visibility Similar

STS-135 - LAUNCH - Public domain NASA photogrpaph

s27-s-071. NASA public domain image colelction.

STS-29 Discovery, Orbiter Vehicle (OV) 103, roll out to KSC LC Pad 39B

The newest space shuttle orbiter, Endeavour is ready to roll out of the hangar at Palmdale, Calif. OV-105 features many design enhancements, including a drag chute for safer landings and equipment to allow the orbiter to remain in space for up to 28 days. Photo credit: NASA KSC-91PC-0770

KENNEDY SPACE CENTER, Fla. -- As the sun clears the horizon, it creates a silhouette of the Space Shuttle Atlantis as it makes the crawl from the Vehicle Assembly Building to Launch Pad 39A. The Shuttle has been in the VAB undergoing tests on the solid rocket booster cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis, causing return of the Shuttle to the VAB a week ago. Launch of Atlantis on STS-98 has been rescheduled to Feb. 7 at 6:11 p.m. EST KSC01padig032

STS-123 - EOM - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. – Space shuttle Atlantis clears the open doorway of the Vehicle Assembly Building at NASA’s Kennedy Space Center as it rolls out to Launch Pad 39A. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. First motion occurred at 9:19 a.m. EDT. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2532

KENNEDY SPACE CENTER, FLA. -- Nearing the end of its 4.2-mile trek from the Vehicle Assembly Building (VAB), Space Shuttle Discovery clears the gate to begin the climb to Launch Pad 39B aboard the mobile launcher platform and crawler transporter. Earlier in the week, the Shuttle was rolled back to the VAB from the pad to repair hail damage on the external tank's foam insulation. Mission STS-96, the 94th launch in the Space Shuttle Program, is scheduled for liftoff May 27 at 6:48 a.m. EDT. STS-96 is a logistics and resupply mission for the International Space Station, carrying such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-shared experiment KSC-99pp0564

STS-130 - LAUNCH - Public domain NASA photogrpaph

code Related

KENNEDY SPACE CENTER, FLA. - Atlantis, with its drag chute deployed, finds the runway beyond the vegetation at KSC's Shuttle Landing Facility. The landing completes the 10-day, 19-hour, 4.5-million mile mission STS-110 to the International Space Station. The orbiter carries the returning crew Commander Michael Bloomfield, Pilot Stephen Frick and Mission Specialists Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin and Rex Walheim. Main gear touchdown was 12:26:57 p.m. EDT, nose gear touchdown was 12:27:09 p.m. and wheel stop was 12:28:07 p.m. The crew delivered and installed the S0 truss, which will support cooling and power systems essential for the addition of future international laboratories, on the Station KSC-02pd0515

KENNEDY SPACE CENTER, FLA. -- Atlantis kicks up dust as its main gear touches down on runway 33 at KSC's Shuttle Landing Facility. The landing completes the 10-day, 19-hour, 4.5-million mile mission STS-110 to the International Space Station. The orbiter carries the returning crew Commander Michael Bloomfield, Pilot Stephen Frick and Mission Specialists Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin and Rex Walheim. Main gear touchdown was 12:26:57 p.m. EDT, nose gear touchdown was 12:27:09 p.m. and wheel stop was 12:28:07 p.m. The crew delivered and installed the S0 truss, which will support cooling and power systems essential for the addition of future international laboratories, on the Station KSC-02pd0517

KENNEDY SPACE CENTER, FLA. - Atlantis swoops down over vegetation and water as it approaches runway 33 at KSC's Shuttle Landing Facility. The landing completes the 10-day, 19-hour, 4.5-million mile mission STS-110 to the International Space Station.. The orbiter carries the returning crew Commander Michael Bloomfield, Pilot Stephen Frick and Mission Specialists Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin and Rex Walheim. Main gear touchdown was 12:26:57 p.m. EDT, nose gear touchdown was 12:27:09 p.m. and wheel stop was 12:28:07 p.m. The crew delivered and installed the S0 truss, which will support cooling and power systems essential for the addition of future international laboratories, on the Station KSC-02pd0514

KENNEDY SPACE CENTER, FLA. -- Atlantis approaches touchdown on runway 33 at KSC's Shuttle Landing Facility. The landing completes the 10-day, 19-hour, 4.5-million mile mission STS-110 to the International Space Station. In the upper right corner is the chase plane following Atlantis' path. The orbiter carries the returning crew Commander Michael Bloomfield, Pilot Stephen Frick and Mission Specialists Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin and Rex Walheim. Main gear touchdown was 12:26:57 p.m. EDT, nose gear touchdown was 12:27:09 p.m. and wheel stop was 12:28:07 p.m. The crew delivered and installed the S0 truss, which will support cooling and power systems essential for the addition of future international laboratories, on the Station KSC-02pd0511

KENNEDY SPACE CENTER, FLA. -- Atlantis lands at the KSC Shuttle Landing Facility, runway 33, after completing the 10-day, 19-hour, 4.5-million mile mission STS-110 to the International Space Station. The orbiter carries the crew of seven: Commander Michael Bloomfield, Pilot Stephen Frick and Mission Specialists Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin and Rex Walheim. Main gear touchdown was 12:26:57 p.m. EDT, nose gear touchdown was 12:27:09 p.m. and wheel stop was 12:28:07 p.m. The crew delivered and installed the S0 truss, which will support cooling and power systems essential for the addition of future international laboratories, on the Station KSC-02pp0536

KENNEDY SPACE CENTER, FLA. -- Atlantis touches down on runway 33 after completing the 10-day, 19-hour, 4.5-million mile mission STS-110 to the International Space Station. The orbiter carries the returning crew Commander Michael Bloomfield, Pilot Stephen Frick and Mission Specialists Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin and Rex Walheim. Main gear touchdown was 12:26:57 p.m. EDT, nose gear touchdown was 12:27:09 p.m. and wheel stop was 12:28:07 p.m. The crew delivered and installed the S0 truss, which will support cooling and power systems essential for the addition of future international laboratories, on the Station KSC-02pd0518

KENNEDY SPACE CENTER, FLA. -- Atlantis touches down on runway 33 at KSC after completing the 10-day, 19-hour, 4.5-million mile mission STS-110 to the International Space Station. The vehicle carries the returning crew Commander Michael Bloomfield, Pilot Stephen Frick and Mission Specialists Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin and Rex Walheim. Main gear touchdown was 12:26:57 p.m. EDT, nose gear touchdown was 12:27:09 p.m. and wheel stop was 12:28:07 p.m. The crew delivered and installed the S0 truss, which will support cooling and power systems essential for the addition of future international laboratories, on the Station. KSC-02pd0507

KENNEDY SPACE CENTER, FLA. - Atlantis and crew return to Earth, touching down on the KSC Shuttle Landing Facility runway 33, after completing the 10-day, 19-hour, 4.5-million mile mission STS-110 to the International Space Station. The crew comprises Commander Michael Bloomfield, Pilot Stephen Frick and Mission Specialists Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin and Rex Walheim. Main gear touchdown was 12:26:57 p.m. EDT, nose gear touchdown was 12:27:09 p.m. and wheel stop was 12:28:07 p.m. The crew delivered and installed the S0 truss, which will support cooling and power systems essential for the addition of future international laboratories, on the Station KSC-02pp0535

KENNEDY SPACE CENTER, FLA. - Atlantis kicks up dust as it touches down on runway 33 after completing the 10-day, 19-hour, 4.5-million mile mission STS-110 to the International Space Station. The orbiter carries the returning crew Commander Michael Bloomfield, Pilot Stephen Frick and Mission Specialists Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin and Rex Walheim. Main gear touchdown was 12:26:57 p.m. EDT, nose gear touchdown was 12:27:09 p.m. and wheel stop was 12:28:07 p.m. The crew delivered and installed the S0 truss, which will support cooling and power systems essential for the addition of future international laboratories, on the Station KSC-02pp0532

KENNEDY SPACE CENTER, FLA. -- The drag chute deploys as Atlantis touches down on runway 33 at KSC's Shuttle Landing Facility. The landing completes the 10-day, 19-hour, 4.5-million mile mission STS-110 to the International Space Station. The orbiter carries the returning crew Commander Michael Bloomfield, Pilot Stephen Frick and Mission Specialists Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin and Rex Walheim. Main gear touchdown was 12:26:57 p.m. EDT, nose gear touchdown was 12:27:09 p.m. and wheel stop was 12:28:07 p.m. The crew delivered and installed the S0 truss, which will support cooling and power systems essential for the addition of future international laboratories, on the Station KSC-02pd0513

description

Summary

KENNEDY SPACE CENTER, FLA. -- The drag chute deploys as Atlantis touches down on runway 33 at KSC's Shuttle Landing Facility. The landing completes the 10-day, 19-hour, 4.5-million mile mission STS-110 to the International Space Station. The orbiter carries the returning crew Commander Michael Bloomfield, Pilot Stephen Frick and Mission Specialists Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin and Rex Walheim. Main gear touchdown was 12:26:57 p.m. EDT, nose gear touchdown was 12:27:09 p.m. and wheel stop was 12:28:07 p.m. The crew delivered and installed the S0 truss, which will support cooling and power systems essential for the addition of future international laboratories, on the Station

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

kennedy space center drag chute deploys drag chute deploys atlantis touches atlantis touches runway mile sts international space station orbiter crew commander michael bloomfield crew commander michael bloomfield pilot stephen frick pilot stephen frick specialists jerry ross mission specialists jerry ross steven smith steven smith ellen ochoa ellen ochoa lee morin lee morin rex walheim rex walheim main gear touchdown main gear touchdown nose nose gear touchdown wheel truss support power power systems addition laboratories station ksc space shuttle space shuttle landing high resolution nasa
date_range

Date

19/04/2002
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Crew Commander Michael Bloomfield, Pilot Stephen Frick, Lee Morin

STS066-96-032 - STS-066 - CRISTA-SPAS - Atlantis' RMS deploys the CRISTA-SPAS during STS-66 mission

61B-39-015 - STS-61B - MORELOS satellite deploys from payload bay of Atlantis

STS110-362-025 - STS-110 - Pilot Frick works at the RMS controls on the aft flight deck of Atlantis during STS-110

51G-32-073 - STS-51G - Morelos-A deploys from the payload bay

STS066-13-008 - STS-066 - PC Ochoa and Cdr. McMonagle work on Atlantis' flight deck during STS-66

61B-38-036M - STS-61B - SATCOM K-2 deploys from the payload bay of Atlantis during STS-61B

Space shuttle STS-66 Launch. NASA public domain image colelction.

USAF MASTER Sergeant Steven Meyer a Loadmaster with the 821st Mobility Squadron, McGuire AFB, New Jersey checks the tie down chains inside the cargo bay of a C-5 Galaxy aircraft before the aircraft deploys to Southwest Asia, in support of operation DESERT FOX

STS103-708-062 - STS-103 - 3rd EVA - View of Smith and Grunsfeld during MLI repair

61B-39-021 - STS-61B - MORELOS satellite deploys from payload bay of Atlantis

EDWARDS, Calif. – Against a setting sun, space shuttle Endeavour undergoes recovery operations on Edwards Air Force Base in California after its landing. The orbiter convoy normally begins recovery operations in earnest about two hours before the shuttle is scheduled to land. Specially designed vehicles or units and a team of trained personnel “safe” the orbiter and prepare it for towing. Purge and Coolant Umbilical Access Vehicles are moved into position behind the orbiter to get access to the umbilical areas. The flight crew is replaced aboard the orbiter by exchange sup¬port personnel who prepare the orbiter for ground tow operations, install switch guards and remove data packages from any onboard experiments. After a total safety downgrade, vehicle ground personnel make numerous preparations for the towing operation, including install¬ing landing gear lock pins, disconnecting the nose landing gear drag link, positioning the towing vehicle in front of the orbiter and connecting the tow bar. The decision to land Endeavour at Edwards was made due to weather concerns at NASA's Kennedy Space Center in Florida. In the 52nd landing at Edwards, Endeavour touched down at 4:25 p.m. EST to end the STS-126 mission, completing its 16-day journey of more than 6.6 million miles in space. Endeavour will be returned to Kennedy atop a Shuttle Carrier Aircraft, or SCA, a modified Boeing 747 jetliner. Photo credit: NASA/Tony Landis, VAFB KSC-08pd3887

STS103-713-049 - STS-103 - 1st EVA - NICMOS ops

Topics

kennedy space center drag chute deploys drag chute deploys atlantis touches atlantis touches runway mile sts international space station orbiter crew commander michael bloomfield crew commander michael bloomfield pilot stephen frick pilot stephen frick specialists jerry ross mission specialists jerry ross steven smith steven smith ellen ochoa ellen ochoa lee morin lee morin rex walheim rex walheim main gear touchdown main gear touchdown nose nose gear touchdown wheel truss support power power systems addition laboratories station ksc space shuttle space shuttle landing high resolution nasa