KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, overhead cranes are lowered toward the orbiter Columbia. The cranes will lift the orbiter to a vertical position for stacking with the external tank and solid rocket boosters. Columbia is scheduled to be launched Feb. 28 on mission STS-109, a Hubble Servicing Mission. The goal of the mission is to service the HST, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the ACS, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation KSC-02pd0024
Summary
KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, overhead cranes are lowered toward the orbiter Columbia. The cranes will lift the orbiter to a vertical position for stacking with the external tank and solid rocket boosters. Columbia is scheduled to be launched Feb. 28 on mission STS-109, a Hubble Servicing Mission. The goal of the mission is to service the HST, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the ACS, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation
Tags
kennedy space center
cranes
orbiter
columbia
orbiter columbia
tank
rocket
boosters
rocket boosters
sts
mission sts
hubble
hst
solar
array
solar array
power
control
power control unit
faint
object
camera
faint object camera
acs
infrared
infrared camera
multi object
spectrometer
multi object spectrometer
nicmos
system
new
blanket
layer
insulation
new outer blanket layer insulation ksc
high resolution
rocket engines
rocket technology
nasa
Date
16/01/2002
Location
Source
NASA
Link
Copyright info
Public Domain Dedication (CC0)