visibility Similar

KENNEDY SPACE CENTER, FLA. - From Launch Pad 39B, Space Shuttle Atlantis begins rolling back to the Vehicle Assembly Building. First motion was at 10:04 a.m. EDT. First motion off the pad was at 10:04 a.m. EDT. The rollback is a safety precaution as the area waits for the arrival of Tropical Storm Ernesto. The storm is forecast to be bringing 58-mph to 70-mph winds in the next 24 hours. The shuttle will be moved into high bay 2, on the southwest side of the VAB, for protection from the storm. Photo credit: NASA/Jack Pfaller KSC-06pd1973

KENNEDY SPACE CENTER, FLA. - In preparation for the July 1 launch of Space Shuttle Discovery on mission STS-121, the Launch Pad 39B rotating service structure (RSS) enclosing the shuttle rolls away. The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge. The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration. This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1301

KENNEDY SPACE CENTER, FLA. - After reversing its direction to the Vehicle Assembly Building, Space Shuttle Atlantis nears Launch Pad 39B. The shuttle had been moved off the launch pad due to concerns about the impact of Tropical Storm Ernesto, expected within 24 hours. The forecast of lesser winds expected from Ernesto and its projected direction convinced Launch Integration Manager LeRoy Cain and Shuttle Launch Director Mike Leinbach to return the shuttle to the launch pad. Photo credit: NASA/Kim Shiflett KSC-06pd1998

KENNEDY SPACE CENTER, Fla. -- Atop the crawler/transporter, the Space Shuttle orbiter Atlantis rolls out to Launch Complex 39A in preparation for mission STS-86, which is targeted for a September launch. STS-86 will be the seventh of nine planned dockings of the Space Shuttle orbiter with the Russian Space Station Mir KSC-97PC1247

STS-135 - LAUNCH - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. -- In the early morning light on Launch Pad 39A, Space Shuttle Atlantis is revealed after rollback of the rotating service structure (at left). The shuttle is being rolled back to the Vehicle Assembly Building where it will be examined for hail damage. A severe thunderstorm with golf ball-sized hail caused divots in the giant tank's foam insulation and minor surface damage to about 26 heat shield tiles on the shuttle's left wing. Further evaluation of the tank is necessary to get an accurate accounting of foam damage and determine the type of repair required and the time needed for that work. A new target launch date has not been determined, but teams will focus on preparing Atlantis for liftoff in late April. Photo credit: NASA/Amanda Diller KSC-07pd0553

STS-135 - LAUNCH - Public domain NASA photogrpaph

STS-135 - LAUNCH - Public domain NASA photogrpaph

STS-135 - Public domain NASA photogrpaph

code Related

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, resting on the Mobile Launcher Platform, sits on Launch Pad 39A after its slow rollout from the Vehicle Assembly Building. At left is the White Room, situated at the end of the orbiter access arm, which, when extended, provides entry into the orbiter for the crew. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1520

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, resting on the Mobile Launcher Platform, sits on Launch Pad 39A after its slow rollout from the Vehicle Assembly Building. On the left is the Rotating Service Structure, which is still open. The RSS will rotate around the Shuttle to provide protected access to the orbiter. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1522

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, resting on the Mobile Launcher Platform, sits on Launch Pad 39A after its slow rollout from the Vehicle Assembly Building. At left is the White Room, situated at the end of the orbiter access arm, which, when extended, provides entry into the orbiter for the crew. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1521

KENNEDY SPACE CENTER, FLA. -- Against a lavender and pink dawn sky, Space Shuttle Endeavour inches up the ramp of Launch Pad 39A after its rollout from the Vehicle Assembly Building. The Shuttle sits atop the Mobile Launcher Platform and is transported by the crawler-transporter underneath. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1515

KENNEDY SPACE CENTER, FLA. - Against a lavender and pink dawn sky, Space Shuttle Endeavour inches up the ramp of Launch Pad 39A after its rollout from the Vehicle Assembly Building. The Shuttle sits atop the Mobile Launcher Platform and is transported by the crawler-transporter underneath. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1514

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour approaches the Rotating and Fixed Service Structures on Launch Pad 39A after rollout from the Vehicle Assembly Building. The Shuttle sits atop the Mobile Launcher Platform and is transported by the crawler-transporter underneath. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1519

KENNEDY SPACE CENTER, FLA. -- With a brightening sky at dawn in the background, Space Shuttle Endeavour nears the top of Launch Pad 39A after rollout from the Vehicle Assembly Building. The Shuttle sits atop the Mobile Launcher Platform and is transported by the crawler-transporter underneath. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1517

KENNEDY SPACE CENTER, FLA. -- A lavender, pink and yellow dawn sky silhouettes Space Shuttle Endeavour as it inches up the ramp toward the top of Launch Pad 39A. The Shuttle sits atop the Mobile Launcher Platform and is transported by the crawler-transporter underneath. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1516

KENNEDY SPACE CENTER, FLA. -- In the early morning, Space Shuttle Endeavour approaches the Rotating and Fixed Service Structures on Launch Pad 39A after rollout from the Vehicle Assembly Building. The Shuttle sits atop the Mobile Launcher Platform and is transported by the crawler-transporter underneath. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1518

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, resting on the Mobile Launcher Platform, sits on Launch Pad 39A after its slow rollout from the Vehicle Assembly Building. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1523

description

Summary

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, resting on the Mobile Launcher Platform, sits on Launch Pad 39A after its slow rollout from the Vehicle Assembly Building. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth.

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

endeavour sts 113 p 1 ceta kennedy space center endeavour mobile launcher platform mobile launcher platform launch pad rollout sts mission sts international space station payloads port truss segment first port truss segment crew equipment translation equipment translation aid ceta cart cart b truss segment expedition return expedition earth space shuttle high resolution nasa
date_range

Date

12/10/2002
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Endeavour Sts 113 P 1 Ceta, Return Expedition, Cart B

S118E08018 - STS-118 - View of MS Mastracchio during a session of STS-118 / Expedition 15 EVA

S135E011202 - STS-135 - Flyaround View of the P3, P1, S0 and S1 Trusses

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank is practicing folding a sequential shunt unit launch to activation multilayer installation blanket. Burbank and other crew members are at the center for Crew Equipment Interface Test activities. Equipment familiarization is a routine part of astronaut training and launch preparations. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1181

S37-52-004 - STS-037 - STS-37 activities in the payload bay

S116E06301 - STS-116 - STS-116 MS Fuglesang relocates CETA 2 cart on EVA 2

S131E008882 - STS-131 - STS-131 EVA 2 S1 ATA Relocation OPS

STS113-344-011 - STS-113 - STS-113 EVA 2 transfer / relocation of CETA cart to S1 truss

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay. The crew is at KSC for Crew Equipment Interface Test activities, which involves equipment familiarization, a routine part of astronaut training and launch preparations. The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station. The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1205

KENNEDY SPACE CENTER, FLA. - Workers inside the payload canister watch the S1 Integrated Truss Structure as it is lowered toward them. The canister will transport the truss to Atlantis. The first starboard truss segment, the S1 will be attached to the Central truss segment, the S0 Truss, on the International Space Station during mission STS-112. Atlantis is scheduled to launch no earlier than Oct. 2. KSC-02pd1222

S124E008069 - STS-124 - View of the Crew Equipment Translation Aid 2 (CETA 2)

STS113-312-014 - STS-113 - CETA carts 1 and 2 on the P1 truss taken during STS-113 flyaround

STS113-714-045 - STS-113 - Lopez-Alegria and Herrington work near CETA cart 2 during STS-113 EVA OPS

Topics

endeavour sts 113 p 1 ceta kennedy space center endeavour mobile launcher platform mobile launcher platform launch pad rollout sts mission sts international space station payloads port truss segment first port truss segment crew equipment translation equipment translation aid ceta cart cart b truss segment expedition return expedition earth space shuttle high resolution nasa