visibility Similar

code Related

CAPE CANAVERAL, Fla. – Space shuttle Atlantis is ready to roll out of the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center for transfer to the Vehicle Assembly Building. In the VAB, Atlantis will be attached to its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2475

CAPE CANAVERAL, Fla. – Space shuttle Atlantis rolls out of the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center for transfer to the Vehicle Assembly Building. In the VAB, Atlantis will be attached to its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2476

CAPE CANAVERAL, Fla. – After rolling out of the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center, space shuttle Atlantis rolls to the Vehicle Assembly Building. In the VAB, Atlantis will be attached to its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2479

CAPE CANAVERAL, Fla. – After rolling out of the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center, space shuttle Atlantis rolls to the Vehicle Assembly Building. In the VAB, Atlantis will be attached to its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2480

CAPE CANAVERAL, Fla. – After rolling out of the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center, space shuttle Atlantis begins the short transfer to the Vehicle Assembly Building. In the VAB, Atlantis will be attached to its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2478

CAPE CANAVERAL, Fla. – After rollover from the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center, space shuttle Atlantis arrives in the transfer aisle of the Vehicle Assembly Building. The shuttle arrived in the VAB by 11:05 p.m. EDT. Atlantis will next be attached to its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2482

CAPE CANAVERAL, Fla. – Space shuttle Atlantis rolls into the Vehicle Assembly Building at NASA's Kennedy Space Center. The shuttle arrived in the VAB by 11:05 p.m. EDT. Atlantis will next be attached to its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2481

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, an overhead crane attached to space shuttle Atlantis lifts the shuttle from its transporter. Atlantis will be lifted to vertical for transfer to high bay 3 to be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2486

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, workers detach space shuttle Atlantis from its transporter. An overhead crane will lift Atlantis to vertical for transfer to high bay 3 to be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2484

CAPE CANAVERAL, Fla. – Space shuttle Atlantis rolls out of the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center for transfer to the Vehicle Assembly Building. In the VAB, Atlantis will be attached to its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2477

description

Summary

CAPE CANAVERAL, Fla. – Space shuttle Atlantis rolls out of the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center for transfer to the Vehicle Assembly Building. In the VAB, Atlantis will be attached to its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8. Photo credit: NASA/Jack Pfaller

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center cape canaveral atlantis rolls space shuttle atlantis rolls orbiter bay facility bay transfer vab fuel fuel tank rocket boosters rocket boosters preparations launch pad sts jack pfaller space shuttle vehicle assembly building high resolution astronauts nasa
date_range

Date

22/08/2008
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Space Shuttle Atlantis Rolls, Rolls, Facility Bay

A group of men standing next to a barrel of beer. Office of War Information Photograph

KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility Bay 3, the new orbital boom sensor system is lowered into Discovery’s payload bay. The previous boom was removed for repairs on the manipulator positioning mechanism, the pedestals that hold the boom in place in the payload bay. Discovery is the designated orbiter for the second return-to-flight mission, STS-121. The mission is scheduled no earlier than mid-May. KSC-05pd2609

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Atlantis' main engines and solid rocket boosters ignite on Launch Pad 39A leaving behind a billow of steam as it lifts off on its STS-135 mission to the International Space Station. Atlantis with its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim, lifted off at 11:29 a.m. EDT on July 8, 2011 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tony Gray and Kevin O'Connell KSC-2011-5422

KENNEDY SPACE CENTER, FLA. -- Inside the VAB, orbiter Endeavour is lifted to a vertical position before being mated to the external tank (bottom of photo) and solid rocket boosters in high bay 1. Space Shuttle Endeavour is targeted for launch on mission STS-99 Jan. 13, 2000, at 1:11 p.m. EST. STS-99 is the Shuttle Radar Topography Mission, an international project spearheaded by the National Imagery and Mapping Agency and NASA, with participation of the German Aerospace Center DLR. The SRTM consists of a specially modified radar system that will gather data for the most accurate and complete topographic map of the Earth's surface that has ever been assembled. SRTM will make use of radar interferometry, wherein two radar images are taken from slightly different locations. Differences between these images allow for the calculation of surface elevation, or change. The SRTM hardware will consist of one radar antenna in the shuttle payload bay and a second radar antenna attached to the end of a mast extended 60 meters (195 feet) out from the shuttle KSC-99pp1381

KENNEDY SPACE CENTER, FLA. -- After leaving the Orbiter Processing Facility bay 2, the orbiter Endeavour, atop its transporter, rolls toward the Vehicle Assembly Building. In the VAB, it will be stacked with the external tank and solid rocket boosters atop the mobile launcher platform for its launch on mission STS-118. The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab. Endeavour is targeted for launch on Aug. 7. Photo credit: NASA/Kim Shiflett KSC-07pd1709

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3043

Space Shuttle Challenger, Transfer - STS-13 / 41C

Detroit, Michigan. Assembly of Rolls Royce engines at the Packard motor car company. Dropping engine on a horse before weighing it

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. On board are STS-134 Commander Mark Kelly, Pilot Greg H. Johnson, and Mission Specialists Mike Fincke, Drew Feustel, Greg Chamitoff and the European Space Agency's Roberto Vittori. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Kevin O'Connell KSC-2011-4192

California Shipbuilding Corporation, Richmond, California. Rolls of cable awaiting installation in Liberty vessels at the fitting-out pier

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

CAPE CANAVERAL, Fla. – The Shuttle Carrier Aircraft, or SCA, rolls onto the ramp area at NASA Kennedy Space Center’s Shuttle Landing Facility in Florida. The SCA touched down at 5:05 p.m. EDT to prepare for shuttle Endeavour’s ferry flight to the Los Angeles International Airport on Sept. 17. The Mate/Demate Device, or MDD, is located at the ramp area and will be used to hoist and lower Endeavour onto the back of the SCA. Photo credit: NASA/Kim Shiflett KSC-2012-4958

Topics

kennedy space center cape canaveral atlantis rolls space shuttle atlantis rolls orbiter bay facility bay transfer vab fuel fuel tank rocket boosters rocket boosters preparations launch pad sts jack pfaller space shuttle vehicle assembly building high resolution astronauts nasa