visibility Similar

CAPE CANAVERAL, Fla. -- On Cape Canaveral Air Force Station in Florida, the 197-foot-tall United Launch Alliance Atlas V rocket rolls to the launch pad at Space Launch Complex 41. Atop the rocket is NASA's Mars Science Laboratory (MSL), enclosed in its payload fairing. The rocket began its move from the Vertical Integration Facility at 8 a.m. EST and arrived at the pad at 8:40 a.m. Liftoff is planned during a launch window which extends from 10:02 a.m. to 11:45 a.m. EST on Nov. 26. MSL's components include a car-sized rover, Curiosity, which has 10 science instruments designed to search for signs of life, including methane, and help determine if the gas is from a biological or geological source. For more information, visit http://www.nasa.gov/msl. Photo credit: NASA/Frankie Martin KSC-2011-7910

Apollo 17 - Saturn Apollo Program

Obama Kennedy Space Center Visit

CAPE CANAVERAL, Fla. – Technicians watch as space shuttle Atlantis moves from Orbiter Processing Facility-2 to the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Atlantis will be moved to the Kennedy Space Center Visitor Complex in November where it will be put on public display. Photo credit: NASA/Jim Grossmann KSC-2012-5850

STS-135 - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the Space Shuttle Program's final solid rocket booster assembly -- the right-hand forward -- is being delivered to the transfer aisle of the Vehicle Assembly Building (VAB). The right and left forward assemblies, which are refurbished and processed at Kennedy, are comprised of three components -- nose cap, frustum and forward skirt. Inside the VAB, the boosters will be stacked, then joined to an external fuel tank and space shuttle Atlantis for what currently is planned as the "launch on need," or potential rescue mission, for Endeavour's STS-134 mission to the International Space Station targeted to launch in February, 2011. Photo credit: NASA/Jim Grossmann KSC-2010-4931

KENNEDY SPACE CENTER, FLA. - Flaming rockets propel Space Shuttle Atlantis into the sky, blocking the sun, for a rendezvous with the International Space Station on mission STS-115. Appearing below the main engine nozzles s are the blue mach diamonds signal the speed and force at which Atlantis roars into space. Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC KSC-06pp2145

STS-127 - LAUNCH - Public domain NASA photogrpaph

OA-7 Transport from SSPF to PHSF

code Related

CAPE CANAVERAL, Fla. - Flags are flying high at the gate for Launch Pad 39B at NASA'S Kennedy Space Center after space shuttle Endeavour’s rollout from the Vehicle Assembly Building. First motion out of the VAB was at 11:15 p.m. Sept. 18. At left of the shuttle are the open rotating service structure and the fixed service structure with the 80-foot lightning mast on top. Endeavour completed the 4.2-mile journey to Launch Pad 39B on Sept. 19 at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2680

CAPE CANAVERAL, Fla. - Space shuttle Endeavour is viewed from the air on Launch Pad 39B after the rollout from the Vehicle Assembly Building at NASA's Kennedy Space Center. At left of the shuttle is the open rotating service structure and the fixed service structure with the 80-foot lightning mast on top. First motion out of the Vehicle Assembly Building was at 11:15 p.m. Sept. 18. Endeavour completed the 4.2-mile journey at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Troy Cryder KSC-08pd2687

CAPE CANAVERAL, Fla. - Space shuttle Endeavour is viewed from the air on Launch Pad 39B after the rollout from the Vehicle Assembly Building at NASA's Kennedy Space Center. To the right of the shuttle is the fixed service structure with the 80-foot lightning mast on top. First motion out of the Vehicle Assembly Building was at 11:15 p.m. Sept. 18. Endeavour completed the 4.2-mile journey at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Troy Cryder KSC-08pd2688

CAPE CANAVERAL, Fla. - Space shuttle Endeavour is viewed from the air on Launch Pad 39B after the rollout from the Vehicle Assembly Building at NASA's Kennedy Space Center. At left of the shuttle is the open rotating service structure and the fixed service structure with the 80-foot lightning mast on top. First motion out of the Vehicle Assembly Building was at 11:15 p.m. Sept. 18. In the background is the Atlantic Ocean. Endeavour completed the 4.2-mile journey at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Troy Cryder KSC-08pd2689

CAPE CANAVERAL, Fla. - The aerial view of Launch Pad 39B at NASA's Kennedy Space Center shows the Atlantic Ocean at right, the Banana River near the pad, and space shuttle Endeavour after its rollout from the Vehicle Assembly Building. At left of the shuttle is the open rotating service structure and the fixed service structure with the 80-foot lightning mast on top. At right is the tower that holds 300,000 gallons of water used for sound suppression on the pad during liftoff. First motion of Endeavour out of the VAB was at 11:15 p.m. Sept. 18. Endeavour completed the 4.2-mile journey at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Troy Cryder KSC-08pd2695

CAPE CANAVERAL, Fla. - Space shuttle Endeavour is hard down on Launch Pad 39B. The shuttle and mobile launcher platform it sits on rest atop the crawler-transporter that carried them from the Vehicle Assembly Building. First motion out of the VAB was at 11:15 p.m. Sept. 18. At left of the shuttle is the open rotating service structure with the payload changeout room revealed. Endeavour completed the 4.2-mile journey to Launch Pad 39B on Sept. 19 at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2675

CAPE CANAVERAL, Fla. - Space shuttle Endeavour is viewed from the air on Launch Pad 39B after the rollout from the Vehicle Assembly Building at NASA's Kennedy Space Center. At left of the shuttle is the open rotating service structure and the fixed service structure with the 80-foot lightning mast on top. First motion out of the Vehicle Assembly Building was at 11:15 p.m. Sept. 18. In the background is the Atlantic Ocean. Endeavour completed the 4.2-mile journey at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Troy Cryder KSC-08pd2691

CAPE CANAVERAL, Fla. - Space shuttle Endeavour is hard down on Launch Pad 39B. The shuttle and mobile launcher platform it sits on rest atop the crawler-transporter that carried them from the Vehicle Assembly Building. First motion out of the VAB was at 11:15 p.m. Sept. 18. At left of the shuttle is the open rotating service structure with the payload changeout room revealed. Endeavour completed the 4.2-mile journey to Launch Pad 39B on Sept. 19 at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2674

CAPE CANAVERAL, Fla. - Shortly before midnight Sept. 18, space shuttle Endeavour leaves the Vehicle Assembly Building at NASA’s Kennedy Space Center, traveling at less than 1 mph atop a massive crawler-transporter. Endeavour sits on the mobile launcher platform with the crawler-transporter underneath. First motion was at 11:15 p.m. Sept. 18. Endeavour completed the 4.2-mile journey to Launch Pad 39B on Sept. 19 at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2662

CAPE CANAVERAL, Fla. - Flags are flying high at the gate for Launch Pad 39B at NASA'S Kennedy Space Center after space shuttle Endeavour’s rollout from the Vehicle Assembly Building. First motion out of the VAB was at 11:15 p.m. Sept. 18. At left of the shuttle are the open rotating service structure and the fixed service structure with the 80-foot lightning mast on top. Endeavour completed the 4.2-mile journey to Launch Pad 39B on Sept. 19 at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2679

description

Summary

CAPE CANAVERAL, Fla. - Flags are flying high at the gate for Launch Pad 39B at NASA'S Kennedy Space Center after space shuttle Endeavour’s rollout from the Vehicle Assembly Building. First motion out of the VAB was at 11:15 p.m. Sept. 18. At left of the shuttle are the open rotating service structure and the fixed service structure with the 80-foot lightning mast on top. Endeavour completed the 4.2-mile journey to Launch Pad 39B on Sept. 19 at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Dimitri Gerondidakis

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

Nothing Found.

label_outline

Tags

kennedy space center cape canaveral flags gate launch pad s kennedy space center endeavour rollout space shuttle endeavour rollout vab service structure mast two shuttles pads launch pads pad b rescue rescue mission atlantis space shuttle atlantis repair repair nasa hubble telescope hubble space telescope duty spacecraft rescue spacecraft sts international space station dimitri gerondidakis space shuttle vehicle assembly building space shuttle on launch pad high resolution flag nasa
date_range

Date

19/09/2008
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Two Shuttles, Repair Nasa, Rescue Spacecraft

CAPE CANAVERAL, Fla. – The first stage ignited on NASA’s Ares I-X test rocket at Launch Pad 39B at NASA's Kennedy Space Center in Florida at 11:30 a.m. EDT on Oct. 28. The rocket produces 2.96 million pounds of thrust at liftoff and reaches a speed of 100 mph in eight seconds. This was the first launch from Kennedy's pads of a vehicle other than the space shuttle since the Apollo Program's Saturn rockets were retired. The parts used to make the Ares I-X booster flew on 30 different shuttle missions ranging from STS-29 in 1989 to STS-106 in 2000. The data returned from more than 700 sensors throughout the rocket will be used to refine the design of future launch vehicles and bring NASA one step closer to reaching its exploration goals. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Sandra Joseph and Kevin O'Connell KSC-2009-5987

PATRICK AIR FORCE BASE, Fla. - 101st Combat Aviation

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis passes the turn basin as it slowly wends its way toward Launch Pad 39A. First motion out of the Vehicle Assembly Building was at 8:19 a.m. The 3.4-mile trip to the pad along the crawlerway will take about 6 hours. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Launch is targeted for March 15. Photo credit: NASA/Ken Thornsley KSC-07pd0390

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the flame trench that serviced the launch of many space shuttles is seen cleared of all debris during deconstruction of Launch Pad 39B. The flame trench will remain as part of the new pad design for the future. Starting in 2009, the structure at Pad B was no longer needed for NASA's Space Shuttle Program, so it is being restructured for future use. The new design will feature a "clean pad" for rockets to come with their own launcher, making it more versatile for a number of vehicles. For information on NASA's future plans, visit www.nasa.gov. Photo credit: NASA/Jim Grossmann KSC-2010-4786

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour is on Launch Pad 39A and ready for prelaunch processing after a nearly 7-hour trip from the Vehicle Assembly Building. First motion out of the VAB was at 8:10 p.m. July 10, and the shuttle was hard down on the pad at 3:02 a.m. July 11. At far left is the rotating service structure, which can be rolled around to enclose the shuttle for access during processing. Behind the shuttle is the fixed service structure, topped by an 80-foot-tall lightning mast. Endeavour is scheduled to launch on mission STS-118 on Aug. 7. During the mission, Endeavour will carry into orbit the S5 truss, SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and will mark the first flight of Mission Specialist Barbara Morgan, the teacher-turned-astronaut whose association with NASA began more than 20 years ago. STS-118 will be the first flight since 2002 for Endeavour, which has undergone extensive modifications, including the addition of safety upgrades already added to orbiters Discovery and Atlantis. Photo credit: NASA/Ken Thornsley KSC-07pd1831

CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, President Jimmy Carter, hand on waist, is briefed on preparations for the first space shuttle launch by center director Lee Scherer. To the left of Carter is NASA Administrator Robert Frosch. Photo Credit: NASA KSC-78PC-0475

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery is visible on Launch Pad 39A before the rotating service structure, which protects it from the elements and provides access to the shuttle, is moved into place. The illusion of the crawler-transporter that carried the spacecraft from the Vehicle Assembly Building to the pad sits outside the perimeter gate. Rollout sets the stage for Discovery's STS-133 crew to practice countdown and launch procedures during the Terminal Countdown Demonstration Test in mid-October. Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. Photo credit: NASA/Jim Grossmann KSC-2010-4756

A "lowboy" transport trailer with the remains of a crashed MH-53J Pave Low IIIE helicopter is placed on the deck of a "lowboy" transport trailer. The bed of the trailer is covered with mattresses and shipping pads to prevent further damage to the helicopter. The helicopter crashed near Camp Mackall Army Air Field, North Carolina on the night of June 2, 1999. Air Force Special Operations Command requested that the aircraft be recovered and returned to Hurlburt Field, Florida

CAPE CANAVERAL, Fla. –– On Launch Pad 39B at NASA's Kennedy Space Center in Florida, space shuttle Endeavour has joined space shuttle Atlantis on Launch Pad 39A. In the background is the Atlantic Ocean. This is probably the final time two shuttles will be on launch pads at the same time with the space shuttle fleet set for retirement in 2010. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service NASA's Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13. Photo credit: NASA/Dimitri Gerondidakis KSC-2009-2769

Aerial, high-angle view of Apollo 10 on Pad B, Launch Complex 39, KSC

The space shuttle Enterprise, mated to an external tank and solid rocket boosters, rests on the launch mount next to the access tower at Space Launch Complex Six. In the background is the mobile service tower and in the left foreground is a portion of the shuttle assembly building

Rollout - Shuttle Discovery - STS 41D Launch - KSC

Topics

kennedy space center cape canaveral flags gate launch pad s kennedy space center endeavour rollout space shuttle endeavour rollout vab service structure mast two shuttles pads launch pads pad b rescue rescue mission atlantis space shuttle atlantis repair repair nasa hubble telescope hubble space telescope duty spacecraft rescue spacecraft sts international space station dimitri gerondidakis space shuttle vehicle assembly building space shuttle on launch pad high resolution flag nasa