visibility Similar

At the Baikonur Cosmodrome in Kazakhstan, Expedition 27 Flight Engineer Ron Garan of NASA (left), Soyuz Commander Alexander Samokutyaev (center) and Flight Engineer Andrey Borisenko suit up for a dress rehearsal of their launch activities and checkout of their Soyuz TMA-21 spacecraft March 22, 2011. The Soyuz, which has been dubbed “Gagarin” and which bears the likeness of cosmonaut Yuri Gagarin, the first human in space, is scheduled for launch on April 5 (April 4, U.S. time), just one week shy of the 50th anniversary of Gagarin’s historic journey into space from the same launch pad that the Expedition 27 crew will begin their mission from. NASA/Victor Zelentsov jsc2011e027663

Soyuz TMA-17 Lands. NASA public domain image colelction.

Chief of Space Operations Gen. John W. Raymond, right,

Expedition 41 Pressure Check. NASA public domain image colelction.

STS-134 - LAUNCH - Public domain NASA photogrpaph

ISS Education Downlink (201011230005HQ)

1412: At the Gagarin Cosmonaut Training Center in Star City, Russia, Expedition 40/41 backup crewmembers Terry Virts of NASA (left) and Samantha Cristoforetti of the European Space Agency (right) share a light moment May 15 during ceremonies to mark the crew’s departure for their launch site at the Baikonur Cosmodrome in Kazakhstan for final pre-launch training. Virts, Cristoforetti and Anton Shkaplerov of the Russian Federal Space Agency (Roscosmos) are the backups to the prime crew -- NASA Flight Engineer Reid Wiseman, Alexander Gerst of the European Space Agency and Soyuz Commander Max Suraev of the Russian Federal Space Agency (Roscosmos) -- who will launch on May 29, Kazakh time, in the Soyuz TMA-13M spacecraft from Baikonur for a 5 ½ month mission on the International Space Station. NASA/Stephanie Stoll jsc2014e045096

At the Gagarin Cosmonaut Training Center in Star City, Russia, Expedition 46-47 prime crewmember Tim Kopra of NASA signs in for the start of two days of qualification exams Nov. 19. Kopra, Yuri Malenchenko of the Russian Federal Space Agency (Roscosmos) and Tim Peake of the European Space Agency will launch Dec. 15 in the Soyuz TMA-19M spacecraft from the Baikonur Cosmodrome in Kazakhstan for a six-month mission on the International Space Station..NASA/Seth Marcantel

GODDARD SPACE FLIGHT CENTER ASIAN PACIFIC AMERICAN HERITAGE EVENT

code Related

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 arrives at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for a second launch attempt on Sept. 6 to the International Space Station. Seen here is Mission Specialist Heidemarie Stefanyshyn-Piper, who will be making her first flight on the shuttle. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd2014

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 arrives at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for a second launch attempt on Sept. 6 to the International Space Station. Seen here is Mission Specialist Joe Tanner (left) shaking hands with Shuttle Launch Director Mike Leinbach. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd2016

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 arrives at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for a second launch attempt on Sept. 6 to the International Space Station. Seen here is Pilot Christopher Ferguson (left) shaking hands with Shuttle Launch Director Mike Leinbach. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd2015

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 arrives at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for a second launch attempt on Sept. 6 to the International Space Station. Seen here is Mission Specialist Daniel Burbank, who will be making his second flight on the shuttle. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd2013

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 arrives at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for a second launch attempt on Sept. 6 to the International Space Station. Seen here is Pilot Christopher Ferguson, who will be making his first flight on the shuttle. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd2018

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 stop to talk to the media after arriving at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for a second launch attempt on Sept. 6 to the International Space Station. Seen here, left to right, are Mission Specialists Steven MacLean and Joseph Tanner, Commander Brent Jett, Pilot Christopher Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper and Daniel Burbank. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd2012

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 arrives at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for launch on Aug. 27 to the International Space Station. Seen here are (left to right) Mission Specialist Steven MacLean and Pilot Christopher Ferguson being greeted by KSC Associate Director Jim Hattaway and Shuttle Launch Director Mike Leinbach. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd1894

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 stop to talk to the media after arriving at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for a second launch attempt on Sept. 6 to the International Space Station. Seen here, left to right, are Mission Specialist Steven MacLean of the Canadian Space Agency, Commander Brent Jett (at microphone) and Mission Specialist Joseph Tanner. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd2019

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 stop to talk to the media after arriving at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for launch on Aug. 27 to the International Space Station. Seen here, left to right, are Mission Specialists Joseph Tanner, Heidemarie Stefanyshyn-Piper and Steven MacLean (at the microphone), and Commander Brent Jett. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd1899

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 arrives at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for a second launch attempt on Sept. 6 to the International Space Station. Seen here is Mission Specialist Heidemarie Stefanyshyn-Piper (center) shaking hands with Shuttle Launch Director Mike Leinbach as Mission Specialist Joe Tanner looks on. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd2017

description

Summary

KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 arrives at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for a second launch attempt on Sept. 6 to the International Space Station. Seen here is Mission Specialist Heidemarie Stefanyshyn-Piper (center) shaking hands with Shuttle Launch Director Mike Leinbach as Mission Specialist Joe Tanner looks on. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

ov 104 sts 115 crew arrival kennedy space center crew sts mission sts nasa kennedy space center attempt international space station specialist heidemarie stefanyshyn piper mission specialist heidemarie stefanyshyn piper hands director mike leinbach shuttle launch director mike leinbach joe tanner mission specialist joe tanner mission managers atlantis campaign strike passage tropical storm ernesto coast truss segment truss segment port port side system truss system outpost photovoltaic arrays length power preparation delivery science modules science modules two years spacewalks launch pad space shuttle high resolution tropical storm astronauts nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Ov 104 Sts 115 Crew Arrival, Mission Specialist Heidemarie Stefanyshyn Piper, Tropical Storm Ernesto

S134E008119 - STS-134 - STS-134 IDC Focused Inspection of TPS Tiles

KENNEDY SPACE CENTER, FLA. - A Shuttle Training Aircraft (STA) taxis into the parking area of KSC's Shuttle Landing Facility. In the specially configured aircraft, STS-115 Commander Brent Jett and Pilot Christopher Ferguson practiced landing the shuttle this morning. STA practice is part of launch preparations. The STA is a Grumman American Aviation-built Gulf Stream II jet that was modified to simulate an orbiter’s cockpit, motion and visual cues, and handling qualities. In flight, the STA duplicates the orbiter’s atmospheric descent trajectory from approximately 35,000 feet altitude to landing on a runway. Because the orbiter is unpowered during re-entry and landing, its high-speed glide must be perfectly executed the first time. Mission STS-115 is scheduled to lift off about 12:29 p.m. Sept. 6. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd2033

KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Joseph Tanner adjusts his helmet. Tanner is making his fourth flight on a shuttle. He and other crew members are checking their launch suits and apparatus before the launch on Space Shuttle Atlantis on Aug. 27. Mission STS-115 is scheduled to lift off about 4:30 p.m. Aug. 27. The crew will deliver and install the P3/P4 segment to the port side of the integrated truss system on the International Space Station. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. The mission is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd1933

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1. Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end. The White Room provides entry into the orbiter through the hatch. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Troy Cryder KSC-06pd2050

STS082-405-001 - STS-082 - Flight deck activity during deployment and separation from the HST

CAPE CANAVERAL, Fla. -- Space Shuttle Program Launch Integration Manager Mike Moses looks on proudly as Shuttle Launch Director Mike Leinbach holds up a Discovery banner signed by the STS-133 astronauts, at a news conference held in the Press Site auditorium at NASA's Kennedy Space Center in Florida following today's successful launch of space shuttle Discovery. Shuttle Discovery lifted off at 4:53 p.m. EST. The six-member crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the orbiting outpost. Discovery is flying on its 39th and final mission and is scheduled to be retired following STS-133. This is the 133rd Space Shuttle Program mission and the 35th shuttle voyage to the space station. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2011-1699

S115E05643 - STS-115 - Stefanyshyn-Piper performs first EVA during STS-115 / Expedition 13 joint operations

Columbia, SC, August 31, 2006 -- FEMA Operations Chief Dan Griffiths (arms crossed, left) and other representatives watch the evening conference call with FEMA Director David Paulison in the Mobile Emergency Operations Vehicle (MEOV). FEMA has deployed the Emergency Response Teams in preparation for the landfall of Tropical Storm Ernesto. Mark Wolfe/FEMA

STS082-405-012 - STS-082 - Flight deck activity during deployment and separation from the HST

KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions on landing the slidewire baskets, used during emergency egress from the launch pad. From left are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper, Commander Brent Jett, and Mission Specialists Daniel Burbank, Chris Ferguson and Steven MacLean, who is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston KSC-06pd1783

KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions on landing the slidewire baskets, used during emergency egress from the launch pad. Visible from left are Pilot Chris Ferguson, Mission Specialist Joseph Tanner, Commander Brent Jett, Mission Specialist Steven MacLean, who is with the Canadian Space Agency. Partially hidden behind them are Mission Specialists Heidemarie Stefanyshyn-Piper and Daniel Burbank. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston KSC-06pd1784

STS113-704-067 - STS-113 - FWD view of the ISS taken during STS-113

Topics

ov 104 sts 115 crew arrival kennedy space center crew sts mission sts nasa kennedy space center attempt international space station specialist heidemarie stefanyshyn piper mission specialist heidemarie stefanyshyn piper hands director mike leinbach shuttle launch director mike leinbach joe tanner mission specialist joe tanner mission managers atlantis campaign strike passage tropical storm ernesto coast truss segment truss segment port port side system truss system outpost photovoltaic arrays length power preparation delivery science modules science modules two years spacewalks launch pad space shuttle high resolution tropical storm astronauts nasa