visibility Similar

S122E012123 - STS-122 - Walheim on FD during STS-122

STS073-111-005 - STS-073 - STS-73 Crew portrait in the USML-2 Spacelab

Post-docking crew activities as the STS-84 crew meets the Mir 23 crew

STS080-307-026 - STS-080 - Public domain NASA photogrpaph

Space Shuttle Challenger, STS-7 - CREW PORTRAIT

STS112-331-024 - STS-112 - Expedition 5 and STS-112 crews pose for portrait in Destiny module

S121E06240 - STS-121 - STS-121 and Expedition 13 group photo taken during STS-121 / Expedition 13 joint operations

STS-123 - LAUNCH - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. -- Gathered in the white room on Launch Pad 39A, alongside space shuttle Discovery, the STS-120 crew pauses for a photo. Clockwise from the bottom are Commander Pamela Melroy, Mission Specialists Scott Parazynski and Stephanie Wilson, Pilot George Zamka, Mission Specialists Paolo Nespoli, Daniel Tani and Doug Wheelock (kneeling). Nespoli represents the European Space Agency. After the mission, Tani will remain aboard the International Space Station and return with the STS-122 crew, targeted to launch Dec. 6. The crew is at NASA's Kennedy Space Center for the pre-launch terminal countdown demonstration test, or TCDT. The TCDT provides astronauts and ground crews an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station. Launch of Discovery on mission STS-120 is targeted for Oct. 23 at 11:38 a.m. EDT on a 14-day mission. Photo credit: NASA/Kim Shiflett KSC-07pd2735

code Related

KENNEDY SPACE CENTER, FLA. -- STS-122 Mission Specialist Leland Melvin, at right, practices driving an M-113 armored personnel carrier as the instructor beside him monitors his performance. STS-122 Pilot Alan Poindexter, at left, rides in back. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3341

KENNEDY SPACE CENTER, FLA. -- STS-122 Commander Stephen Frick takes time out from driving practice of the M-113 armored personnel carrier to pose for a photo. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3336

KENNEDY SPACE CENTER, FLA. -- STS-122 Mission Specialist Hans Schlegel, of the European Space Agency, takes time out from driving practice of the M-113 armored personnel carrier to pose for a photo. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3345

KENNEDY SPACE CENTER, FLA. -- STS-122 Pilot Alan Poindexter takes time out from driving practice of the M-113 armored personnel carrier to pose for a photo. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3338

KENNEDY SPACE CENTER, FLA. -- STS-122 Mission Specialist Rex Walheim, at right, practices driving an M-113 armored personnel carrier as the instructor beside him monitors his performance. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3344

KENNEDY SPACE CENTER, FLA. -- STS-122 Mission Specialist Rex Walheim takes time out from driving practice of the M-113 armored personnel carrier to pose for a photo as Mission Specialist Stanley Love, behind him, takes a photo of his own. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3343

KENNEDY SPACE CENTER, FLA. -- STS-122 Mission Specialist Stanley Love takes time out from driving practice of the M-113 armored personnel carrier to pose for a photo as Mission Specialist Rex Walheim, behind him, prepares to ride along. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3347

KENNEDY SPACE CENTER, FLA. -- STS-122 Mission Specialist Stanley Love, at right, practices driving an M-113 armored personnel carrier as the instructor behind him monitors his performance. Former astronaut Jerry Ross, chief of the Vehicle Integration Test Office at NASA Johnson Space Center, enjoys the ride in back. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3348

KENNEDY SPACE CENTER, FLA. -- STS-122 Pilot Alan Poindexter, at right, seems to enjoy driving an M-113 armored personnel carrier as the instructor behind him monitors his performance. European Space Agency astronaut Frank De Winne, at left, the backup for STS-122 Mission Specialist Leopold Eyharts, is along for the ride. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3339

KENNEDY SPACE CENTER, FLA. -- STS-122 Mission Specialist Leland Melvin takes time out from driving practice of the M-113 armored personnel carrier to pose for a photo. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3340

description

Summary

KENNEDY SPACE CENTER, FLA. -- STS-122 Mission Specialist Leland Melvin takes time out from driving practice of the M-113 armored personnel carrier to pose for a photo. The practice near Launch Pad 39B is part of training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett

Nothing Found.

label_outline

Tags

tcdt m 113 training practice tank kennedy space center sts specialist leland melvin mission specialist leland melvin practice personnel carrier personnel carrier launch pad emergency egress procedures emergency egress procedures transport crew safety contingency terminal countdown activities terminal countdown demonstration test activities preparations tcdt astronauts ground ground crews equipment familiarization equipment familiarization emergency egress mission sts atlantis european european space agency columbus module columbus module international space station laboratory node harmony research research facilities high resolution nasa
date_range

Date

18/11/2007
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Tcdt M 113 Training Practice Tank, Mission Specialist Leland Melvin, Emergency Egress Procedures

S122E006295 - STS-122 - Frick and Melvin on FD during STS-122

KENNEDY SPACE CENTER, FLA. -- The STS-122 crew poses for a group portrait near Launch Pad 39B during a training session on the operation of the M-113 armored personnel carrier. An M-113 will be available to transport the crew to safety in the event of an emergency on the pad before their launch. From left are Mission Specialists Rex Walheim, Leopold Eyharts and Hans Schlegel of the European Space Agency, Stanley Love; Commander Steve Frick; Pilot Alan Poindexter; and Mission Specialist Leland Melvin. The crew is participating in Terminal Countdown Demonstration Test activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6. Photo credit: NASA/Kim Shiflett KSC-07pd3334

S122E008125 - STS-122 - Frick and Melvin in the A/L prior to EVA 2

S122E006297 - STS-122 - Frick and Melvin on FD during STS-122

KENNEDY SPACE CENTER, FLA. -- STS-120 Mission Specialist Stephanie Wilson is helped with her boot during suitup for a simulated launch countdown, part of the prelaunch terminal countdown demonstration test, or TCDT. Her name patch reflects the nicknames the crew gave each other for the event. The TCDT provides astronauts and ground crews an opportunity to participate in various launch preparation activities, including equipment familiarization, emergency training and the simulated countdown. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station. Launch of Discovery on mission STS-120 is targeted for Oct. 23 at 11:38 a.m. EDT on a 14-day mission. Photo credit: NASA/Kim Shiflett KSC-07pd2768

KENNEDY SPACE CENTER, FLA. -- STS-107 Commander Rick Husband takes a break during training on the operation of an M113 armored personnel carrier during Terminal Countdown Demonstration Test activities, a standard part of launch preparations. Instructor George Hoggard looks on over Husband's shoulder. STS-107 is a mission devoted to research and will include more than 80 experiments that will study Earth and space science, advanced technology development, and astronaut health and safety. Launch is planned for Jan. 16, 2003, between 10 a.m. and 2 p.m. EST aboard Space Shuttle Columbia. KSC-02pd1932

KENNEDY SPACE CENTER, FLA. -- After greeting the media on the Shuttle Landing Facility at NASA's Kennedy Space Center, the STS-122 crew stands in front of space shuttle Atlantis for a final group photo. From left are Mission Specialists Leland Melvin, Hans Schlegel, Rex Walheim and Stanley Love, Pilot Alan Poindexter and Commander Steve Frick. Schlegel represents the European Space Agency. After a round trip of nearly 5.3 million miles, space shuttle Atlantis and crew returned to Earth with a landing at 9:07 a.m. EST. The shuttle landed on orbit 202 to complete the 13-day STS-122 mission. Main gear touchdown was 9:07:10 a.m. Nose gear touchdown was 9:07:20 a.m. Wheel stop was at 9:08:08 a.m. Mission elapsed time was 12 days, 18 hours, 21 minutes and 44 seconds. During the mission, Atlantis' crew installed the new Columbus laboratory, leaving a larger space station and one with increased science capabilities. The Columbus Research Module adds nearly 1,000 cubic feet of habitable volume and affords room for 10 experiment racks, each an independent science lab. Photo credit: NASA/Jack Pfaller KSC-08pd0407

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-122 crew members inspect the Columbus European Laboratory, part of the payload on their mission. Seen here is Commander Steve Frick. The crew is participating in a crew equipment interface test that provides opportunities for hands-on experience with payloads and equipment. The other crew members are Pilot Alan Poindexter and Mission Specialists Rex Walheim, Stan Love, Leland Melvin and Hans Schlegel, who represents the European Space Agency. The 24th mission to the International Space Station, STS-122 will also include the Multi-Purpose Experiment Support Structure - Non-Deployable (MPESS-ND). Launch of STS-122 on Space Shuttle Discovery is scheduled no earlier than October. Photo credit: NASA/Kim Shiflett KSC-07pd0058

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, members of the STS-122 crew arrive for launch. From left are Mission Specialists Leopold Eyharts, Stanley Love, Hans Schlegel, Rex Walheim and Leland Melvin. They were greeted by Doug Lyons (left, yellow shirt), launch director for the mission, and Pete Nickolenko (right, green shirt), lead shuttle test director. Eyharts and Schlegel represent the European Space Agency. The crew's arrival signals the imminent launch of space shuttle Atlantis' STS-122 mission, at 2:45 p.m. Feb. 7. This will be the third launch attempt for the mission. Some of the tank's ECO sensors gave failed readings during propellant tanking for launch attempts on Dec. 6 and Dec. 9, subsequently scrubbing further attempts until the cause could be found and repairs made. Atlantis will carry the Columbus module, Europe's largest contribution to the construction of the International Space Station. It will support scientific and technological research in a microgravity environment. Columbus is a multifunctional, pressurized laboratory that will be permanently attached to the Harmony module of the space station to carry out experiments in materials science, fluid physics and biosciences, as well as to perform a number of technological applications. Photo credit: NASA/Kim Shiflett KSC-08pd0125

S122E008250 - STS-122 - Melvin and Love in the U.S. Lab

S129E007204 - STS-129 - STS-129 MS1 Melvin works to install the ELC2

Rubber keeps them flying. This bomber needs thousands of pounds of rubber for the landing wheels and bullet-proof fuel tanks. The flyers and ground crews can do none of the important work entrusted to them unless we keep their planes supplied with the prodigious amounts of rubber they require

Topics

tcdt m 113 training practice tank kennedy space center sts specialist leland melvin mission specialist leland melvin practice personnel carrier personnel carrier launch pad emergency egress procedures emergency egress procedures transport crew safety contingency terminal countdown activities terminal countdown demonstration test activities preparations tcdt astronauts ground ground crews equipment familiarization equipment familiarization emergency egress mission sts atlantis european european space agency columbus module columbus module international space station laboratory node harmony research research facilities high resolution nasa