visibility Similar

STS-133 - EOM - Public domain NASA photogrpaph

STS-120 - EOM - Public domain NASA photogrpaph

STS-119 - EOM - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. -- On its transporter, space shuttle Endeavour turns away from the Orbiter Processing Facility to start the rollover to the Vehicle Assembly Building. In high bay 1 of the VAB, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Jim Grossmann KSC-08pd0268

STS-133 - EOM - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis glows from the landing lights as it nears touchdown on KSC’s Shuttle Landing Facility Runway 15 to complete the 9-day, 20-hour, 9-minute-long STS-101 mission. At the controls are Commander James D. Halsell Jr. and Pilot Scott "Doc" Horowitz. Also onboard the orbiter are Mission Specialists Mary Ellen Weber, James S. Voss, Jeffrey N. Williams, Susan J. Helms and Yury Usachev of Russia. The crew is returning from the third flight to the International Space Station. This was the 98th flight in the Space Shuttle program and the 21<sup>st</sup> for Atlantis, also marking the 51st landing at KSC, the 22nd consecutive landing at KSC, and the 29th in the last 30 Shuttle flights. Main gear touchdown was at 2:20:17 a.m. EDT, landing on orbit 155 of the mission. Nose gear touchdown was at 2:20:30 a.m. EDT, and wheel stop at 2:21:19 a.m. EDT KSC-00padig024

STS-131 - EOM - Public domain NASA photogrpaph

STS-133 - EOM - Public domain NASA photogrpaph

A left side view of the Space Transportation System 7 (STS-7) shuttle Challenger touching down on the runway at the end of its mission

code Related

KENNEDY SPACE CENTER, Fla. - With its drag chute trailing behind, orbiter Discovery and its crew land on KSC's Shuttle Landing Facility runway 15. Main gear touchdown was at 2:22:58 p.m. EDT; wheel stop, at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute STS-105 mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew; delivery of equipment, supplies and scientific experiments; and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. The landing was the first of five in 2001 to occur in daylight at KSC KSC-01pp1487

KENNEDY SPACE CENTER, Fla. - With its drag chute trailing behind, orbiter Discovery and its crew land on KSC's Shuttle Landing Facility runway 15. Main gear touchdown was at 2:22:58 p.m. EDT; wheel stop, at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute STS-105 mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew; delivery of equipment, supplies and scientific experiments; and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. Out of five missions in 2001, the landing was the first to occur in daylight at KSC KSC-01pp1486

KENNEDY SPACE CENTER, Fla. - Orbiter Discovery and its crew land on KSC's Shuttle Landing Facility runway 15, creating a cloud of smoke as its wheels touch the concrete. Main gear touchdown was at 2:22:58 p.m. EDT; wheel stop, at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute STS-105 mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew; delivery of equipment, supplies and scientific experiments; and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. Out of five missions in 2001, the landing was the first to occur in daylight at KSC KSC-01pp1485

KENNEDY SPACE CENTER, Fla. -- With its drag chute trailing behind, orbiter Discovery and its crew land on KSC's Shuttle Landing Facility runway 15. Main gear touchdown was at 2:22:58 p.m. EDT, wheel stop at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew, delivery of equipment supplies and scientific experiments, and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. The landing was the first out of five in 2001to occur in daylight at KSC KSC01padig273

KENNEDY SPACE CENTER, Fla. - Orbiter Discovery and its crew land on KSC's Shuttle Landing Facility runway 15, creating a cloud of smoke as its wheels touch the concrete. Main gear touchdown was at 2:22:58 p.m. EDT; wheel stop, at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute STS-105 mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew; delivery of equipment, supplies and scientific experiments; and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. Out of five missions in 2001, the landing was the first to occur in daylight at KSC KSC-01pp1490

KENNEDY SPACE CENTER, Fla. -- With its drag chute just beginning to open, orbiter Discovery and its crew land on KSC's Shuttle Landing Facility runway 15. Main gear touchdown was at 2:22:58 p.m. EDT; wheel stop, at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute STS-105 mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew; delivery of equipment, supplies and scientific experiments; and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. Out of five missions in 2001, the landing was the first to occur in daylight at KSC KSC-01pp1483

KENNEDY SPACE CENTER, Fla. -- The orbiter Discovery appears surrounded by vegetation as it lands at KSC's Shuttle Landing Facility runway 15 after a 4.3-million-mile mission to the International Space Station. Main gear touchdown was at 2:22:58 p.m. EDT, wheel stop at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew, delivery of equipment supplies and scientific experiments, and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery completed its 30th flight into space, the 106th mission of the Space Shuttle program. The landing was the first out of five in 2001to occur in daylight at KSC KSC01padig275

KENNEDY SPACE CENTER, Fla. -- Completing mission STS-105, orbiter Discovery and its crew drop through scattered clouds to land on KSC's Shuttle Landing Facility runway 15. Discovery trails its drag chute that helps slow the orbiter. Main gear touchdown was at 2:22:58 p.m. EDT, wheel stop at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew, delivery of equipment supplies and scientific experiments, and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. The landing was the first out of five in 2001to occur in daylight at KSC KSC01padig272

KENNEDY SPACE CENTER, Fla. -- With its drag chute trailing behind, orbiter Discovery and its crew land on KSC’s Shuttle Landing Facility runway 15. Main gear touchdown was at 2:22:58 p.m. EDT; wheel stop, at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute STS-105 mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew; delivery of equipment, supplies and scientific experiments; and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. The landing was the first of five in 2001 to occur in daylight at KSC KSC-01pp1507

KENNEDY SPACE CENTER, Fla. - A great blue heron flies along with orbiter Discovery as it lands on KSC's Shuttle Landing Facility runway 15. Main gear touchdown was at 2:22:58 p.m. EDT; wheel stop, at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute STS-105 mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew; delivery of equipment, supplies and scientific experiments; and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. Out of five missions in 2001, the landing was the first to occur in daylight at KSC KSC-01pp1489

description

Summary

KENNEDY SPACE CENTER, Fla. - A great blue heron flies along with orbiter Discovery as it lands on KSC's Shuttle Landing Facility runway 15. Main gear touchdown was at 2:22:58 p.m. EDT; wheel stop, at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute STS-105 mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew; delivery of equipment, supplies and scientific experiments; and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. Out of five missions in 2001, the landing was the first to occur in daylight at KSC

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center heron orbiter discovery orbiter discovery lands runway facility runway main gear touchdown main gear touchdown wheel sts goals international space station swapout crew resident station crew delivery equipment supplies experiments installation ammonia servicer ammonia servicer heater cables heater cables truss million million miles space shuttle program five missions daylight ksc ksc space shuttle high resolution nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Five Missions, Swapout, Resident Station Crew

FUEL HEATER, NASA Technology Images

HEATER HEAD FOR STIRLING ENGINE

A white bird is standing in the water. Heron bird feather.

EDWARDS, Calif. – Against a setting sun, space shuttle Endeavour undergoes recovery operations on Edwards Air Force Base in California after its landing. The orbiter convoy normally begins recovery operations in earnest about two hours before the shuttle is scheduled to land. Specially designed vehicles or units and a team of trained personnel “safe” the orbiter and prepare it for towing. Purge and Coolant Umbilical Access Vehicles are moved into position behind the orbiter to get access to the umbilical areas. The flight crew is replaced aboard the orbiter by exchange sup¬port personnel who prepare the orbiter for ground tow operations, install switch guards and remove data packages from any onboard experiments. After a total safety downgrade, vehicle ground personnel make numerous preparations for the towing operation, including install¬ing landing gear lock pins, disconnecting the nose landing gear drag link, positioning the towing vehicle in front of the orbiter and connecting the tow bar. The decision to land Endeavour at Edwards was made due to weather concerns at NASA's Kennedy Space Center in Florida. In the 52nd landing at Edwards, Endeavour touched down at 4:25 p.m. EST to end the STS-126 mission, completing its 16-day journey of more than 6.6 million miles in space. Endeavour will be returned to Kennedy atop a Shuttle Carrier Aircraft, or SCA, a modified Boeing 747 jetliner. Photo credit: NASA/Tony Landis, VAFB KSC-08pd3887

AIRMAN 1ST Class Eric Valdes and STAFF SGT. Kerry Ferguson, 952nd Aircraft Generation Squadron, prepare to hook an H-1 heater to an E-3 during preflight operations.(Published in AIRMAN Magazine May 1996 ) Exact Date Shot Unknown

KENNEDY SPACE CENTER, FLA. -- After greeting the media on the Shuttle Landing Facility at NASA's Kennedy Space Center, the STS-122 crew stands in front of space shuttle Atlantis for a final group photo. From left are Mission Specialists Leland Melvin, Hans Schlegel, Rex Walheim and Stanley Love, Pilot Alan Poindexter and Commander Steve Frick. Schlegel represents the European Space Agency. After a round trip of nearly 5.3 million miles, space shuttle Atlantis and crew returned to Earth with a landing at 9:07 a.m. EST. The shuttle landed on orbit 202 to complete the 13-day STS-122 mission. Main gear touchdown was 9:07:10 a.m. Nose gear touchdown was 9:07:20 a.m. Wheel stop was at 9:08:08 a.m. Mission elapsed time was 12 days, 18 hours, 21 minutes and 44 seconds. During the mission, Atlantis' crew installed the new Columbus laboratory, leaving a larger space station and one with increased science capabilities. The Columbus Research Module adds nearly 1,000 cubic feet of habitable volume and affords room for 10 experiment racks, each an independent science lab. Photo credit: NASA/Jack Pfaller KSC-08pd0407

CONSTRUCTION AT THE PROPULSION SYSTEMS LABORATORY PSL EQUIPMENT BUILDING PSLEB AND PROPULSION SYSTEMS LABORATORY PSL HEATER BUILDING

A bird is perched on a tree branch. Heron bird tree, animals.

A bird that is standing in some water. Heron bird wildlife.

A couple of birds flying over a body of water. Mar ocean beach, travel vacation.

A white swan is flapping its wings in the water. Heron white bird.

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the Mobile Remote Servicer Base System (MBS) is viewed from the front right side. The MBS is part of the Canadian Space Agency’s (CSA) Space Station Remote Manipulator System (SSRMS), known as the Canadian arm. Scheduled to be launched in February 2002 on flight UF-2 to the International Space Station, the MBS will complete the Canadian Mobile Servicing System, or MSS. The mechanical arm will have the capability to "inchworm" from the U.S. Lab fixture to the MSS and travel along the Truss to work sites on the Space Station KSC00pp1413

Topics

kennedy space center heron orbiter discovery orbiter discovery lands runway facility runway main gear touchdown main gear touchdown wheel sts goals international space station swapout crew resident station crew delivery equipment supplies experiments installation ammonia servicer ammonia servicer heater cables heater cables truss million million miles space shuttle program five missions daylight ksc ksc space shuttle high resolution nasa