visibility Similar

code Related

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, workers use a new engine hyster, built by Rocketdyne, to remove an engine on an orbiter. . KSC-02pd1963

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, workers use a new engine hyster, built by Rocketdyne, to remove an engine on an orbiter. . KSC-02pd1965

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, an orbiter main engine is secured on the new engine hyster, built by Rocketdyne, used to remove it from the orbiter. . KSC-02pd1966

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, an orbiter main engine is lifted by a new engine hyster, built by Rocketdyne, that is used to remove it from the orbiter. . KSC-02pd1967

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, an actuator is set up on a table for a 3D digital scan. There are two actuators per engine on the Shuttle, one for pitch motion and one for yaw motion. The Space Shuttle Main Engine hydraulic servoactuators are used to gimbal the main engine.

KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility get ready to measure the alignment of the bearings on the rudder speed brake actuators sitting on the floor in the foreground. The actuators move an orbiter’s rudder, speed brake, elevons and main engines during flight.

KENNEDY SPACE CENTER, FLA. -- Discovery rolls from the Vehicle Assembly Building to begin Orbiter Major Modifications. KSC-02pd1202

KENNEDY SPACE CENTER, FLA. - A member of the Columbia Reconstruction Project team examines small pieces of debris shipped to KSC and brought to the RLV Hangar. The team is identifying pieces and placing them on a grid approximating the shape of the orbiter. About 25 percent of the orbiter has been delivered to the hangar. KSC-03pd0848

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, Dan Clark, with KSC Boeing, operates the camera for a 3D digital scan of the actuator on the table. There are two actuators per engine on the Shuttle, one for pitch motion and one for yaw motion. The Space Shuttle Main Engine hydraulic servoactuators are used to gimbal the main engine.

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, workers use a new engine hyster, built by Rocketdyne, to remove an engine on an orbiter. . KSC-02pd1964

description

Summary

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, workers use a new engine hyster, built by Rocketdyne, to remove an engine on an orbiter. .

Nothing Found.

label_outline

Tags

kennedy space center orbiter workers workers use engine hyster engine hyster rocketdyne high resolution nasa florida cape canaveral
date_range

Date

16/12/2002
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Workers Use, Hyster, Rocketdyne

QUIET ENGINE C - APPROACH INTAKE - OPEN FAN NOZZLE

20 INCH FAN ENGINE MODEL BELLMOUTH CONFIGURATION - ACOUSTIC MUFFLER

A close-up of the exterior of the cockpit area of a B-2 Spirit, stealth bomber, from the 509th Bomb Wing, inside the hangar. Inside the cockpit pilots can be seen climbing into their seats prior to engine start. Global Guardian is designed to exercise the ability of USSTRATCOM and its component forces to effectively deter a military attack against the United States and employ forces as directed by the National Command Authority

Tech. Sgt. Robert Fredenberg, 332nd Expeditionary

Corporal Leonard Rodriguez, USMC, (right) and Lance Corporal Andres Almaguer, USMC, (left), make adjustments on the Allison T56-A-15 turboprop engine. The Marines are in the process of swapping an engine on a Marine KC-130 Hercules at a forward operating base in the Operation ENDURING FREEDOM area of operations. Both are members of the Marine Aerial Refueler Transport Squadron-352 (VMGR-352), Combined Task Force 58

STS-335 STS-135 ATLANTIS ENGINE-1 MOVE FROM ENGINE SHOP TO OPF-1 2010-5806

170814-N-MJ645-175 ARABIAN GULF (August 14, 2017) Aviation

US Air Force (USAF) Captain (CPT) Eric Armentrout, Pilot, 71st Fighter Squadron (FS), 1ST Operation Group (OG), 1ST Fighter Wing (FW), signal to his crew chief during the engine start sequence of his F-16 Fighting Falcon fighter aircraft prior to flying a sortie from Langley Air Force Base (AFB), Virginia (VA), as part of Operation NOBLE EAGLE, which is direct US military operations in support of homeland defense efforts

U.S. Air Force sheet metal technicians with the 116th

Navy Shipyard interior, Karlskrona, Sweden IV1042

STAFF SGT. Penland, 317th Field Maintenance Squadron, uses a forklift to move a C-130 Hercules engine into place during Exercise Market Square III

J-85 F-106 AIRPLANE SPIKE INLET 40-60 TAKE OFF CONFIGURATION AT HANGAR APRON QUIET ENGINE SITE

Topics

kennedy space center orbiter workers workers use engine hyster engine hyster rocketdyne high resolution nasa florida cape canaveral