visibility Similar

NASA STS-125, Dryden history gallery

View of the landing of Endeavour at KSC ending the STS-108 mission

KENNEDY SPACE CENTER, Fla. -- The Space Shuttle orbiter Endeavour touches down on Runway 15 of the KSC Shuttle Landing Facility (SLF) to complete the nearly nine-day STS-89 mission. Main gear touchdown was at 5:35:09 p.m. EST on Jan. 31, 1998. The wheels stopped at 5:36:19 EST, completing a total mission time of eight days, 19 hours, 48 minutes and four seconds. The 89th Space Shuttle mission was the 42nd (and 13th consecutive) landing of the orbiter at KSC, and STS-89 was the eighth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. STS-89 Mission Specialist Andrew Thomas, Ph.D., succeeded NASA astronaut and Mir 24 crew member David Wolf, M.D., who was on the Russian space station since late September 1997. Dr. Wolf returned to Earth on Endeavour with the remainder of the STS-89 crew, including Commander Terrence Wilcutt; Pilot Joe Edwards Jr.; and Mission Specialists James Reilly, Ph.D.; Michael Anderson; Bonnie Dunbar, Ph.D.; and Salizhan Sharipov with the Russian Space Agency. Dr. Thomas is scheduled to remain on Mir until the STS-91 Shuttle mission returns in June 1998. In addition to the docking and crew exchange, STS-89 included the transfer of science, logistical equipment and supplies between the two orbiting spacecrafts KSC-98pc250

STS-129 - EOM - Public domain NASA photogrpaph

STS-129 - EOM - Public domain NASA photogrpaph

View of the landing of Endeavour at KSC ending the STS-108 mission

CAPE CANAVERAL, Fla. – Space shuttle Discovery touches down on Runway 15 at NASA's Kennedy Space Center in Florida to complete the 13-day, 5.3-million mile journey on the STS-119 mission to the International Space Station. Main gear touchdown was at 3:13:17 p.m. EDT. Nose gear touchdown was at 3:13:40 p.m. and wheels stop was at 3:14:45 p.m. Discovery delivered the final pair of large power-generating solar array wings and the S6 truss segment. The mission was the 28th flight to the station, the 36th flight of Discovery and the 125th in the Space Shuttle Program, as well as the 70th landing at Kennedy. Photo credit: NASA/Kevin O'Connell KSC-2009-2376

STS-127 - EOM - Public domain NASA photogrpaph

Patty Hilliard Robertson Memorial

code Related

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, workers monitor the progress as Atlantis is lifted up from the shuttle carrier aircraft, or SCA. The orbiter will be lowered onto the ground and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. Photo credit: NASA/Jack Pfaller. KSC-07pd1786

KENNEDY SPACE CENTER, FLA. -- After demate from the shuttle carrier aircraft, or SCA, Atlantis begins its trek from Kennedy Space Center's Shuttle Landing Facility to the Orbiter Processing Facility. The orbiter will undergo processing for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. Photo credit: NASA/George Shelton. KSC-07pd1799

KENNEDY SPACE CENTER, FLA. -- Atlantis is slowly lowered to the ground at the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be detached from the lifting crane and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. Photo credit: NASA/Jack Pfaller. KSC-07pd1790

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed back from the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be towed to the Orbiter Processing Facility, where processing will begin for its next launch, mission STS-122 in December. In the background is the shuttle carrier aircraft, or SCA. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. Photo credit: NASA/George Shelton. KSC-07pd1797

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is lifted up from the shuttle carrier aircraft, or SCA, beneath it. The orbiter will be lowered to the ground and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. Photo credit: NASA/Jack Pfaller. KSC-07pd1784

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, the crane lowers Atlantis close to the ground. The shuttle carrier aircraft, or SCA, can be seen in the background. Once on the ground, the orbiter will be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. Photo credit: NASA/Jack Pfaller. KSC-07pd1789

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is lifted up as the shuttle carrier aircraft, or SCA, begins to back away. The orbiter will be lowered to the ground and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. Photo credit: NASA/Jack Pfaller. KSC-07pd1785

KENNEDY SPACE CENTER, FLA. -- After demate from the shuttle carrier aircraft, or SCA, Atlantis begins its trek from Kennedy Space Center's Shuttle Landing Facility to the Orbiter Processing Facility. The orbiter will undergo processing for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. Photo credit: NASA/George Shelton. KSC-07pd1800

KENNEDY SPACE CENTER, FLA. -- On the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, technicians monitor the progress as Atlantis is lifted up from the shuttle carrier aircraft, or SCA, beneath it. The orbiter will be lowered to the ground and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. Photo credit: NASA/Jack Pfaller. KSC-07pd1783

KENNEDY SPACE CENTER, FLA. -- Workers use an aircraft tug vehicle to back Atlantis away from the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be towed to the Orbiter Processing Facility where processing will begin for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. Photo credit: NASA/George Shelton. KSC-07pd1796

description

Summary

KENNEDY SPACE CENTER, FLA. -- Workers use an aircraft tug vehicle to back Atlantis away from the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be towed to the Orbiter Processing Facility where processing will begin for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117. Photo credit: NASA/George Shelton.

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

atlantis sts 117 slf mate demate kennedy space center workers aircraft tug aircraft tug vehicle atlantis mate demate orbiter sts mission sts sca cross country cross country flight fuel delays weather delays touchdown edwards air force base california end mission sts george shelton air force space shuttle high resolution nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Atlantis Sts 117 Slf Mate Demate, Weather Delays, Cross Country Flight

A tug boat follows behind the British patrol submarine HMS OCELOT (S-17) as it approaches the Miraflores Locks during its transit of the Panama Canal

Crewmen and representative from Eastport International prepare to deploy the unmanned submersible Deep Drone from the fleet tug USNS NARRAGANSETT (T-ATF 167) as the salvage ship USS CONSERVER (ARS 39) patrols nearby during salvage operations for downed Korean Air Lines Flight 007 (KAL-007). The commercial jet was shot down by Soviet aircraft over Sakhalin Island on August 30, 1983 in the Sea of Japan. All 269 passengers and crewmen were killed

Overall view of the interior of the AIRMAN Memorial Chapel showing family, friends and shipmates attending a memorial service for LT. CDR. J. Stacy Bates and LT. Graham Alden Higgins. Bates and Higgins, attached to Fighter Squadron Two One Three (VF-213), died when the F-14 Tomcat aircraft they were flying crashed near Nashville, Tennessee while returning from a cross-country flight on January 29, 1996

U.S. Marine Corps Master Gunnery Sgt. Russell Jewell,

PH1 Felimon Barbante Sea of Japan....A close-up view of the unmanned submersible Deep Drone on the deck of the fleet tug USNS Narragansett (T-ATF-167) being used during salvage operations for downed Korean Air Lines Flight 007 (KAL-007). The commercial jet was shot down by Soviet aircraft over Sakhalin Island on Aug. 30, 1983. All 269 passengers and crewmen were killed. OFFICIAL U.S. NAVY PHOTO (RELEASED)

Aerial port quarter view of the nuclear-powered attack submarine ex-USS NAUTILUS (SSN 571) being towed by the fleet tug USS QUAPAW (ATF 110). The NAUTILUS is en route to Groton, Connecticut, where it will become a museum. The tank landing ship USS TUSCALOOSA (LST 1187) is visible in the background

Steam Tug EPPLETON HALL, Hyde Street Pier, San Francisco, San Francisco County, CA

EDWARDS, Calif. – Against a setting sun, space shuttle Endeavour undergoes recovery operations on Edwards Air Force Base in California after its landing. The orbiter convoy normally begins recovery operations in earnest about two hours before the shuttle is scheduled to land. Specially designed vehicles or units and a team of trained personnel “safe” the orbiter and prepare it for towing. Purge and Coolant Umbilical Access Vehicles are moved into position behind the orbiter to get access to the umbilical areas. The flight crew is replaced aboard the orbiter by exchange sup¬port personnel who prepare the orbiter for ground tow operations, install switch guards and remove data packages from any onboard experiments. After a total safety downgrade, vehicle ground personnel make numerous preparations for the towing operation, including install¬ing landing gear lock pins, disconnecting the nose landing gear drag link, positioning the towing vehicle in front of the orbiter and connecting the tow bar. The decision to land Endeavour at Edwards was made due to weather concerns at NASA's Kennedy Space Center in Florida. In the 52nd landing at Edwards, Endeavour touched down at 4:25 p.m. EST to end the STS-126 mission, completing its 16-day journey of more than 6.6 million miles in space. Endeavour will be returned to Kennedy atop a Shuttle Carrier Aircraft, or SCA, a modified Boeing 747 jetliner. Photo credit: NASA/Tony Landis, VAFB KSC-08pd3887

Navy Ship ATF 96 Abnaki - Public domain photogrpaph

CAPE CANAVERAL, Fla. – At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, platforms on the mate-demate device surround space shuttle Endeavour as preparations are made to roll the Shuttle Carrier Aircraft, or SCA, to which the shuttle is secured away from the structure. The SCA, a modified 747 jetliner, will fly Endeavour to Los Angeles where it will be placed on public display at the California Science Center. This is the final ferry flight scheduled in the Space Shuttle Program era. For more information on the shuttles' transition and retirement, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-5251

Navy Ship ATF 114 - Public domain photogrpaph

US Army General Henry Shelton, Chairman Joint Chiefs of STAFF, salutes as he proceeds through the rainbow sideboys welcoming his arrival on board USS HARRY S. TRUMAN (CVN 75). Truman is on station in the Persian Gulf in support of Operation SOUTHERN WATCH

Topics

atlantis sts 117 slf mate demate kennedy space center workers aircraft tug aircraft tug vehicle atlantis mate demate orbiter sts mission sts sca cross country cross country flight fuel delays weather delays touchdown edwards air force base california end mission sts george shelton air force space shuttle high resolution nasa