visibility Similar

S47-216-004 - STS-047 - Crewmembers in seats in preparation for landing

S49-01-004 - STS-049 - Pilot Kevin Chilton seated at the flight deck pilots station.

STS064-33-004 - STS-064 - MS Meade poses on the flight deck

KENNEDY SPACE CENTER, FLA. - At the Shuttle Landing Facility, STS-121 Commander Steven Lindsey gets ready for a training flight in a Shuttle Training Aircraft (STA). He will be practicing landing the orbiter using the STA, which is a modified Grumman American Aviation-built Gulf Stream II jet that was modified to simulate an orbiter’s cockpit, motion and visual cues, and handling qualities. In flight, the STA duplicates the orbiter’s atmospheric descent trajectory from approximately 35,000 feet altitude to landing on a runway. Because the orbiter is unpowered during re-entry and landing, its high-speed glide must be perfectly executed the first time. Space Shuttle Discovery is scheduled to launch July 1 on mission STS-121. Photo credit: NASA/Kim Shiflett KSC-06pd1071

Kuipers in the Cupola Module. NASA public domain image colelction.

STS053-35-029 - STS-053 - Crewmember in the fwd flight deck sitting in the pilot's seat.

Members of the STS-101 crew gather with families and friends at Patrick Air Force Base before departure for Houston. Mission Specialist Jeffrey N. Williams is joined by his wife, Anna-Marie, and two sons. After landing at 2:20 a.m. EDT May 29, the crew and their families enjoyed the Memorial Day holiday in Florida. The crew returned from the third flight to the International Space Station where they made repairs, transferred cargo and completed a space walk to install and connect several pieces of equipment on the outside of the Space Station KSC-00pp0685

S129E006550 - STS-129 - STS-129 Pilot Wilmore poses for a photo on the FD

S45-03-004 - STS-045 - Mission Specialist Sullivan and pilot Duffy

code Related

KENNEDY SPACE CENTER, FLA. - STS-113 Mission Specialist John Herrington arrives at the KSC Shuttle Landing Facility to get ready for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST. KSC-02pd1684

KENNEDY SPACE CENTER, FLA. - STS-113 Mission Specialist Michael Lopez-Alegria arrives at the KSC Shuttle Landing Facility to get ready for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST. KSC-02pd1683

KENNEDY SPACE CENTER, FLA. - STS-113 Pilot Paul Lockhart arrives at the KSC Shuttle Landing Facility to get ready for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST. KSC-02pd1682

KENNEDY SPACE CENTER, FLA. -- STS-113 Commander James Wetherbee arrives at KSC's Shuttle Landing Facility to get ready for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary objective of the mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major task of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is targeted for no earlier than Nov. 22 between 7 and 11 p.m. EST. KSC-02pd1767

KENNEDY SPACE CENTER, FLA. - The STS-113 crew poses for a photo after their arrival at the KSC Shuttle Landing Facility to prepare for launch. From left are Commander James Wetherbee, Pilot Paul Lockhart, and Mission Specialists Michael Lopez-Alegria and John Herrington. The primary mission of STS-113 is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. In addition, the major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST. KSC-02pd1690

KENNEDY SPACE CENTER, FLA. -- STS-113 Commander James Wetherbee finishes suiting up before leaving for Launch Pad 39A. Wetherbee will be making his sixth Shuttle flight. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for 8:15 p.m. EST. KSC-02pd1783

KENNEDY SPACE CENTER, FLA. - STS-113 Mission Specialist Michael Lopez-Alegria suits up for launch. He will be making his third Shuttle flight. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for 8:15 p.m. EST. KSC-02pd1788

KENNEDY SPACE CENTER, FLA. -- STS-113 Commander James Wetherbee makes a brief statement upon his arrival at KSC's Shuttle Landing Facility to prepare for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary objective of the mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major task of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is targeted for no earlier than Nov. 22 between 7 and 11 p.m. EST. KSC-02pd1768

KENNEDY SPACE CENTER, FLA. -- STS-113 Mission Specialist John Herrington suits up before launch. This will be his first Shuttle flight. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 p.m. EST. KSC-02pd1700

KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee arrives at the KSC Shuttle Landing Facility to get ready for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST. KSC-02pd1681

description

Summary

KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee arrives at the KSC Shuttle Landing Facility to get ready for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center sts commander james wetherbee commander james wetherbee ksc shuttle american international space station expedition crew earth objective delivery port truss port side spacewalks three spacewalks equipment launch endeavour space shuttle endeavour mission sts midnight space shuttle high resolution astronauts nasa
date_range

Date

07/11/2002
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Midnight, Ksc Shuttle, Objective

STS113-353-033 - STS-113 - Wetherbee, in his LES, reviews checklist on Endeavour's FFD during STS-113

S102E5027 - STS-102 - MS Richards during hardware checkout on the flight deck

A Marine from CSSE (Combat Service Support Element) uses night vision goggles during a night mobility course performed at the MOUT (Military Operations in Urban Terrain) facility during LOE 1 (Limited Objective Experiment 1). Urban Warrior is the U.S. Marine Corps Warfighting Laboratory's series of limited objective experiments examining new urban tactics and experimental technologies

STS102-361-033 - STS-102 - Flight deck activity during ISS flyaround

S32-04-017 - STS-032 - STS-32 crew activities

KENNEDY SPACE CENTER, Fla. -- The landing lights on Runway 15 cast a glow as Space Shuttle Atlantis approaches touchdown on KSC’s Shuttle Landing Facility to complete the 9-day, 20-hour, 9-minute-long STS-101 mission. At the controls are Commander James D. Halsell Jr. and Pilot Scott “Doc” Horowitz. Also onboard the orbiter are Mission Specialists Mary Ellen Weber, James S. Voss, Jeffrey N. Williams, Susan J. Helms and Yury Usachev of Russia. The crew is returning from the third flight to the International Space Station. This was the 98th flight in the Space Shuttle program and the 21st for Atlantis, also marking the 51st landing at KSC, the 22nd consecutive landing at KSC, the 14th nighttime landing in Shuttle history and the 29th in the last 30 Shuttle flights. Main gear touchdown was at 2:20:17 a.m. EDT May 29 , landing on orbit 155 of the mission. Nose gear touchdown was at 2:20:30 a.m. EDT, and wheel stop at 2:21:19 a.m. EDT KSC00pp0675

S102E5116 - STS-102 - Wetherbee welcomes Gidzenko to the STS-102 crew

S39-85-069 - STS-039 - STS-39 AFP-675 CIRRIS-1A in OV-103's payload bay (PLB)

STS113-339-005 - STS-113 - Wetherbee poses in the Zvezda SM during STS-113

STS113-338-020 - STS-113 - Wetherbee, Lockhart and Herrington, in LES, prep for landing on Endeavour's FD during STS-113

S39-10-019 - STS-039 - STS-39 payload

A full moon is seen in the dark sky. Moon full moonlight.

Topics

kennedy space center sts commander james wetherbee commander james wetherbee ksc shuttle american international space station expedition crew earth objective delivery port truss port side spacewalks three spacewalks equipment launch endeavour space shuttle endeavour mission sts midnight space shuttle high resolution astronauts nasa