visibility Similar

Maxwell AFB, Ala. - On going construction on the Air

Apollo Spacecraft 012 hoisted to top of gantry at Pad 34

CAPE CANAVERAL, Fla. – At Launch Complex 41 on Cape Canaveral Air Force Station in Florida, the Centaur upper stage for the Atlas V rocket scheduled to launch NASA's Solar Dynamics Observatory, or SDO, is lifted to the top of the Vertical Integration Facility where it will be installed on the first stage of the Atlas V, in the background. SDO is the first space weather research network mission in NASA's Living With a Star Program. The spacecraft's long-term measurements will give solar scientists in-depth information about changes in the sun's magnetic field and insight into how they affect Earth. Liftoff on the United Launch Alliance Atlas V is scheduled for 10:53 a.m. EST on Feb. 3, 2010. For information on SDO, visit http://www.nasa.gov/sdo. Photo credit: NASA/Jack Pfaller KSC-2009-6909

The Navy's Mobile User Objective System (MUOS) 2 satellite

Expedition 19 Soyuz Erection. NASA public domain image colelction.

CAPE CANAVERAL, Fla. – On NASA's Kennedy Space Center in Florida, the canister with space shuttle Atlantis’ Hubble Space Telescope payload inside heads toward the Canister Rotation Facility. The payload comprises four carriers holding various equipment for the mission. After rotation to horizontal, the canister will be transported back to Kennedy’s Payload Hazardous Servicing Facility where the hardware will be stored until a new target launch date can be set for Atlantis’ STS-125 mission in 2009. Atlantis’ October target launch date was delayed after a device on board Hubble used in the storage and transmission of science data to Earth shut down on Sept. 27. Replacing the broken device will be added to Atlantis’ servicing mission to the telescope Photo credit: NASA/Tim Jacobs KSC-08pd3155

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, construction workers have removed a space shuttle-era work platform from high bay 3 inside the Vehicle Assembly Building, or VAB. The platform has been moved to the VAB north parking area for temporary storage. The work is part of a centerwide refurbishment initiative under the Ground Systems Development and Operations, or GSDO, Program. High bay 3 is being refurbished to accommodate NASA’s Space Launch System and a variety of other spacecraft. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html. Photo credit: NASA/Charisse Nahser KSC-2012-5597

code Related

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39A, the P1 Truss Segment is lifted to the level of the Payload Changeout Room. The P1 truss is the primary payload for Mission STS-113 to the International Space Station. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission. KSC-02pd1504

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39A, the P1 Truss Segment arrives at the pad for transfer into the Payload Changeout Room. The P1 truss is the primary payload for Mission STS-113 to the International Space Station. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission. KSC-02pd1503

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39A, the P1 Truss Segment arrives at the pad for transfer into the Payload Changeout Room. The P1 truss is the primary payload for Mission STS-113 to the International Space Station. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission. KSC-02pd1502

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39A, technicians prepare to move the P1 truss segment from the payload canister into the Payload Changeout Room. The P1 truss is the primary payload for Mission STS-113 to the International Space Station. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission. KSC-02pd1509

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39A, the payload canister doors are open to reveal the P1 truss before transfer to the Payload Changeout Room. The P1 truss is the primary payload for Mission STS-113 to the International Space Station. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission. KSC-02pd1508

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39A, the P1 Truss Segment arrives at the Payload Changeout Room in preparation for installation into Endeavour's payload bay. The P1 truss is the primary payload for Mission STS-113 to the International Space Station. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission. KSC-02pd1506

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, the P1 Truss Segment is moved by overhead crane through the highbay toward the payload canister. The P1 truss is the primary payload for Mission STS-113. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission. KSC-02pd1434

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39A, technicians in the Payload Changout Room supervise the opening of the payload canister doors for transfer of the P1 truss. The P1 truss is the primary payload for Mission STS-113 to the International Space Station. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission. KSC-02pd1507

KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility, technicians prepare the P1 Truss Segment to be hooked to the overhead crane and moved toward the payload canister. The P1 truss is the primary payload for Mission STS-113. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission. KSC-02pd1433

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39A, the P1 Truss Segment is lifted to the level of the Payload Changeout Room. The P1 truss is the primary payload for Mission STS-113 to the International Space Station. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission. KSC-02pd1505

description

Summary

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39A, the P1 Truss Segment is lifted to the level of the Payload Changeout Room. The P1 truss is the primary payload for Mission STS-113 to the International Space Station. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission.

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center launch launch complex truss segment truss segment level payload room payload changeout room sts mission sts international space station port first port truss segment expedition crew return expedition endeavour space shuttle endeavour space shuttle high resolution launch pad spacecraft rocket launch nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Return Expedition, First Port Truss Segment, Level

S132E011900 - STS-132 - ISS Fly Around views during STS-132

STS067-369-018 - STS-067 - Low light level photography of Earth city lights

CAPE CANAVERAL, Fla. – In High Bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the Ares I-X upper stage simulator service module/service adapter segment (foreground) is being prepared for its move to a stand. Other segments are placed and stacked on the floor around it. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. The Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Kim Shiflett KSC-2009-2462

S118E07571 - STS-118 - Exterior view of the ISS taken during STS-118

S118E07585 - STS-118 - Exterior view of the ISS taken during STS-118

The upper level auxiliary machinery room No. 2 room aboard the guided missile frigate KLAKRING (FFG-42) under construction

KENNEDY SPACE CENTER, FLA. - After being raised to a vertical position, the first stage of an Atlas V rocket is being moved into the Vertical Integration Facility to begin preparations for launch on Launch Complex 41 at Cape Canaveral Air Force Station. The Lockheed Martin Atlas V is the launch vehicle for the New Horizons spacecraft, which is designed to make the first reconnaissance of Pluto and Charon - a "double planet" and the last planet in our solar system to be visited by spacecraft. The mission will then visit one or more objects in the Kuiper Belt region beyond Neptune. New Horizons is scheduled to launch in January 2006, swing past Jupiter for a gravity boost and scientific studies in February or March 2007, and reach Pluto and its moon, Charon, in July 2015. KSC-05pd2268

S121E05575 - STS-121 - Solar array and ITS P1 on the ISS as the orbiter Discovery moves in for docking during STS-121

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank is practicing folding a sequential shunt unit launch to activation multilayer installation blanket. Burbank and other crew members are at the center for Crew Equipment Interface Test activities. Equipment familiarization is a routine part of astronaut training and launch preparations. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1181

Production. Milling machines and machine castings. If it isn't level, it won't work accurately. Milling the bottom bearing pads of a milling machine column casting. Location: a large Midwest machine tool plant

SFOG (Solid Fuel Oxygen Generator) candles in the RS (Russian Segment)

Rangoon - Executive Level Position Residence - 1981

Topics

kennedy space center launch launch complex truss segment truss segment level payload room payload changeout room sts mission sts international space station port first port truss segment expedition crew return expedition endeavour space shuttle endeavour space shuttle high resolution launch pad spacecraft rocket launch nasa