visibility Similar

STS090-338-027 - STS-090 - GPWS - Williams works at Rack 8

Marshburn and Ford move CDRA through U.S. Laboratory hatch

STS-90 Mission Specialists Dafydd (Dave) Williams with the Canadian Space Agency and Kathryn (Kay) Hire participate in Terminal Countdown Demonstration Test (TCDT) activities at KSC's Launch Pad 39B. The TCDT is held at KSC prior to each Space Shuttle flight to provide crews with the opportunity to participate in simulated countdown activities. The Space Shuttle Columbia is targeted for launch of STS-90 on April 16 at 2:19 p.m. EDT and will be the second mission of 1998. The mission is scheduled to last nearly 17 days KSC-98pc451

S135E011573 - STS-135 - Walheim works with Forward Osmosis Bag Payload on Middeck

S81E5099 - STS-081 - Biorack samples

STS091-357-015 - STS-091 - Crewmember activity in the orbiter middeck

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Maximum Envelope Support Structure (MESS) rack they will be using during their mission to the International Space Station. Seen here (with backs to camera, in uniform) are Mission Specialist Richard A. Mastracchio, Pilot Scott D. Altman, Boris V. Morukov, and Edward T. Lu (at right). Also taking part in the CEIT are Commander Terrence W. Wilcutt and Mission Specialists Yuri I. Malenchenko and Daniel C. Burbank. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC00pp0952

Magnus and Chamitoff in Node 2. NASA public domain image colelction.

ASCANS Class of 2013 Tour the O&C with Cabana

code Related

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test activities, STS-113 Mission Specialist John Herrington looks over paperwork for equipment in Endeavour that will be carried on the mission. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission. KSC-02pd1329

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test activities, STS-113 Mission Specialists John Herrington (left) and Michael Lopez-Alegria (center) practice working with equipment in Endeavour. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission. KSC-02pd1330

KENNEDY SPACE CENTER, FLA. -- STS-113 Commander James Wetherbee checks the cockpit window from inside Endeavour. The check is part of Crew Equipment Interface Test activities, which include familiarization with equipment for the mission. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission. KSC-02pd1325

KENNEDY SPACE CENTER, FLA. -- STS-113 Pilot Paul Lockhart checks the cockpit window from inside Endeavour. The check is part of Crew Equipment Interface Test activities, which include familiarization with equipment for the mission. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission. KSC-02pd1326

KENNEDY SPACE CENTER, FLA. - As part of Crew Equipment Interface Test activities, STS-113 Mission Specialists Michael Lopez-Alegria (left) and John Herrington (center) look over equipment that will be carried on the mission. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission. KSC-02pd1328

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test activities, STS-113 Mission Specialists Michael Lopez-Alegria (left) and John Herrington (right) practice working with flight equipment in Endeavour. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission. KSC-02pd1331

KENNEDY SPACE CENTER, FLA. - Atop its transporter, orbiter Endeavour rolls back onto the tow-way for transfer to the Vehicle Assembly Building and continued launch preparations. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The CETA Cart B can be used by spacewalkers to move along the truss with equipment The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1400

KENNEDY SPACE CENTER, FLA. - Orbiter Endeavour arrives in the transfer aisle of the Vehicle Assembly Building to continue launch preparations. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss and the Crew and Equipment Translation Aid (CETA) Cart B. . Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The CETA Cart B can be used by spacewalkers to move along the truss with equipment The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1403

KENNEDY SPACE CENTER, FLA. - Workers walk alongside orbiter Endeavour as it rolls over to the Vehicle Assembly Building for continued launch preparations. Endeavour is scheduled to launch Nov. 10 on mission STS-113, the 16th assembly flight to the International Space Station. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. The CETA Cart B can be used by spacewalkers to move along the truss with equipment The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. KSC-02pd1401

KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee (left) andPilot Paul Lockhart (right) look over equipment inside Endeavour as part of Crew Equipment Interface Test activities. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission. KSC-02pd1327

description

Summary

KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee (left) andPilot Paul Lockhart (right) look over equipment inside Endeavour as part of Crew Equipment Interface Test activities. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission.

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

sts 113 ceit s 1 ceta kennedy space center sts commander james wetherbee commander james wetherbee andpilot paul lockhart andpilot paul lockhart equipment endeavour crew interface activities crew equipment interface test activities payloads mission sts port truss segment first port truss segment truss segment international space station translation equipment translation aid ceta cart cart b spacewalkers move expedition return expedition earth space shuttle endeavour space shuttle high resolution nasa florida cape canaveral
date_range

Date

1970 - 1979
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Return Expedition, Spacewalkers, Cart B

STS063-312-018 - STS-063 - Cdr. Wetherbee on flight deck during Mir rendezvous

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank is practicing folding a sequential shunt unit launch to activation multilayer installation blanket. Burbank and other crew members are at the center for Crew Equipment Interface Test activities. Equipment familiarization is a routine part of astronaut training and launch preparations. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1181

S37-52-004 - STS-037 - STS-37 activities in the payload bay

S102E5027 - STS-102 - MS Richards during hardware checkout on the flight deck

STS102-361-033 - STS-102 - Flight deck activity during ISS flyaround

KENNEDY SPACE CENTER, FLA. - Erupting from the clouds of smoke below, Space Shuttle Endeavour roars into space on mission STS-111 to the International Space Station. Liftoff occurred at 5:22:49 p.m. EDT. The STS-111 crew includes Commander Kenneth Cockrell, Pilot Paul Lockhart, and Mission Specialists Franklin Chang-Diaz and Philippe Perrin (CNES), as well as the Expedition Five crew members Valeri Korzun, Peggy Whitson and Sergei Treschev. This mission marks the 14th Shuttle flight to the International Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program KSC-02pd0898

S116E06301 - STS-116 - STS-116 MS Fuglesang relocates CETA 2 cart on EVA 2

STS113-343-037 - STS-113 - Wetherbee enters Endeavour's ODS A/L during STS-113

STS113-338-020 - STS-113 - Wetherbee, Lockhart and Herrington, in LES, prep for landing on Endeavour's FD during STS-113

S131E008699 - STS-131 - STS-131 EVA 2 S1 ATA Relocation OPS

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay. The crew is at KSC for Crew Equipment Interface Test activities, which involves equipment familiarization, a routine part of astronaut training and launch preparations. The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station. The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1205

KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee is happy to suit up before launch. Wetherbee will be making his sixth Shuttle flight. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST. KSC-02pd1704

Topics

sts 113 ceit s 1 ceta kennedy space center sts commander james wetherbee commander james wetherbee andpilot paul lockhart andpilot paul lockhart equipment endeavour crew interface activities crew equipment interface test activities payloads mission sts port truss segment first port truss segment truss segment international space station translation equipment translation aid ceta cart cart b spacewalkers move expedition return expedition earth space shuttle endeavour space shuttle high resolution nasa florida cape canaveral