visibility Similar

code Related

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane lowers the SPACEHAB Module into the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7. Photo credit: NASA/Troy Cryder KSC-06pd2450

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane lifts the SPACEHAB Module from its stand for transfer to the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7. Photo credit: NASA/Troy Cryder KSC-06pd2446

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane carries the SPACEHAB Module towards the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7. Photo credit: NASA/Troy Cryder KSC-06pd2447

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane carries the SPACEHAB Module towards the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7. Photo credit: NASA/Troy Cryder KSC-06pd2448

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane moves towards the SPACEHAB Module to transport in to the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7. Photo credit: NASA/Troy Cryder KSC-06pd2444

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, technicians secure the SPACEHAB Module to the overhead crane for transfer to the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7. Photo credit: NASA/Troy Cryder KSC-06pd2445

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, technicians secure the protective coverings on the SPACEHAB Module before it is transferred to the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7. Photo credit: NASA/Troy Cryder KSC-06pd2442

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, technicians secure the protective coverings on the SPACEHAB Module before it is transferred to the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7. Photo credit: NASA/Troy Cryder KSC-06pd2443

KENNEDY SPACE CENTER, FLA. -- With its crane still attached, the orbiter Discovery is settled into place behind the external tank and solid rocket boosters on the mobile launcher platform in high bay 3 of the Vehicle Assembly Building. The orbiter will be installed and added to the stack in preparation for launch. Space Shuttle Discovery is scheduled to roll out to Launch Pad 39B no earlier than Nov. 7 for mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Kim Shiflett KSC-06pd2441

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane lowers the SPACEHAB Module into the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7. Photo credit: NASA/Troy Cryder KSC-06pd2449

description

Summary

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, an overhead crane lowers the SPACEHAB Module into the Payload Canister. The SPACEHAB Module will carry racks of experiments, flight hardware, spacewalk equipment and supplies to support mission STS-116 to the International Space Station. STS-116 will be mission number 20 to the station and construction flight 12A.1. Along with SPACEHAB, the mission payload on Space Shuttle Discovery includes the P5 integrated truss structure and other key components. The launch window opens Dec. 7. Photo credit: NASA/Troy Cryder

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center spacehab module spacehab module payload canister payload canister racks experiments hardware flight hardware spacewalk equipment spacewalk equipment supplies support sts support mission sts international space station mission number construction construction flight mission payload discovery space shuttle discovery truss truss structure components launch launch window troy cryder space shuttle high resolution nasa
date_range

Date

03/11/2006
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Spacewalk Equipment, Support Mission Sts, Mission Number

S115E05811 - STS-115 - MacLean and Burbank performing second EVA spacewalk

CAPE CANAVERAL, Fla. – In the White Room on the orbiter access arm of the fixed service structure on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-127 Mission Specialist Julie Payette waits to finish suiting up before entering space shuttle Endeavour for the simulated launch countdown. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes the simulation, emergency exit training and equipment familiarization. Endeavour's STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex on the International Space Station. Endeavour's launch is scheduled for June 13 at 7:17 a.m. EDT. Photo credit: NASA/Troy Cryder KSC-2009-3528

S82E5019 - STS-082 - Harbaugh checks out PGT tool for upcoming spacewalk

S115E05828 - STS-115 - MacLean performing second EVA spacewalk

S115E05800 - STS-115 - MacLean and Burbank performing second EVA spacewalk

KENNEDY SPACE CENTER, FLA. -- James Stickley and Kristin Rumpf, both with United Space Alliance - Main Propulsion System Engineering, discuss procedures about welding the minute cracks on Endeavour's flow liners. Endeavour is scheduled to fly on mission STS-113 in November. The mission payload is the P1 Integrated Truss Structure, the first portside truss to go to the International Space Station, and will be attached to the central truss segment, S0, on the Station. Also additional cooling radiators will be delivered but will remain stowed until flight 12A.1. KSC-02pd1204

Standing on the Edge of the Bay

Space Shuttle Columbia, Space Shuttle Project

S115E05808 - STS-115 - MacLean and Burbank performing second EVA spacewalk

KENNEDY SPACE CENTER, Fla. -- At the 217-foot level of the Rotating Service Structure on Launch Pad 39B, the STS-106 crew takes a break during Terminal Countdown Demonstration Activities (TCDT) for a group photo. Pictured from left are Mission Specialists Richard A. Mastracchio, Yuri I. Malenchenko and Daniel C. Burbank; Pilot Scott D. Altman; Commander Terrence W. Wilcutt; and Mission Specialists Boris V. Morukov and Edward T. Lu. The TCDT provides the crew with emergency egress training, opportunities to inspect their mission payload in the orbiter’s payload bay, and a simulated launch countdown. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall KSC-00pp1177

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis passes the turn basin as it slowly wends its way toward Launch Pad 39A. First motion out of the Vehicle Assembly Building was at 8:19 a.m. The 3.4-mile trip to the pad along the crawlerway will take about 6 hours. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Launch is targeted for March 15. Photo credit: NASA/Ken Thornsley KSC-07pd0390

S115E06088 - STS-115 - Stefanyshyn-Piper prepares for spacewalk in the Airlock during Expedition 13 / STS-115 Joint Operations

Topics

kennedy space center spacehab module spacehab module payload canister payload canister racks experiments hardware flight hardware spacewalk equipment spacewalk equipment supplies support sts support mission sts international space station mission number construction construction flight mission payload discovery space shuttle discovery truss truss structure components launch launch window troy cryder space shuttle high resolution nasa