visibility Similar

code Related

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-111 Mission Specialists Phillippe Perrin (left) and Franklin Chang-Diaz (right) check equipment for their mission. Perrin is with the French Space Agency (CNES). Perrin and Chang-Diaz, with other crew members, are taking part in a Crew Equipment Interface Test in preparation for launch. Mission STS-111 will carry to the International Space Station the Multipurpose Logistics Module (MPLM), filled with experiment racks and three stowage and resupply racks, and the Mobile Base System (MBS), which will attach to the Mobile Transporter and complete the Canadian Mobile Servicing System, or MSS. The Station's mechanical arm will then have the capability to "inchworm" from the U.S. Lab to the MSS and travel along the truss to work sites on the Station. Launch of Endeavour on mission STS-111 is scheduled for May 30, 2002 KSC-02pd0503

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-111 Mission Specialists Franklin Chang-Diaz (center) and Phillippe Perrin (right) check equipment with a trainer (left) in orbiter Endeavour. Perrin is with the French Space Agency (CNES). Perrin and Chang-Diaz, with other crew members, are taking part in a Crew Equipment Interface Test in preparation for launch. Mission STS-111 will carry to the International Space Station the Multipurpose Logistics Module (MPLM), filled with experiment racks and three stowage and resupply racks, and the Mobile Base System (MBS), which will attach to the Mobile Transporter and complete the Canadian Mobile Servicing System, or MSS. The Station's mechanical arm will then have the capability to "inchworm" from the U.S. Lab to the MSS and travel along the truss to work sites on the Station. Launch of Endeavour on mission STS-111 is scheduled for May 30, 2002 KSC-02pd0505

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-111 Pilot Paul Lockhart inspects the window of Endeavour's cockpit. He and other crew members are taking part in a Crew Equipment Interface Test in preparation for launch. Mission STS-111 will carry to the International Space Station the Multipurpose Logistics Module (MPLM), filled with experiment racks and three stowage and resupply racks, and the Mobile Base System (MBS), which will attach to the Mobile Transporter and complete the Canadian Mobile Servicing System, or MSS. The Station's mechanical arm will then have the capability to "inchworm" from the U.S. Lab to the MSS and travel along the truss to work sites on the Station. Launch of Endeavour on mission STS-111 is scheduled for May 30, 2002 KSC-02pd0502

KENNEDY SPACE CENTER, FLA. -- STS-111 Mission Specialist Franklin Chang-Diaz (left) settles in the seat of the slidewire basket on Launch Pad 39A while Mission Specialist Philippe Perrin (right), who is with the French Space Agency, reaches for the release lever. They and the rest of the STS-111 crew and Expedition 5 crew are taking part in Terminal Countdown Demonstration Test activities, which include emergency egress training and a simulated launch countdown. Mission STS-111 is Utilization Flight 2, carrying equipment and supplies in the Multi-Purpose Logistics Module Leonardo to the International Space Station, plus the Mobile Base System (MBA) and an Orbital Replacement Unit. The MBS will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, enabling Canadarm 2 to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. The Expedition 5 crew is traveling on Endeavour to replace the Expedition 4 crew on the Station. Launch of Endeavour is scheduled for May 30, 2002 KSC-02pd0717

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-111 Commander Kenneth Cockrell inspects the window of Endeavour's cockpit. He and other crew members are taking part in a Crew Equipment Interface Test in preparation for launch. Mission STS-111 will carry to the International Space Station the Multipurpose Logistics Module (MPLM), filled with experiment racks and three stowage and resupply racks, and the Mobile Base System (MBS), which will attach to the Mobile Transporter and complete the Canadian Mobile Servicing System, or MSS. The Station's mechanical arm will then have the capability to "inchworm" from the U.S. Lab to the MSS and travel along the truss to work sites on the Station. Launch of Endeavour on mission STS-111 is scheduled for May 30, 2002 KSC-02pd0501

KENNEDY SPACE CENTER, FLA. - STS-111 Commander Kenneth Cockrell (left) settles in the seat of the slidewire basket while Pilot Paul Lockhart (right) gets ready to pull the release lever. They and the rest of the STS-111 crew and the Expedition 5 crew are taking part in Terminal Countdown Demonstration Test activities, which include emergency egress training and a simulated launch countdown. Mission STS-111 is Utilization Flight 2, carrying equipment and supplies in the Multi-Purpose Logistics Module Leonardo to the International Space Station, plus the Mobile Base System (MBA) and an Orbital Replacement Unit. The MBS will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, enabling Canadarm 2 to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. The Expedition 5 crew is traveling on Endeavour to replace the Expedition 4 crew on the Station. Launch of Endeavour is scheduled for May 30, 2002 KSC-02pd0719

KENNEDY SPACE CENTER, FLA. -- During emergency egress training at the pad, Expedition 5 member Peggy Whitson, STS-111 Pilot Paul Lockhart and Expedition 5 Commander Valeri Korzun look over the slidewire basket area. The training for the two crews is part of Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. Mission STS-111 is known as Utilization Flight 2, carrying supplies and equipment in the Multi-Purpose Logistics Module Leonardo to the International Space Station. The payload also includes the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Expedition 5 will travel to the Station on Endeavour as the replacement crew for Expedition 4, who will return to Earth aboard the orbiter. Launch is scheduled for May 30, 2002 KSC-02pd0701

KENNEDY SPACE CENTER, FLA. -- STS-111 Paul Lockhart waves after getting into his launch and entry suit. The mission crew, plus the Expedition 5 crew, are taking part in Terminal Countdown Demonstration Test activities, which includes a simulated launch countdown. Mission STS-111 is known as Utilization Flight 2, carrying supplies and equipment in the Multi-Purpose Logistics Module Leonardo to the International Space Station. The payload also includes the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Expedition 5 will travel to the Station on Endeavour as the replacement crew for Expedition 4, who will return to Earth aboard the orbiter. Launch is scheduled for May 30, 2002 KSC-02pd0703

KENNEDY SPACE CENTER, FLA. - At the KSC Shuttle Landing Facility, STS-111 Mission Specialist Philippe Perrin, with the French Space Agency, waits for the rest of the crew before departing for Crew Quarters. The crew has arrived to prepare for launch. Mission STS-111, known as Utilization Flight 2, is carrying supplies and equipment to the International Space Station. The payload includes the Multi-Purpose Logistics Module Leonardo, the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Also on board will be Expedition 5, traveling to the Station on Space Shuttle Endeavour as the replacement crew for Expedition 4, who will return to Earth aboard the orbiter. Launch is scheduled for May 30, 2002 KSC-02pd0769

KENNEDY SPACE CENTER, FLA. -- Members of the STS-111 crew (dressed in green) look over equipment in the payload bay of Endeavour. The crew comprises Commander Kenneth Cockrell, Pilot Paul Lockhart and Mission Specialists Franklin Chang-Diaz and Phillipe Perrin, who is with the French Space Agency (CNES). The crew is taking part in a Crew Equipment Interface Test in preparation for launch. Mission STS-111 will carry to the International Space Station the Multipurpose Logistics Module (MPLM), filled with experiment racks and three stowage and resupply racks, and the Mobile Base System (MBS), which will attach to the Mobile Transporter and complete the Canadian Mobile Servicing System, or MSS. The Station's mechanical arm will then have the capability to "inchworm" from the U.S. Lab to the MSS and travel along the truss to work sites on the Station. Launch of Endeavour on mission STS-111 is scheduled for May 30, 2002 KSC-02pd0506

description

Summary

KENNEDY SPACE CENTER, FLA. -- Members of the STS-111 crew (dressed in green) look over equipment in the payload bay of Endeavour. The crew comprises Commander Kenneth Cockrell, Pilot Paul Lockhart and Mission Specialists Franklin Chang-Diaz and Phillipe Perrin, who is with the French Space Agency (CNES). The crew is taking part in a Crew Equipment Interface Test in preparation for launch. Mission STS-111 will carry to the International Space Station the Multipurpose Logistics Module (MPLM), filled with experiment racks and three stowage and resupply racks, and the Mobile Base System (MBS), which will attach to the Mobile Transporter and complete the Canadian Mobile Servicing System, or MSS. The Station's mechanical arm will then have the capability to "inchworm" from the U.S. Lab to the MSS and travel along the truss to work sites on the Station. Launch of Endeavour on mission STS-111 is scheduled for May 30, 2002

Nothing Found.

label_outline

Tags

kennedy space center sts equipment payload bay payload bay endeavour commander kenneth cockrell commander kenneth cockrell pilot paul lockhart pilot paul lockhart specialists franklin chang diaz mission specialists franklin chang diaz phillipe perrin phillipe perrin french french space agency cnes interface test crew equipment interface test preparation mission sts international space station multipurpose logistics module multipurpose logistics module mplm experiment racks experiment racks stowage three stowage mobile system mobile base system mbs transporter mobile transporter canadian canadian mobile mss arm capability inchworm lab truss sites work sites launch crew members high resolution nasa florida cape canaveral
date_range

Date

09/03/2002
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Phillipe, Mission Specialists Franklin Chang Diaz, Commander Kenneth Cockrell

STS098-345-006 - STS-098 - CDR Cockrell listens to music on Atlantis' middeck

STS111-343-023 - STS-111 - Cockrell in Node 1 during STS-111 UF-2 cargo transfer OPS to the ISS

STS111-316-006 - STS-111 - Lockhart enters information on a laptop computer on Endeavour's AFD during STS-111 UF-2

STS111-726-048 - STS-111 - WIF-12 and the MBS on the S0 truss taken during STS-111 UF-2

STS111-708-056 - STS-111 - S0 truss and MBS survey image taken during STS-111 UF-2 Flyaround

A member of Explosive Ordnance Disposal (EOD) Mobile Unit Four trains a dolphin to load itself into a boat for transportation to and from work sites. The EOD unit trains sea lions and dolphins to retrieve underwater ordnance

STS080-345-026 - STS-080 - Cockrell exercises on the middeck bicycle ergometer

STS080-325-014 - STS-080 - Commander Ken Cockrell cleans vents in the flight deck

STS098-320-005 - STS-098 - CDR Cockrell in FGB/Zarya module

STS069-301-023 - STS-069 - Astronaut Cockrell on middeck

KENNEDY SPACE CENTER, FLA. - Erupting from the clouds of smoke below, Space Shuttle Endeavour roars into space on mission STS-111 to the International Space Station. Liftoff occurred at 5:22:49 p.m. EDT. The STS-111 crew includes Commander Kenneth Cockrell, Pilot Paul Lockhart, and Mission Specialists Franklin Chang-Diaz and Philippe Perrin (CNES), as well as the Expedition Five crew members Valeri Korzun, Peggy Whitson and Sergei Treschev. This mission marks the 14th Shuttle flight to the International Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program KSC-02pd0898

KENNEDY SPACE CENTER, FLA. - The Italian-built module, U.S. Node 2, arrives at the Space Station Processing Facility after its move from the Shuttle Landing Facility. The second of three connecting modules on the International Space Station, Node 2 attaches to the end of the U.S. Lab and provides attach locations for the Japanese laboratory, European laboratory, the Centrifuge Accommodation Module and, later, Multipurpose Logistics Modules. It will provide the primary docking location for the Shuttle when a pressurized mating adapter is attached to Node 2. Installation of the module will complete the U.S. Core of the ISS. Node 2 is the designated payload for mission STS-120. No orbiter or launch date has been determined yet.

Topics

kennedy space center sts equipment payload bay payload bay endeavour commander kenneth cockrell commander kenneth cockrell pilot paul lockhart pilot paul lockhart specialists franklin chang diaz mission specialists franklin chang diaz phillipe perrin phillipe perrin french french space agency cnes interface test crew equipment interface test preparation mission sts international space station multipurpose logistics module multipurpose logistics module mplm experiment racks experiment racks stowage three stowage mobile system mobile base system mbs transporter mobile transporter canadian canadian mobile mss arm capability inchworm lab truss sites work sites launch crew members high resolution nasa florida cape canaveral