visibility Similar

code Related

KENNEDY SPACE CENTER, FLA. - STS-119 Mission Specialists Carlos Noriega (center) and Michael Gernhardt (left) discuss mission information during a Crew Equipment Interface Test activity. The mission will deliver the fourth and final set of U.S. solar arrays along with the fourth starboard truss segment, the S6 truss. Mission STS-119 is scheduled to launch in January 2004. KSC-03pd0034

KENNEDY SPACE CENTER, FLA. - During a Crew Equipment Interface Test activity, STS-119 Commander Steven Lindsey (center) and Mission Specialist Carlos Noriega (right) listen to instructions on the equipment that will be part of the mission. Scheduled to launch in January 2004, the mission will deliver the fourth and final set of U.S. solar arrays along with the fourth starboard truss segment, the S6 truss. KSC-03pd0045

KENNEDY SPACE CENTER, FLA. - The mission STS-119 crew talk about the mission during a Crew Equipment Interface Test activity. From the left are Mission Specialist Michael Gernhardt, Commander Steven Lindsey, Pilot Mark Kelly and Mission Carlos Noriega. The mission will deliver the fourth and final set of U.S. solar arrays along with the fourth starboard truss segment, the S6 truss. Mission STS-119 is scheduled to launch in January 2004. KSC-03pd0035

KENNEDY SPACE CENTER, FLA. - During a Crew Equipment Interface Test activity, STS-119 Commander Steven Lindsey watches as Mission Specialist Carlos Noriega works with a tool on the equipment that will be part of the mission. Scheduled to launch in January 2004, the mission will deliver the fourth and final set of U.S. solar arrays along with the fourth starboard truss segment, the S6 truss. KSC-03pd0044

KENNEDY SPACE CENTER, FLA. -- STS-115 Mission Specialist Daniel Burbank checks out equipment during Crew Equipment Interface Test activities in the Space Station Processing Facility. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Endeavour is scheduled for May 23, 2003. KSC-03pd0188

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test activities in the Space Station Processing Facility, STS-115 Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner look at equipment. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Endeavour is scheduled for May 23, 2003. KSC-03pd0187

KENNEDY SPACE CENTER, FLA. - STS-118 crew members are in the Space Station Processing Facility to become familiar with equipment for their mission. At center is Mission Specialist Barbara Morgan; next to her at right is Commander Scott Kelly. The mission will be delivering the third starboard truss segment, the ITS S5, to the International Space Station, and a SPACEHAB Single Cargo Module with supplies and equipment. Launch date is under review. KSC-03pd1190

KENNEDY SPACE CENTER, FLA. - STS-118 Commander Scott Kelly is seen during Crew Equipment Interface Test activities in the Space Station Processing Facility. The mission to the International Space Station will be delivering the third starboard truss segment, the ITS S5, which will be attached to the station, and a SPACEHAB Single Cargo Module with supplies and equipment. Launch aboard Space Shuttle Columbia is scheduled for Nov. 13, 2003. KSC-03pd0038

KENNEDY SPACE CENTER, FLA. -- KSC technicians supervise the transfer of the Integrated Equipment Assembly (IEA), one of two major components of the Starboard 6 (S6) truss segment for the International Space Station (ISS), onto a cargo transporter following its arrival at the Shuttle Landing Facility. The IEA will be joined to its companion piece, the Long Spacer, before launch early in 2004. The S6 truss segment will be the 11th and final piece of the Station's Integrated Truss Structure and will support the fourth and final set of solar arrays, batteries, and electronics. KSC-02pd1914

KENNEDY SPACE CENTER, FLA. - During a Crew Equipment Interface Test activity, STS-119 Mission Specialist Michael Gernhardt works on equipment that will be part of the mission. Scheduled to launch in January 2004, the mission will deliver the fourth and final set of U.S. solar arrays along with the fourth starboard truss segment, the S6 truss. KSC-03pd0043

description

Summary

KENNEDY SPACE CENTER, FLA. - During a Crew Equipment Interface Test activity, STS-119 Mission Specialist Michael Gernhardt works on equipment that will be part of the mission. Scheduled to launch in January 2004, the mission will deliver the fourth and final set of U.S. solar arrays along with the fourth starboard truss segment, the S6 truss.

Nothing Found.

label_outline

Tags

kennedy space center crew equipment interface activity crew equipment interface test activity sts specialist michael gernhardt mission specialist michael gernhardt works arrays truss segment truss segment high resolution nasa florida cape canaveral
date_range

Date

09/01/2003
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Crew Equipment Interface Test Activity, Activity, Truss Segment

STS069-347-034 - STS-069 - Astronaut Gernhardt on middeck

Two soldiers from the 155th Transportation Company hold onto guide ropes as a container of chemical munitions is hoisted from the deck of the Military Sealift Command auxiliary crane ship GOPHER STATE (T-ACS-4) during Operation Steel Box. The munitions will be taken to the U.S. Army Chemical Activity on the atoll for storage and disposal

Office of the Administrator (Stephen L. Johnson) - EPA's Office of Water Earth Day 2006 Activity at Rock Creek Park [412-APD-178-04-21-06_RockCreek_073.jpg]

STS091-358-024 - STS-091 - Crewmember activity in the middeck including a meal

Office of the Administrator (Stephen L. Johnson) - EPA's Office of Water Earth Day 2006 Activity at Rock Creek Park [412-APD-178-04-21-06_RockCreek_114.jpg]

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank is practicing folding a sequential shunt unit launch to activation multilayer installation blanket. Burbank and other crew members are at the center for Crew Equipment Interface Test activities. Equipment familiarization is a routine part of astronaut training and launch preparations. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1181

STS069-301-019 - STS-069 - Astronaut Gernhardt on middeck

KENNEDY SPACE CENTER, FLA. -- James Stickley and Kristin Rumpf, both with United Space Alliance - Main Propulsion System Engineering, discuss procedures about welding the minute cracks on Endeavour's flow liners. Endeavour is scheduled to fly on mission STS-113 in November. The mission payload is the P1 Integrated Truss Structure, the first portside truss to go to the International Space Station, and will be attached to the central truss segment, S0, on the Station. Also additional cooling radiators will be delivered but will remain stowed until flight 12A.1. KSC-02pd1204

[Assignment: 48-DPA-02_21_08_SIO_K_SC_Bass_Mike] Segment of ESPN Radio's Mike and Mike Show, [co-hosted by Mike Greenberg and Mike Golic,] at the Bassmasters Classic professional fishing tournament, Greenville, South Carolina, [with guest appearance by] Secretary Dirk Kempthorne [48-DPA-02_21_08_SIO_K_SC_Bass_Mike_IOD_0966.JPG]

S82E5908 - STS-082 - HST,survey of solar arrays and telescope surface

Crew members observe activity on deck from the flight control center aboard the amphibious assault ship USS PELELIU (LHA 5) during PACEX '89

SPC Michael Brumley of the 155th Transportation Company radios instructions to the crane operator as soldiers hook up a container of chemical munitions in the hold of the Military Sealift Command auxiliary crane ship GOPHER STATE (T-ACS-4) during Operation Steel Box. The munitions will be taken to the U.S. Army Chemical Activity on the atoll for storage and disposal

Topics

kennedy space center crew equipment interface activity crew equipment interface test activity sts specialist michael gernhardt mission specialist michael gernhardt works arrays truss segment truss segment high resolution nasa florida cape canaveral