visibility Similar

CAPE CANAVERAL, Fla. – In the Orbiter Processing Facility bay 3, space shuttle Discovery's robotic arm is moved into place for installation in the payload bay. Scheduled to launch on the STS-119 mission, Discovery will carry the S6 truss segment to complete the 361-foot-long backbone of the International Space Station. The truss includes the fourth pair of solar array wings and electronics that convert sunlight to power for the orbiting laboratory. A launch date has not yet been determined. Photo credit: NASA/Jim Grossmann KSC-08pd1857

KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility help move the body flap into position on the orbiter Discovery. The body flap is an aluminum structure consisting of ribs, spars, skin panels and a trailing edge assembly. It thermally shields the three main engines during entry and provides pitch control trim during landing approach. Discovery is being processed for launch on the first Return to Flight mission, STS-114. KSC-04pd0459

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, the payload bay doors are being closed on space shuttle Atlantis. The designated shuttle for the STS-129 mission, Atlantis will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. Atlantis is targeted to launch Nov. 12. Photo credit: NASA/Jack Pfaller KSC-2009-5251

Korean workers clean equipment at the AAFES Regional Bakery located at Camp Market, Bub'yon, Korea on Oct. 15, 1998. Each year the bakery supplies over 3 million pounds of baked goods to US Forces Korea dining facilities, AAFES outlets, Commissaries, and Naval ships

Hollywood actors Seth Green and Clare Grant visit NASA Goddard Space Flight Center

STS-132 ATLANTIS ARM LIFT & INSTALL 2010-1316

184-inch cyclotron, calutron conversion, Robert Thornton. Photo taken 9/14/1946. 184"-381 Principal Investigator/Project: Analog Conversion Project

EXPERIMENT SET UP AT WEST END OF TANK 5

Crew capsules of several Mine Resistant Ambush Protected

code Related

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 1 at NASA Kennedy Space Center, the remote manipulator system, or boom, is lowered into Atlantis’ payload bay for installation. Atlantis is the designated orbiter for mission STS-115, the 19th assembly flight to the International Space Station. The payload includes the P3/P4 solar arrays. The launch planning window has not been determined yet for STS-115. KSC-06pd0013

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 1 at NASA Kennedy Space Center, engineers stand by as the remote manipulator system, or boom, is lowered toward Atlantis’ payload bay for installation. Atlantis is the designated orbiter for mission STS-115, the 19th assembly flight to the International Space Station. The payload includes the P3/P4 solar arrays. The launch planning window has not been determined yet for STS-115. KSC-06pd0012

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 1 at NASA Kennedy Space Center, engineers finish attaching the remote manipulator system, or boom, in Atlantis’ payload bay. Atlantis is the designated orbiter for mission STS-115, the 19th assembly flight to the International Space Station. The payload includes the P3/P4 solar arrays. The launch planning window has not been determined yet for STS-115. KSC-06pd0015

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 1 at NASA Kennedy Space Center, overhead cranes lift the remote manipulator system, or boom, to move it to Atlantis’ payload bay for installation. Atlantis is the designated orbiter for mission STS-115, the 19th assembly flight to the International Space Station. The payload includes the P3/P4 solar arrays. The launch planning window has not been determined yet for STS-115. KSC-06pd0011

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 1 at NASA Kennedy Space Center, the remote manipulator system, or boom, is lifted off a stand via overhead cranes. The boom will be installed in Atlantis’ payload bay. Atlantis is the designated orbiter for mission STS-115, the 19th assembly flight to the International Space Station. The payload includes the P3/P4 solar arrays. The launch planning window has not been determined yet for STS-115. KSC-06pd0010

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Orbiter Processing Facility Bay 3, technicians install a remote manipulator system, or space shuttle arm, previously installed on the orbiter Atlantis, in Discovery’s payload bay. The arms were switched because the arm that was installed on Atlantis has special instrumentation to gather loads data from the second return-to-flight mission, STS-121. Discovery is the designated orbiter to fly on STS-121. scheduled to launch no earlier than May 2006. KSC-05pd2490

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Orbiter Processing Facility Bay 3, a remote manipulator system, or space shuttle arm, previously installed on the orbiter Atlantis, is being installed in Discovery’s payload bay. The arms were switched because the arm that was installed on Atlantis has special instrumentation to gather loads data from the second return-to-flight mission, STS-121. Discovery is the designated orbiter to fly on STS-121. scheduled to launch no earlier than May 2006. KSC-05pd2488

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, STS-115 Pilot Christopher Ferguson inspects the window of the cockpit in the orbiter Atlantis. The crew is at KSC for Crew Equipment Interface Test activities, which involve equipment familiarization and inspection, a routine part of astronaut training and launch preparations. The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station. The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1220

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Orbiter Processing Facility Bay 3, technicians install a remote manipulator system, or space shuttle arm, previously installed on the orbiter Atlantis, in Discovery’s payload bay. The arms were switched because the arm that was installed on Atlantis has special instrumentation to gather loads data from the second return-to-flight mission, STS-121. Discovery is the designated orbiter to fly on STS-121. scheduled to launch no earlier than May 2006. KSC-05pd2491

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 1 at NASA Kennedy Space Center, engineers begin attaching the remote manipulator system, or boom, in Atlantis’ payload bay. Atlantis is the designated orbiter for mission STS-115, the 19th assembly flight to the International Space Station. The payload includes the P3/P4 solar arrays. The launch planning window has not been determined yet for STS-115. KSC-06pd0014

description

Summary

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 1 at NASA Kennedy Space Center, engineers begin attaching the remote manipulator system, or boom, in Atlantis’ payload bay. Atlantis is the designated orbiter for mission STS-115, the 19th assembly flight to the International Space Station. The payload includes the P3/P4 solar arrays. The launch planning window has not been determined yet for STS-115.

label_outline

Tags

kennedy space center orbiter bay facility bay nasa kennedy space center engineers manipulator system manipulator system boom atlantis payload atlantis payload bay sts mission sts international space station arrays launch high resolution nasa florida cape canaveral
date_range

Date

10/01/2006
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Nasa Kennedy Space Center, Boom, Manipulator System

41C-36-1612 - STS-41C - Deployment of the LDEF

S125E008514 - STS-125 - Survey View of the HST taken on Flight Day 7

Boom Operators point of view showing a US Air Force (USAF) B-2 Spirit aircraft approaching the refueling boom of a Alaskan Air National Guard KC-135 Stratotanker aircraft while conducting refueling operations during Exercise NORTHERN EDGE 02. Northern Edge '02 is an annual joint training exercise held in Alaska designed to exercise joint operations techniques, procedures and enhance interoperability among the services

S125E008893 - STS-125 - Survey View of the HST taken on Flight Day 7

S125E009121 - STS-125 - Survey View of the HST taken on Flight Day 7

STS086-729-026 - STS-086 - Views taken during the STS-86 EVA

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis. Inspection and maintenance of the crew module windows is standard procedure between shuttle missions. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14. Photo credit: NASA/Glenn Benson KSC-2010-1082

S125E009321 - STS-125 - Survey View of the HST taken on Flight Day 7

S125E008999 - STS-125 - Survey View of the HST taken on Flight Day 7

GENERAL ELECTRIC GE AND BB&N TEST CONFIGURATION INST SCOOP AND MICROPHONE BOOM ARRAY

STS052-45-026 - STS-052 - Views of the remote manipulator system mounted witness plates.

STS079-788-098 - STS-079 - ODS in Atlantis payload bay after undocking with Mir

Topics

kennedy space center orbiter bay facility bay nasa kennedy space center engineers manipulator system manipulator system boom atlantis payload atlantis payload bay sts mission sts international space station arrays launch high resolution nasa florida cape canaveral