visibility Similar

KENNEDY SPACE CENTER, FLA. -- The encapsulated TDRS-J satellite is mated with the Atlas IIA launch vehicle on Launch Complex 36-A, Cape Canaveral Air Force Station. The satellite is scheduled to be launched Dec. 4 aboard an Atlas IIA vehicle. The launch window is 9:42 to 10:22 p.m. EST. TDRS-J, the third in a series of telemetry satellites, will help replenish the current constellation of geosynchronous TDRS satellites that are the primary source of space-to-ground voice, data and telemetry for the Space Shuttle. The satellites also provide communications with the International Space Station and scientific spacecraft in low-Earth orbit such as the Hubble Space Telescope. This new advanced series of satellites will extend the availability of TDRS communications services until about 2017. KSC-02pd1840

STS-132 - EOM - Public domain NASA photogrpaph

Space shuttle STS_135_Launch. NASA public domain image colelction.

Orion Starts Roll to Launch Pad 37

STS-65 Columbia, OV-102, lifts off from KSC LC Pad 39A

A large space shuttle taking off into the sky. Atlantis space shuttle launch reflection, science technology.

CAPE CANAVERAL, Fla. – Propelled by a column of fire, space shuttle Discovery races toward space on the STS-119 mission after liftoff from Launch Pad 39A at NASA's Kennedy Space Center in Florida. Launch was on time at 7:43 p.m. EDT. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo courtesy of Scott Andrews KSC-2009-2081

STS-133 - LAUNCH - Public domain NASA photogrpaph

Launch of Space Shuttle Atlantis / STS-125 Mission

code Related

KENNEDY SPACE CENTER, FLA. -- Moments after liftoff on mission STS-120, space shuttle Discovery's solid rocket boosters spew columns of fire, creating clouds of smoke and steam below on Launch Pad 39A at NASA's Kennedy Space Center.. At left is the fixed service structure, topped by the 80-foot-tall lightning mast. Liftoff was on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo courtesy of Nikon/Scott Andrews KSC-07pd2970

KENNEDY SPACE CENTER, FLA. -- Nearby water reflects the light from Space shuttle Discovery as it heads for blue sky atop twin columns of fire, hurling swirls of smoke and steam across Launch Pad 39A at NASA's Kennedy Space Center. Launching on mission STS-120 to the International Space Station, liftoff was on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo courtesy of Nikon/Scott Andrews KSC-07pd2969

KENNEDY SPACE CENTER, FLA. -- Atop twin columns of fire, space shuttle Discovery passes the lightning rod atop the fixed service structure at left on Launch Pad 39A at NASA's Kennedy Space Center. Smoke and steam from liftoff billow across the pad. AT right is the 300-gallon water tower that provides water for sound suppression. Liftoff was on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo courtesy of Nikon/Scott Andrews KSC-07pd2975

KENNEDY SPACE CENTER, FLA. -- Nearby water reflects the light from Space shuttle Discovery as it heads for blue sky atop twin columns of fire, hurling swirls of smoke and steam across Launch Pad 39A at NASA's Kennedy Space Center. Launching on mission STS-120 to the International Space Station, liftoff was on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo courtesy of Nikon/Scott Andrews KSC-07pd2973

KENNEDY SPACE CENTER, FLA. -- Clouds of smoke and steam reflect the fiery column beneath space shuttle Discovery as it leaps off Launch Pad 39A at NASA's Kennedy Space Center on mission STS-120 to the International Space Station. Liftoff was on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo courtesy of Nikon/Scott Andrews. KSC-07pd2963

KENNEDY SPACE CENTER, FLA. -- Nearby water reflects the brilliant light of flames beneath space shuttle Discovery as it leaps through the clouds into a blue sky heading for the International Space Station on mission STS-120. Billows of clouds and smoke stream across Launch Pad 39A at NASA's Kennedy Space Center. Liftoff was on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Sandra Joseph, Tony Gray & Robert Murray KSC-07pd2961

KENNEDY SPACE CENTER, FLA. -- As space shuttle Discovery roars into the sky, the column of fire below creates clouds of smoke and steam rolling across Launch Pad 39A at NASA's Kennedy Space Center. Liftoff of Discovery was on time at 11:38:19 a.m. EDT. The mission is the 23rd assembly flight to the space station and the 34th flight for Discovery. The STS-120 payload is the Italian-built U.S. Node 2, called Harmony. During the 14-day mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:50 a.m. EST on Nov. 6. Photo credit: NASA/Sandra Joseph, Tony Gray, Robert Murray KSC-07pp2995

KENNEDY SPACE CENTER, FLA. -- Atop a pillar of fire, space shuttle Discovery roars into the sky toward space. Clouds of smoke and steam roll across the seaside launch pad at NASA's Kennedy Space Center. Liftoff was on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/George Shelton KSC-07pd2950

KENNEDY SPACE CENTER, FLA. -- Out of the clouds of smoke and steam rolling across Launch Pad 39A at NASA's Kennedy Space Center, space shuttle Discovery hurtles toward space on the 23rd assembly mission to the International Space Station. Liftoff was on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Debbie Odom KSC-07pd2946

KENNEDY SPACE CENTER, FLA. -- Moments after liftoff on mission STS-120, space shuttle Discovery's solid rocket boosters spew columns of fire, creating clouds of smoke and steam below on Launch Pad 39A at NASA's Kennedy Space Center. At right is the 300,000-gallon water tower that provides water for the sound suppression system during liftoff, which occurred on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo courtesy of Nikon/Scott Andrews KSC-07pd2971

description

Summary

KENNEDY SPACE CENTER, FLA. -- Moments after liftoff on mission STS-120, space shuttle Discovery's solid rocket boosters spew columns of fire, creating clouds of smoke and steam below on Launch Pad 39A at NASA's Kennedy Space Center. At right is the 300,000-gallon water tower that provides water for the sound suppression system during liftoff, which occurred on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo courtesy of Nikon/Scott Andrews

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

kennedy space center moments liftoff sts mission sts discovery space shuttle discovery rocket boosters rocket boosters fire clouds smoke steam launch pad water tower suppression system sound suppression system italian built italian built u node harmony crew move arrays home return home courtesy photo courtesy nikon scott andrews space shuttle space shuttle liftoff high resolution nasa
date_range

Date

23/10/2007
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Sound Suppression System, Moments, Return Home

An air-to-air view of an MGM-118A Peacekeeper international ballistic missile moments after launching. This is the first test launch of the Peacekeeper

An alarm clock sitting on top of a wave. Clock alarm clock time

View of the STS 41-D crew in the middeck

A model rocket slowly falls to earth after being launched into air just moments earlier at Marine Corps Air Station (MCAS) Beaufort, South Carolina (SC). Fourth-grade through sixth-grade students are participating in STARBASE, a Department of Defense (DOD)-funded community service program focused on enhancing math, science and goal-setting skills

“The Ghost” safely lands on the runway at Marine Corps

KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle Assembly Building at KSC, an overhead crane raises external tank No. 120 to a vertical position. The tank will next be lifted into a checkout cell. ET-120 will be prepared for stacking with solid rocket boosters to launch Space Shuttle Discovery on mission STS-120 in October. The mission is the 23rd to the International Space Station and will launch an Italian-built, U.S. multi-port module known as Harmony for the station. Christened after a school contest, Harmony will provide attachment points for European and Japanese laboratory modules. NASA/George Shelton KSC-07pd2149

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery moves along the crawlerway from the Vehicle Assembly Building toward Launch Pad 39A as the sun rises on a balmy Florida morning. First motion out of the VAB was at 6:47 a.m. EDT. Rollout is a milestone for Discovery's launch to the International Space Station on mission STS-120, targeted for Oct. 23. The crew will be delivering and installing the Italian-built U.S. Node 2, named Harmony. The pressurized module will act as an internal connecting port and passageway to additional international science labs and cargo spacecraft. In addition to increasing the living and working space inside the station, it also will serve as a work platform outside for the station's robotic arm. Photo credit: NASA/George Shelton KSC-07pd2621

KENNEDY SPACE CENTER, FLA. -- Atop twin columns of fire, space shuttle Discovery clears the lightning rod atop the fixed service structure at left on Launch Pad 39A at NASA's Kennedy Space Center. Smoke and steam from liftoff billow across the pad. Liftoff was on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo courtesy of Nikon/Scott Andrews KSC-07pd2974

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building, space shuttle Discovery is lifted into the upper regions for transfer to high bay 1. In the bay, Discovery will be mated with the external tank and solid rocket boosters waiting on the mobile launcher platform. Discovery is targeted for launch to the International Space Station for mission STS-120 on Oct. 23. The crew will be delivering and installing the Italian-built U.S. Node 2, named Harmony. The pressurized module will act as an internal connecting port and passageway to additional international science labs and cargo spacecraft. In addition to increasing the living and working space inside the station, it also will serve as a work platform outside for the station's robotic arm. Photo credit: NASATroy Cryder KSC-07pd2552

KENNEDY SPACE CENTER, FLA. -- Space shuttle Discovery is ready to roll out of the Orbiter Processing Facility bay 3 on its transporter for the short trip to the Vehicle Assembly Building. In the VAB, the shuttle will be lifted and mated with the external tank and solid rocket boosters on the mobile launcher platform. Discovery is targeted for launch to the International Space Station for mission STS-120 on Oct. 23. The crew will be delivering and installing the Italian-built U.S. Node 2, named Harmony. The pressurized module will act as an internal connecting port and passageway to additional international science labs and cargo spacecraft. In addition to increasing the living and working space inside the station, it also will serve as a work platform outside for the station's robotic arm. Photo credit: NASA/Amanda Diller KSC-07pd2535

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery Flow Director Stephanie Stilson poses with the orbiter in the background as it is moved from the Vehicle Assembly Building to Launch Pad 39A. First motion out of the VAB was at 6:47 a.m. EDT. Rollout is a milestone for Discovery's launch to the International Space Station on mission STS-120, targeted for Oct. 23. The crew will be delivering and installing the Italian-built U.S. Node 2, named Harmony. The pressurized module will act as an internal connecting port and passageway to additional international science labs and cargo spacecraft. In addition to increasing the living and working space inside the station, it also will serve as a work platform outside for the station's robotic arm. Photo credit: NASA/George Shelton KSC-07pd2620

KENNEDY SPACE CENTER, FLA. -- Viewed from the top of the Vehicle Assembly Building, Space Shuttle Atlantis is a small tip on the trailing column of fire and smoke after launching on mission STS-117. Liftoff from Launch Pad 39A was on-time at 7:38:04 p.m. EDT. The shuttle is delivering a new segment to the starboard side of the International Space Station's backbone, known as the truss. Three spacewalks are planned to install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. STS-117 is the 118th space shuttle flight, the 21st flight to the station, the 28th flight for Atlantis and the first of four flights planned for 2007. Photo courtesy of Nikon/Scott Andrews KSC-07pd1439

Topics

kennedy space center moments liftoff sts mission sts discovery space shuttle discovery rocket boosters rocket boosters fire clouds smoke steam launch pad water tower suppression system sound suppression system italian built italian built u node harmony crew move arrays home return home courtesy photo courtesy nikon scott andrews space shuttle space shuttle liftoff high resolution nasa