Christopher Cassidy, Tom Marshburn, Dave Wolf, Julie Payette and Tim Kopra. The mission payload includes the Japanese Experiment Module, or JEM, Extended Facility and the Inter-orbit Communication System Extended Facility, or ICS-EF. Equipment familiarization is part of a Crew Equipment Interface Test. The payload will be launched to the International Space Station aboard the space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Kim Shiflett KSC-08pd3224

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 mission crew members get hands-on familiarization with equipment to be used on the mission. Crew members are Commander Mark Polansky, Pilot Doug Hurley and Mission Specialists Christopher Cassidy, Tom Marshburn, Dave Wolf, Julie Payette and Tim Kopra. The mission payload includes the Japanese Experiment Module, or JEM, Extended Facility and the Inter-orbit Communication System Extended Facility, or ICS-EF. Equipment familiarization is part of a Crew Equipment Interface Test. The payload will be launched to the International Space Station aboard the space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Kim Shiflett KSC-08pd3226

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 Mission Specialist Tim Kopra and Tom Marshburn get a close look at equipment for their mission, which will install final components of the Japanese Aerospace Exploration Agency’s Japanese Experiment Module. Equipment familiarization is part of a Crew Equipment Interface Test. The JEM components include the Inter Orbit Communication System Extended Facility, or ICS-EF, the Extended Facility and Experiment Logistics Module-Exposed Section. The payload will launch aboard space shuttle Endeavour targeted for May 15, 2009. Photo credit: NASA/Kim Shiflett KSC-08pd3001

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 3 at NASA's Kennedy Space Center in Florida, members of space shuttle Discovery's STS-131 crew participate in training activities during the Crew Equipment Interface Test, or CEIT, for their mission. Here, Mission Specialist Naoko Yamazaki of the Japan Aerospace Exploration Agency, at right, receives assistance fastening a harness. The CEIT provides the crew with hands-on training and observation of shuttle and flight hardware. The seven-member crew will deliver the multi-purpose logistics module Leonardo, filled with resupply stowage platforms and racks to be transferred to locations around the International Space Station. Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. Discovery's launch is targeted for March 18. For information on the STS-131 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html. Photo credit: NASA/Kim Shiflett KSC-2010-1125

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 crew members get hands-on familiarization with equipment to be used on the mission. They are looking at the hoist of one of two Japanese Aerospace Exploration Agency's Visual Equipments, or VE. The photo shows the hoist of the VE to its final position on the outer perimeter of the Japanese Experiment Module External Facility, or JEM-EF. The VE has to be installed to the final position on orbit because it is outside of the payload bay envelope. The mission payload includes the Japanese Experiment Module, or JEM, Extended Facility and the Inter-orbit Communication System Extended Facility, or ICS-EF. Equipment familiarization is part of a Crew Equipment Interface Test. The payload will be launched to the International Space Station aboard the space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Kim Shiflett KSC-08pd3228

description

Summary

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, STS-127 crew members get hands-on familiarization with equipment to be used on the mission. They are looking at the hoist of one of two Japanese Aerospace Exploration Agency's Visual Equipments, or VE. The photo shows the hoist of the VE to its final position on the outer perimeter of the Japanese Experiment Module External Facility, or JEM-EF. The VE has to be installed to the final position on orbit because it is outside of the payload bay envelope. The mission payload includes the Japanese Experiment Module, or JEM, Extended Facility and the Inter-orbit Communication System Extended Facility, or ICS-EF. Equipment familiarization is part of a Crew Equipment Interface Test. The payload will be launched to the International Space Station aboard the space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

jem ef ics ef kennedy space center cape canaveral sts crew members familiarization equipment hoist aerospace exploration aerospace exploration agency visual equipments visual equipments perimeter japanese experiment module japanese experiment module jem ef orbit payload bay envelope payload bay envelope mission payload jem inter orbit communication system inter orbit communication system ics ef equipment familiarization interface test crew equipment interface test international space station endeavour space shuttle endeavour space shuttle high resolution nasa
date_range

Date

16/10/2008
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Jem Ef Ics Ef, Equipments, Inter Orbit Communication System

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Russian foot restraint, equipment that will be part of the payload on their mission to the International Space Station. Around the table are Mission Specialist Yuri I. Malenchenko (back to camera), a SPACEHAB worker, and Mission Specialists Daniel C. Burbank (at end of table) and Edward T. Lu (right). Others at KSC for the CEIT are Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Boris V. Morukov and Richard A. Mastracchio. Malenchenko and Morukov represent the Russian Aviation and Space Agency. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0961

[OEEC Delegates at "Visual Aids in Agriculture" Conference]

KENNEDY SPACE CENTER, FLA. -- James Stickley and Kristin Rumpf, both with United Space Alliance - Main Propulsion System Engineering, discuss procedures about welding the minute cracks on Endeavour's flow liners. Endeavour is scheduled to fly on mission STS-113 in November. The mission payload is the P1 Integrated Truss Structure, the first portside truss to go to the International Space Station, and will be attached to the central truss segment, S0, on the Station. Also additional cooling radiators will be delivered but will remain stowed until flight 12A.1. KSC-02pd1204

[Unidentified soldier in kepi with letter and envelope]

S47-201-002 - STS-047 - VISUAL STABILITY - STS-47 PS Mohri sets up experiment

Circular. Bureau of ordnance and hydrography. July 7th, 1855. Sir. From the condition in which some of the articles of ordnance equipments and stores, have been landed from vessels returning from cruises, the Bureau, with the approbation of the

[Modern illustrated sheets with pictorial envelope]

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, astronauts are getting first-hand experience with the fluid experiment rack of the Japanese Experiment Module, or JEM, part of the mission payload to the International Space Station. The JEM comprises six components: two research facilities -- the Pressurized Module and Exposed Facility; a Logistics Module attached to each of them; a Remote Manipulator System; and an Inter-Orbit Communication System unit. The various components of JEM will be assembled in space over the course of three Space Shuttle missions. The first of those three missions, STS-123, will carry the Experiment Logistics Module Pressurized Section aboard the Space Shuttle Endeavour, targeted for launch in February 2008. Photo credit: NASA/Jim Grossmann KSC-07pd1175

KENNEDY SPACE CENTER, FLA. -- At the Trident wharf, workers help guide the container with the Experiment Logistics Module Pressurized Section inside toward the dock. The logistics module is part of the Japanese Experiment Module. The logistics module will be transported to the Space Station Processing Facility at NASA's Kennedy Space Center. The Japanese Experiment Module is composed of three segments and is known as Kibo, which means "hope" in Japanese. Kibo consists of six components: two research facilities -- the Pressurized Module and Exposed Facility; a Logistics Module attached to each of them; a Remote Manipulator System; and an Inter-Orbit Communication System unit. Kibo also has a scientific airlock through which experiments are transferred and exposed to the external environment of space. Kibo is Japan's first human space facility and its primary contribution to the station. Kibo will enhance the unique research capabilities of the orbiting complex by providing an additional environment in which astronauts can conduct science experiments. The various components of JEM will be assembled in space over the course of three Space Shuttle missions. The first of those three missions, STS-123, will carry the Experiment Logistics Module Pressurized Section aboard the Space Shuttle Endeavour, targeted for launch in 2007. Photo credit: NASA/Kim Shiflett KSC-07pd0632

STS090-350-024 - STS-090 - VVIS - Pawelczyk and Williams prepare to monitor with Linnehan as subject

Detroit, Michigan. Assembly of Rolls Royce engines at the Packard Motor Car Company. Visual inspection of ignition wiring harness

Tent interior, medium shot, left front view, STAFF Sergeant John P. Schloe, USAF, Visual Information SPECIALIST, 89th Communications Squadron, Andrews Air Force Base, Maryland, deployed to Fort AP Hill, Virginia, trouble shoots a lap top computer, female airman standing behind him, while participating in the Crisis Look 00-03 exercise. During this deployment, wing personnel will be evaluated on Ability to Survive and Operate (ATSO) skills, humanitarian scenarios and base defense

Topics

jem ef ics ef kennedy space center cape canaveral sts crew members familiarization equipment hoist aerospace exploration aerospace exploration agency visual equipments visual equipments perimeter japanese experiment module japanese experiment module jem ef orbit payload bay envelope payload bay envelope mission payload jem inter orbit communication system inter orbit communication system ics ef equipment familiarization interface test crew equipment interface test international space station endeavour space shuttle endeavour space shuttle high resolution nasa