visibility Similar

Space shuttle STS-93 Rollover. NASA public domain image colelction.

STS-119 - EOM - Public domain NASA photogrpaph

STS-127 - EOM - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. – Technicians monitor the progress as Space shuttle Endeavour is backed away from the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida so that it can be towed to Orbiter Processing Facility-2 (OPF-2). Shuttle Endeavour will remain in OPF-2 so that the orbiter maneuvering system (OMS) pods and forward reaction control system can be installed. Technicians also will offload water and Freon gas from lines located in Endeavour’s midbody. The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. Endeavour’s STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: Kim Shiflett KSC-2012-1190

STS-131 - Public domain NASA photogrpaph

STS-118 - EOM - Public domain NASA photogrpaph

STS-124 landing, NASA Space Shuttle Landing Facility

CAPE CANAVERAL, Fla. – Space shuttle Endeavour is backed away from the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida so that it can be towed to Orbiter Processing Facility-2 (OPF-2). Shuttle Endeavour will remain in OPF-2 so that the orbiter maneuvering system (OMS) pods and forward reaction control system can be installed. Technicians also will offload water and Freon gas from lines located in Endeavour’s midbody. The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. Endeavour’s STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: Kim Shiflett KSC-2012-1189

Shuttle Carrier Aircraft SCA Space Shuttle Ferry

code Related

KENNEDY SPACE CENTER, FLA. -- After a 15-day mission to the International Space Station, space shuttle Discovery glides to a smooth landing on Runway 33 of the Shuttle Landing Facility at NASA's Kennedy Space Center at 1:01 p.m. EST on Nov. 7, completing mission STS-120. Main gear touchdown was 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. The STS-120 crew continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Tom Joseph KSC-07pd3164

KENNEDY SPACE CENTER, FLA. -- After a 15-day mission to the International Space Station, space shuttle Discovery kicks up dust as its wheels touch down on Runway 33 of the Shuttle Landing Facility at NASA's Kennedy Space Center at 1:01 p.m. EST on Nov. 7, completing mission STS-120. Main gear touchdown was 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. The STS-120 crew continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Kim Shiflett KSC-07pd3155

KENNEDY SPACE CENTER, FLA. -- After a 15-day mission to the International Space Station, space shuttle Discovery touches down on Runway 33 of the Shuttle Landing Facility at NASA's Kennedy Space Center, completing mission STS-120. Main gear touchdown was 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. Mission STS-120 continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Scott Haun KSC-07pd3204

KENNEDY SPACE CENTER, FLA. -- The drag chute deployed behind space shuttle Discovery helps slow its smooth landing on Runway 33 of the Shuttle Landing Facility at NASA's Kennedy Space Center, completing the 15-day mission STS-120. Main gear touchdown was 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. Mission STS-120 continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Scott Haun KSC-07pd3205

KENNEDY SPACE CENTER, FLA. -- After a 15-day mission to the International Space Station, space shuttle Discovery touches down on Runway 33 of the Shuttle Landing Facility at NASA's Kennedy Space Center, completing mission STS-120. Main gear touchdown was 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. Mission STS-120 continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Scott Haun KSC-07pd3203

KENNEDY SPACE CENTER, FLA. -- After a 15-day mission to the International Space Station, space shuttle Discovery kicks up dust as its wheels touch down on Runway 33 of the Shuttle Landing Facility at NASA's Kennedy Space Center at 1:01 p.m. EST on Nov. 7, completing mission STS-120. Main gear touchdown was 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. The STS-120 crew continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Tom Farrar KSC-07pd3153

KENNEDY SPACE CENTER, FLA. -- The space shuttle Discovery kicks up dust as it touches down on Runway 33 of the Shuttle Landing Facility at NASA's Kennedy Space Center to complete the 15-day mission STS-120. Main gear touchdown was 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. During the mission, the STS-120 crew continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Jerry Cannon, Richard Prickett KSC-07pp3249

KENNEDY SPACE CENTER, FLA. -- After a 15-day mission to the International Space Station, space shuttle Discovery kicks up dust as its wheels touch down on Runway 33 of the Shuttle Landing Facility at NASA's Kennedy Space Center at 1:01 p.m. EST on Nov. 7, completing mission STS-120. Main gear touchdown was 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. The STS-120 crew continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Tom Joseph KSC-07pd3163

KENNEDY SPACE CENTER, FLA. -- The drag chute is deployed behind space shuttle Discovery to help slow its landing on Runway 33 of the Shuttle Landing Facility at NASA's Kennedy Space Center at 1:01 p.m. EST on Nov. 7, completing the 15-day mission STS-120. Main gear touchdown was 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. The STS-120 crew continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Kim Shiflett KSC-07pd3158

KENNEDY SPACE CENTER, FLA. -- After a 15-day mission to the International Space Station, space shuttle Discovery glides to a smooth landing on Runway 33 of the Shuttle Landing Facility at NASA's Kennedy Space Center at 1:01 p.m. EST on Nov. 7, completing mission STS-120. Main gear touchdown was 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. The STS-120 crew continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Kim Shiflett KSC-07pd3156

description

Summary

KENNEDY SPACE CENTER, FLA. -- After a 15-day mission to the International Space Station, space shuttle Discovery glides to a smooth landing on Runway 33 of the Shuttle Landing Facility at NASA's Kennedy Space Center at 1:01 p.m. EST on Nov. 7, completing mission STS-120. Main gear touchdown was 1:01:16 p.m. Wheel stop was at 1:02:07 p.m. Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds. The STS-120 crew continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

ov 103 kennedy space center international space station discovery space shuttle discovery runway sts mission sts main gear touchdown main gear touchdown wheel hours minutes seconds crew construction installation harmony node harmony node module relocation truss space shuttle high resolution nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Harmony Node, Relocation, Ov 103

Topics

ov 103 kennedy space center international space station discovery space shuttle discovery runway sts mission sts main gear touchdown main gear touchdown wheel hours minutes seconds crew construction installation harmony node harmony node module relocation truss space shuttle high resolution nasa