visibility Similar

KENNEDY SPACE CENTER, FLA. - In the transfer aisle of the Vehicle Assembly Building, Atlantis seems to float above the floor as it is suspended by an overhead crane and sling. The orbiter will be raised to a vertical position and then will be lifted into high bay 3 for stacking with the external tank and solid rocket boosters already installed on the mobile launcher platform. After mating with the external tank and boosters, Atlantis will undergo a shuttle interface test and other prelaunch processing. Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Kim Shiflett KSC-06pd1658

An overhead view of the space shuttle Enterprise moving toward the shuttle assembly building at Space Launch Complex Six aboard its specially-designed 76-wheel transporter

Landing - Orbiter Challenger - Completion of 41G Mission - KSC

National Aeronautics and Space Administration (NASA) Space Shuttle [Discovery flying over Washington. D.C., on final journey to its permanent museum home]

KENNEDY SPACE CENTER, FLA. -- Seen from inside the Orbiter Processing Facility bay 3, space shuttle Discovery begins rolling out for the short trip to the Vehicle Assembly Building. In the VAB, the shuttle will be lifted and mated with the external tank and solid rocket boosters on the mobile launcher platform. Discovery is targeted for launch to the International Space Station for mission STS-120 on Oct. 23. The crew will be delivering and installing the Italian-built U.S. Node 2, named Harmony. The pressurized module will act as an internal connecting port and passageway to additional international science labs and cargo spacecraft. In addition to increasing the living and working space inside the station, it also will serve as a work platform outside for the station's robotic arm. Photo credit: NASA/Charisse Nahser KSC-07pd2537

STS-135 - Public domain NASA photogrpaph

NASA X-38, Dryden history gallery

Shuttle Enterprise Flight to New York

STS098-357-014 - STS-098 - Atlantis empty payload bay with Earth limb

code Related

KENNEDY SPACE CENTER, FLA. -- Inside the Orbiter Processing Facility, space shuttle Endeavour is ready for the rollover to the Vehicle Assembly Building. In high bay 1 of the VAB, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Jim Grossmann KSC-08pd0265

KENNEDY SPACE CENTER, FLA. -- On its transporter, space shuttle Endeavour turns away from the Orbiter Processing Facility to start the rollover to the Vehicle Assembly Building. In high bay 1 of the VAB, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Jim Grossmann KSC-08pd0268

KENNEDY SPACE CENTER, FLA. -- On its transporter, space shuttle Endeavour rolls out of the Orbiter Processing Facility on its way to the Vehicle Assembly Building. In high bay 1 of the VAB, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Jim Grossmann KSC-08pd0266

KENNEDY SPACE CENTER, FLA. -- On its transporter, space shuttle Endeavour rolls into the transfer aisle of the Vehicle Assembly Building where it will be lifted into high bay 1. There, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Jim Grossmann KSC-08pd0272

KENNEDY SPACE CENTER, FLA. -- On its transporter, space shuttle Endeavour rolls toward the Vehicle Assembly Building after leaving the Orbiter Processing Facility. In high bay 1 of the VAB, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Jim Grossmann KSC-08pd0270

KENNEDY SPACE CENTER, FLA. -- On its transporter, space shuttle Endeavour begins the rollover to the Vehicle Assembly Building. In high bay 1 of the VAB, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Jim Grossmann KSC-08pd0269

KENNEDY SPACE CENTER, FLA. -- On its transporter, space shuttle Endeavour turns toward the open door of the Vehicle Assembly Building. In high bay 1 of the VAB, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Jim Grossmann KSC-08pd0271

KENNEDY SPACE CENTER, FLA. -- On its transporter, space shuttle Endeavour rolls into the transfer aisle of the Vehicle Assembly Building where it will be lifted into high bay 1. There, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Jim Grossmann KSC-08pd0273

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle Assembly Building, the suspended space shuttle Endeavour is slowly being raised to a vertical position. It will then be lifted up into high bay 1 to be attached to its external fuel tank and solid rocket boosters in preparation for launch on the STS-123 mission, targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd0277

KENNEDY SPACE CENTER, FLA. -- Inside the Orbiter Processing Facility, space shuttle Endeavour settles on its transporter for the trip to the Vehicle Assembly Building. In high bay 1 of the VAB, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Jim Grossmann KSC-08pd0264

description

Summary

KENNEDY SPACE CENTER, FLA. -- Inside the Orbiter Processing Facility, space shuttle Endeavour settles on its transporter for the trip to the Vehicle Assembly Building. In high bay 1 of the VAB, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Jim Grossmann

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

ov 105 kennedy space center orbiter endeavour space shuttle endeavour transporter trip bay vab fuel fuel tank rocket boosters rocket boosters preparation sts international space station section first section japan aerospace exploration japan aerospace exploration agency kibo laboratory kibo laboratory canadian canadian space agency system dextre jim grossmann space shuttle vehicle assembly building high resolution nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Ov 105, First Section, Kibo Laboratory

STS100-395-015 - STS-100 - MS Parazynski raises the UHF antenna on Destiny during the first EVA of STS-100

S115E05811 - STS-115 - MacLean and Burbank performing second EVA spacewalk

CAPE CANAVERAL, Fla. – Space shuttle Discovery is towed from the Shuttle Landing Facility at NASA's Kennedy Space Center. Discovery's landing ended the 14-day, STS-124 mission to the International Space Station. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station. The landing was on time at 11:15 a.m. EDT. Photo credit: NASA/Jim Grossmann KSC-08pd1738

S115E05828 - STS-115 - MacLean performing second EVA spacewalk

STS100-333-005 - STS-100 - MS Hadfield and MS Parazynski work around the SLP during an EVA for STS-100

Space shuttle Endeavour Lands at LAX

KENNEDY SPACE CENTER, FLA. -- Flames from the solid rocket boosters on space shuttle Endeavour light up Launch Pad 39A as the vehicle races into the night sky on mission STS-123. The liftoff was on time at 2:28 a.m. EDT. Endeavour's crew will make a record-breaking 16-day mission to the International Space Station and deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Sandra Joseph, Tony Gray, Robert Murray KSC-08pp0753

EDWARDS, Calif. – Against a setting sun, space shuttle Endeavour undergoes recovery operations on Edwards Air Force Base in California after its landing. The orbiter convoy normally begins recovery operations in earnest about two hours before the shuttle is scheduled to land. Specially designed vehicles or units and a team of trained personnel “safe” the orbiter and prepare it for towing. Purge and Coolant Umbilical Access Vehicles are moved into position behind the orbiter to get access to the umbilical areas. The flight crew is replaced aboard the orbiter by exchange sup¬port personnel who prepare the orbiter for ground tow operations, install switch guards and remove data packages from any onboard experiments. After a total safety downgrade, vehicle ground personnel make numerous preparations for the towing operation, including install¬ing landing gear lock pins, disconnecting the nose landing gear drag link, positioning the towing vehicle in front of the orbiter and connecting the tow bar. The decision to land Endeavour at Edwards was made due to weather concerns at NASA's Kennedy Space Center in Florida. In the 52nd landing at Edwards, Endeavour touched down at 4:25 p.m. EST to end the STS-126 mission, completing its 16-day journey of more than 6.6 million miles in space. Endeavour will be returned to Kennedy atop a Shuttle Carrier Aircraft, or SCA, a modified Boeing 747 jetliner. Photo credit: NASA/Tony Landis, VAFB KSC-08pd3887

S127E008542 - STS-127 - Hurley,Polansky,Kopra and Cassidy pose for photo during Joint Operations

S129E006715 - STS-129 - View of Expedition 21/STS-129 Crew Members on the Shuttle Atlantis Middeck

S115E05873 - STS-115 - Burbank and MacLean prepares the SARJ on the P3 - P4 Truss Segment during STS-115 EVA

S115E05876 - STS-115 - Burbank and MacLean prepare the SARJ on the P3 - P4 Truss Segment during STS-115 EVA

Topics

ov 105 kennedy space center orbiter endeavour space shuttle endeavour transporter trip bay vab fuel fuel tank rocket boosters rocket boosters preparation sts international space station section first section japan aerospace exploration japan aerospace exploration agency kibo laboratory kibo laboratory canadian canadian space agency system dextre jim grossmann space shuttle vehicle assembly building high resolution nasa