visibility Similar

STS-134 - LAUNCH - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. – This aerial view shows the Rocket Garden at the KSC Visitor Complex. A hallmark of the Complex, the display features eight authentic rockets from the past and a Mercury-Atlas rocket similar to one that lalunched John Glenn into space in 1962. 03pd2213

CAPE CANAVERAL, Fla. – This is an aerial view of space shuttle Discovery bolted to the top of a Shuttle Carrier Aircraft SCA on the ramp of the Shuttle Landing Facility SLF at NASA’s Kennedy Space Center in Florida. Discovery's last crew members are expected to be at the SLF, along with Kennedy employees and guests, as the center says goodbye to the agency's most-flown shuttle on April 17. The SCA, designated NASA 905, will ferry Discovery to the Washington Dulles International Airport in Virginia, after which the shuttle will be moved for public display in the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center on April 19. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition. Photo credit: NASA/Kim Shiflett KSC-2012-2311

STS-131 - EOM - Public domain NASA photogrpaph

Aerial of Sutro Baths - Public Domain image, National Parks Gallery

Long Exposure Photos of VAB. NASA public domain image. Kennedy space center.

STS-131 - LAUNCH - Public domain NASA photogrpaph

Rescue technician course trainees practice ascending

CAPE CANAVERAL, Fla. – Space shuttle Atlantis is transported along Kennedy Parkway at NASA's Kennedy Space Center in Florida on its 10-mile journey to the Kennedy Visitor Complex where it will be put on public display. As part of transition and retirement of the Space Shuttle Program, Atlantis is to be displayed at Kennedy's Visitor Complex beginning in the summer of 2013. Over the course of its 26-year career, Atlantis traveled 125,935,769 miles during 307 days in space over 33 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Kim Shiflett KSC-2012-6010

code Related

KENNEDY SPACE CENTER, FLA. - Ted Mosteller (right), NASA test director, briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis KSC-06pd1201

KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (right) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis KSC-06pd1202

KENNEDY SPACE CENTER, FLA. - An overview of the new Firing Room 4 shows the expanse of computer stations and the various operations the facility will be able to manage. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis KSC-06pd1204

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-115 Mission Specialists Joe Tanner, Heidemarie Stefanyshyn-Piper, Steve Maclean and Dan Burbank are fit checking sequential shunt unit, electronics control unit and multiplexer demultiplexer launch to activation multi-layer installation blankets in a large Orbital Replaceable Unit transfer bag. They and other crew members are at the center for Crew Equipment Interface Test activities. Equipment familiarization is a routine part of astronaut training and launch preparations. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1182

KENNEDY SPACE CENTER, FLA. - In Firing Room 4 of the Launch Control Center, Shuttle Launch Director Mike Leinbach (foreground) cheers over the successful liftoff of Space Shuttle Discovery, watching it rocket through the sky on mission STS-121 -- the first ever Independence Day launch of a space shuttle. At far left is Stephanie Stilson, NASA flow director in the Process Integration Branch of the Shuttle Processing Directorate, who began conducting Discovery's processing operations in December 2000. Liftoff was on-time at 2:38 p.m. EDT. During the 12-day mission, the STS-121 crew of seven will test new equipment and procedures to improve shuttle safety, as well as deliver supplies and make repairs to the International Space Station. Landing is scheduled for July 16 or 17 at Kennedy's Shuttle Landing Facility. Photo credit: NASA/Kim Shiflett KSC-06pd1420

KENNEDY SPACE CENTER, FLA. - KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-115 Mission Specialist Joseph Tanner is practicing folding a sequential shunt unit launch to activation multilayer installation blanket. He and other crew members are at the center for Crew Equipment Interface Test activities. Equipment familiarization is a routine part of astronaut training and launch preparations. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1176

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-115 Mission Specialists (foreground, from left) Daniel Burbank, Joseph Tanner, Heidemarie Stefanyshyn-Piper, and Steve Maclean are fit checking a sequential shunt unit, electronics control unit and multiplexer de-multiplexer launch to activation multi-layer installation blankets in a large Orbital Replaceable Unit transfer bag. They and other crew members are at the center for Crew Equipment Interface Test activities. Equipment familiarization is a routine part of astronaut training and launch preparations. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1183

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-115 Mission Specialist Joseph Tanner is practicing folding a sequential shunt unit launch to activation multilayer installation blanket He and other crew members are at the center for Crew Equipment Interface Test activities. Equipment familiarization is a routine part of astronaut training and launch preparations. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1179

KENNEDY SPACE CENTER, FLA. -- In the firing room of the Launch Control Center at NASA's Kennedy Space Center, Shuttle Launch Director Mike Leinbach and Assistant Launch Director Doug Lyons applaud the mission team for the successful launch of space shuttle Discovery on mission STS-120. AT right is NASA Flow Director Stephanie Stilson. Liftoff was on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony. During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Kim Shiflett KSC-07pd2954

KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (center) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis KSC-06pd1203

description

Summary

KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (center) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

lcc fr 4 kennedy space center test director nasa test director mosteller briefs media room renovations two years orbiter walls floors humidity control humidity control fire suppression fire suppression systems consoles support tables support tables computer stations computer stations communication communication systems laptop ports laptop computer ports power network connections computer network connections checkout monitor subsystem monitor subsystem launch system survivability project survivability project space alliance directorate system directorate dimitri gerondidakis space shuttle high resolution power plants machinery nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Nasa Test Director, Humidity Control, Computer Stations

CAPE CANAVERAL, Fla. –Outredgeous red romaine lettuce plants grow inside in a prototype VEGGIE flight pillow. The bellows of the hardware have been lowered to better observe the plants. A small temperature and relative humidity data logger is placed between the pillows small white box, central. U.S. astronauts living and working aboard the International Space Station are going to receive a newly developed Vegetable Production System VEGGIE. VEGGIE is set to launch aboard SpaceX's Dragon capsule on NASA's third Commercial Resupply Services mission targeted to launch Dec. 9 from Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida. Photo credit: NASA/Gioia Massa KSC-2013-3566

map from "North Atlantic Directory. The physical geography and meteorology of the North Atlantic; together with sailing directions for the principal ports and harbours of Europe, N. America, N. Africa, and the N. Atlantic Islands, etc"

CONSTRUCTION OF FLOORS - WALLS - CEILINGS IN TEST CELLS CE-26 AND CE-28 IN THE ENGINE RESEARCH BUILDING ERB

The Alabama, northwest corner Riverside Drive and 127th Street; Plan of first floor; Plan of upper floos; The Palisades; Looking South from 'The Alabama' (seeing Grant's Tomb on the left and' Historic' Claremont on the right.)

MAIN INSTRUMENT PANEL - CONSOLES ON C-131 AND C-340 AIRCRAFT

A view of the NASA Space Shuttle Program Solid Rocket Booster Deceleration Subsystem, after a parachute drop test at the National Parachute Test Range

S130E009086 - STS-130 - Node 3 Deck Alcove Internal View

Fire Suppression: Aerial Slurry Drops - Arkansas

Irving Arms. Plan of first floor; Plan of upper floors.

The Allenel, 310 West 93rd Street; Plan of first floor; Plan of upper floors.

Oslo. Christiania. Havnen. Blyantskisse av John Edy: Drawings, Norway, 1800. "Mr Ankers House, Paleet, med strandpaviljong sett fra havna, tollboden." Skissealbum utlånt av Deichmanske bibliotek.

Sailors assigned to the Tomahawk Strike Team aboard USS Shiloh (CG 67) man their consoles in the Combat Information Center (CIC) during a Tomahawk drill.

Topics

lcc fr 4 kennedy space center test director nasa test director mosteller briefs media room renovations two years orbiter walls floors humidity control humidity control fire suppression fire suppression systems consoles support tables support tables computer stations computer stations communication communication systems laptop ports laptop computer ports power network connections computer network connections checkout monitor subsystem monitor subsystem launch system survivability project survivability project space alliance directorate system directorate dimitri gerondidakis space shuttle high resolution power plants machinery nasa